Fossil Fuel Electric Power Generation · Alabama
Generation Fossil Barry Steam Plant
Bucks, AL · ~318 workers · 2 years of OSHA Injury Tracking Application data.
- C
- Average Safety Record
- 1.1
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Generation Fossil Barry Steam Plant runs at 96% of its industry's injury rate - about level with the typical Fossil Fuel Electric Power Generation workplace, earning a grade C.
Generation Fossil Barry Steam Plant: 1.1 TCR = 96% of Fossil Fuel Electric Power Generation BLS 1.2 · 2y Form 300A (see methodology below)
Generation Fossil Barry Steam Plant safety composite
Generation Fossil Barry Steam Plant scores strongest on total case rate (tcr) (safer than 61% of same-industry peers) and weakest on dart rate (safer than 25%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
46/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- C 1.15 per 100 workers
Safer than 61% of industry peers
- DART rate
- F 1.36 per 100 workers
Safer than 25% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Rising injury rate
Generation Fossil Barry Steam Plant: 0.6 → 1.7 TCR
Peak year 2021 @ 1.7 TCR · DART/TCR 1.18× in 2021
Generation Fossil Barry Steam Plant's TCR rose 1.1 from 0.6 in 2018 to 1.7 in 2021. In 2021, DART was 1.18× this establishment's average TCR (severity share of cases).
OSHA ITA Form 300A scorecard
Establishment book 221112 · Bucks, AL AT/BELOW-IND · MID
Grade C · TCR 1.1 · 96% of ind
- DART 1.4 DART
- RANK #16/28
- PHOTO 00708 DAVE JOHNSTON …
- BOOK 2y book
- INJ 7 inj
- SIZE ~318 FTE
Nearest TCR peer: 00708 DAVE JOHNSTON PLNT (0.0 TCR gap)
Read with this employer → · Industry book → · Alabama employers → · Look up another →
Generation Fossil Barry Steam Plant in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- Middletown Pow
Middletown Power LLC
1.2 TCR
- This site
Generation Fossil Barry Steam Plant
1.1 TCR
- 00708 DAVE JOH
00708 DAVE JOHNSTON PLNT
1.1 TCR
- SALT RIVER PRO
SALT RIVER PROJECT DISTRICT VALLEY
1.1 TCR
- Sanford Plant
Sanford Plant
1.1 TCR
What this shows Generation Fossil Barry Steam Plant averages 1.1 TCR (96% of the Fossil Fuel Electric Power Generation BLS benchmark).
Generation Fossil Barry Steam Plant TCR series: 2018=0.6 · 2021=1.7 · BLS 1.2
Where Generation Fossil Barry Steam Plant falls in its industry
846 Fossil Fuel Electric Power Gen establishmentsSafer than 61% of graded establishments in this industry, whose median TCR is 1.5.
Narrower to Alabama alone (the establishments it most directly competes with for workers and contracts): ranked #16 safest of 28 Fossil Fuel Electric Power Gen employers in Alabama.
Generation Fossil Barry Steam Plant has more employees than the Fossil Fuel Electric Power Generation median and a lower injury rate than the industry's median TCR of 1.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2021 | 1.7 | 1.4 | 5 | 0 | 0 |
| 2018 | 0.6 | 0.3 | 2 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221112 · AL · Bucks
846 Fossil Fuel Electric Power Generation employers nationwide with a credible TCR · 7,418 rated employers in Alabama with headcount on file · 11 employers in Bucks, AL · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | 00708 DAVE JOHNSTON PLNT | 1.1 TCR |
| NAICS-TCR | SALT RIVER PROJECT DISTRICT VALLEY | 1.1 TCR |
| NAICS-TCR | Sanford Plant | 1.1 TCR |
| NAICS-TCR | Middletown Power LLC | 1.2 TCR |
| STATE-SIZE | Westerelt Lumber | 318 FTE |
| STATE-SIZE | Oldcastle BuildingEnvelope-Tuscaloosa | 318 FTE |
| STATE-SIZE | Harvest Select Catfish | 319 FTE |
| STATE-SIZE | Flowers Bakery of Montgomery, LLC | 317 FTE |
| CITY-NEAR | Generation Fossil Barry Steam Plant - Alabama Power | 339 FTE |
| CITY-NEAR | Fossil Generation Barry Steam Plant | 335 FTE |
| CITY-NEAR | Plant Barry - APC | 292 FTE |
| CITY-NEAR | 192158 Plant Barry Units 4&5 | 286 FTE |
| NAT-TCR | Courtyard Lake George | 1.1 TCR |
| NAT-TCR | CSI Construction Sacramento | 1.1 TCR |
| NAT-TCR | Olive Street | 1.1 TCR |
| NAT-TCR | Dot Transportation, Inc- TN | 1.1 TCR |
| NAT-SIZE | LW Engineering Plant 3 | 318 FTE |
| NAT-SIZE | iHerb / Staffmark - Easton, PA | 318 FTE |
| NAT-SIZE | Muth Electric, Inc. | 318 FTE |
| NAT-SIZE | SANTURCE | 318 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.