Fire sprinkler system installation · North Carolina
Fire & Life Safety America Raleigh
Raleigh, NC · ~98 workers · 6 years of OSHA Injury Tracking Application data.
- C
- Average Safety Record
- 2.8
- Avg TCR
- 2.8
- Industry avg
- 0
- Fatalities
The verdict
Fire & Life Safety America Raleigh runs at 99% of its industry's injury rate - about level with the typical Fire sprinkler system installation workplace, earning a grade C.
Fire & Life Safety America Raleigh: 2.8 TCR = 99% of Fire sprinkler system installation BLS 2.8 · 6y Form 300A (see methodology below)
Fire & Life Safety America Raleigh safety composite
Fire & Life Safety America Raleigh scores strongest on total case rate (tcr) (safer than 57% of same-industry peers) and weakest on dart rate (safer than 50%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
53/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- C 2.76 per 100 workers
Safer than 57% of industry peers
- DART rate
- D 1.14 per 100 workers
Safer than 50% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
TCR Δ
−2.0
2016→2021
Fire & Life Safety America Raleigh injury rate improved
Fire & Life Safety America Raleigh's TCR fell 2.0 from 3.2 in 2016 to 1.1 in 2021. Peak filing year was 2018 at 5.2 TCR. In 2021, DART was 0.41× this establishment's average TCR (severity share of cases).
2016=3.2 · 2017=2.0 · 2018=5.2 · 2019=1.0 · 2020=4.1 · 2021=1.1
OSHA ITA Form 300A scorecard
Establishment book 238220 · Raleigh, NC AT/BELOW-IND · SMALL
Grade C · TCR 2.8 · 99% of ind
- DART 1.1 DART
- RANK #100/212
- PHOTO Comfort Systems USA …
- BOOK 6y book
- INJ 15 inj
- SIZE ~98 FTE
Nearest TCR peer: Comfort Systems USA Ohio Cleveland (0.0 TCR gap)
Read with this employer → · Industry book → · North Carolina employers → · Look up another →
Fire & Life Safety America Raleigh in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Fire & Life Safety America Raleigh
2.8 TCR
- Comfort System
Comfort Systems USA Ohio Cleveland
2.8 TCR
- Vincentini Plu
Vincentini Plumbing Inc
2.8 TCR
- Corporate Offi
Corporate Office
2.8 TCR
- Tennessee offi
Tennessee office
2.8 TCR
What this shows Fire & Life Safety America Raleigh averages 2.8 TCR (99% of the Fire sprinkler system installation BLS benchmark).
Fire & Life Safety America Raleigh TCR series: 2016=3.2 · 2017=2 · 2018=5.2 · 2019=1 · 2020=4.1 · 2021=1.1 · BLS 2.8
Where Fire & Life Safety America Raleigh falls in its industry
5,793 Fire sprinkler system installa establishmentsSafer than 57% of graded establishments in this industry, whose median TCR is 3.3.
Narrower to North Carolina alone (the establishments it most directly competes with for workers and contracts): ranked #100 safest of 212 Fire sprinkler system installa employers in North Carolina.
Fire & Life Safety America Raleigh has more employees than the Fire sprinkler system installation median and a lower injury rate than the industry's median TCR of 3.3. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2021 | 1.1 | 1.1 | 0 | 1 | 0 |
| 2020 | 4.1 | 3.0 | 4 | 0 | 0 |
| 2019 | 1.0 | 1.0 | 1 | 0 | 0 |
| 2018 | 5.2 | 5.2 | 5 | 0 | 0 |
| 2017 | 2.0 | 2.0 | 2 | 0 | 0 |
| 2016 | 3.2 | 3.2 | 3 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
238220 · NC · Raleigh
5,793 Fire sprinkler system installation employers nationwide with a credible TCR · 16,981 rated employers in North Carolina with headcount on file · 973 employers in Raleigh, NC · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Comfort Systems USA Ohio Cleveland | 2.8 TCR |
| NAICS-TCR | Vincentini Plumbing Inc | 2.8 TCR |
| NAICS-TCR | Corporate Office | 2.8 TCR |
| NAICS-TCR | Tennessee office | 2.8 TCR |
| STATE-SIZE | Main Office | 98 FTE |
| STATE-SIZE | PEMC - Hillsborough | 98 FTE |
| STATE-SIZE | PSNC Corporate Warehouse | 98 FTE |
| STATE-SIZE | Hiller Concord | 98 FTE |
| CITY-NEAR | Headway Workforce Solutions | 13,936 FTE |
| CITY-NEAR | NC State University | 11,491 FTE |
| CITY-NEAR | UNC Rex Healthcare | 7,282 FTE |
| CITY-NEAR | SECU | 6,283 FTE |
| NAT-TCR | SRG Global | 2.8 TCR |
| NAT-TCR | Harris Rebar - Denver Colorado | 2.8 TCR |
| NAT-TCR | 49221b - North Bay Zone | 2.8 TCR |
| NAT-TCR | 42131b - Bangor Bin | 2.8 TCR |
| NAT-SIZE | JAN-CA-SNA | 98 FTE |
| NAT-SIZE | Forum Energy Technologies - Clearfield | 98 FTE |
| NAT-SIZE | Sacramento, CA Office CS | 98 FTE |
| NAT-SIZE | Westwood Manor | 98 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.