Addition, alteration and renovation for-sale builders, commercial and institutional building · Montana
Hammerquist Casalegno LLC
Kalispell, MT · ~30 workers · 8 years of OSHA Injury Tracking Application data.
- F
- Failing Safety Record
- 18.7
- Avg TCR
- 2.9
- Industry avg
- 0
- Fatalities
The verdict
Hammerquist Casalegno LLC runs at 645% of its industry's injury rate - far more dangerous than the typical Addition, alteration and renovation for-sale builders, commercial and institutional building workplace, earning a grade F.
Hammerquist Casalegno LLC: 18.7 TCR = 645% of Addition, alteration and renovation for-sale builders, commercial and institutional building BLS 2.9 · 8y Form 300A (see methodology below)
Hammerquist Casalegno LLC safety composite
Hammerquist Casalegno LLC scores strongest on fatalities (safer than 51% of same-industry peers) and weakest on total case rate (tcr) (safer than 1%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
19/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- F 18.7 per 100 workers
Safer than 1% of industry peers
- DART rate
- F 3.57 per 100 workers
Safer than 16% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Rising injury rate
Hammerquist Casalegno LLC: 17.8 → 32.1 TCR
Peak year 2024 @ 32.1 TCR · DART/TCR 0.19× in 2024
Hammerquist Casalegno LLC's TCR rose 14.4 from 17.8 in 2016 to 32.1 in 2024. In 2024, DART was 0.19× this establishment's average TCR (severity share of cases).
OSHA ITA Form 300A scorecard
Establishment book 236220 · Kalispell, MT ABOVE-IND · SMALL
Grade F · TCR 18.7 · 645% of ind
- DART 3.6 DART
- RANK #18/18
- PHOTO SERVPRO of Rapid Cit…
- BOOK 8y book
- INJ 39 inj
- SIZE ~30 FTE
Nearest TCR peer: SERVPRO of Rapid City, Spearfish, Gillette, Sheridan (0.1 TCR gap)
Read with this employer → · Industry book → · Montana employers → · Look up another →
Hammerquist Casalegno LLC in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- Riverside Fabr
Riverside Fabrication, Inc.
19 TCR
- Warren Constru
Warren Construction Group
18.8 TCR
- Greiner Buildi
Greiner Buildings, Inc.
18.8 TCR
- This site
Hammerquist Casalegno LLC
18.7 TCR
- SERVPRO of Rap
SERVPRO of Rapid City, Spearfish, Gillette, Sheridan
18.6 TCR
What this shows Hammerquist Casalegno LLC averages 18.7 TCR (645% of the Addition, alteration and renovation for-sale builders, commercial and institutional building BLS benchmark).
Hammerquist Casalegno LLC TCR series: 2016=17.8 · 2017=13.4 · 2019=8.1 · 2020=13.8 · 2021=17 · 2022=22.1 · 2023=25.3 · 2024=32.1 · BLS 2.9
Where Hammerquist Casalegno LLC falls in its industry
4,692 Addition, alteration and renov establishmentsSafer than 1% of graded establishments in this industry, whose median TCR is 2.3.
Narrower to Montana alone (the establishments it most directly competes with for workers and contracts): ranked #18 safest of 18 Addition, alteration and renov employers in Montana.
Hammerquist Casalegno LLC has fewer employees than the Addition, alteration and renovation for- median and a higher injury rate than the industry's median TCR of 2.3. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 32.1 | 3.6 | 9 | 0 | 0 |
| 2023 | 25.3 | 7.2 | 6 | 1 | 0 |
| 2022 | 22.1 | 11.1 | 6 | 0 | 0 |
| 2021 | 17.0 | 17.0 | 4 | 0 | 0 |
| 2020 | 13.8 | 5.5 | 5 | 0 | 0 |
| 2019 | 8.1 | 8.1 | 3 | 0 | 0 |
| 2017 | 13.4 | 4.5 | 2 | 1 | 0 |
| 2016 | 17.8 | 4.4 | 4 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
236220 · MT · Kalispell
4,692 Addition, alteration and renovation for-sale builders, commercial and institutional building employers nationwide with a credible TCR · 1,536 rated employers in Montana with headcount on file · 117 employers in Kalispell, MT · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | SERVPRO of Rapid City, Spearfish, Gillette, Sheridan | 18.6 TCR |
| NAICS-TCR | Warren Construction Group | 18.8 TCR |
| NAICS-TCR | Greiner Buildings, Inc. | 18.8 TCR |
| NAICS-TCR | Riverside Fabrication, Inc. | 19.0 TCR |
| STATE-SIZE | Avista Noxon | 30 FTE |
| STATE-SIZE | Heorot Power Management - Hardin | 30 FTE |
| STATE-SIZE | Central Heating Cooling Plumbing and Electrical | 30 FTE |
| STATE-SIZE | 41 | 30 FTE |
| CITY-NEAR | Kalispell Regional Medical Center | 2,715 FTE |
| CITY-NEAR | Logan Health Medical Center (formerly Kalispell Regional Medical Center) | 2,601 FTE |
| CITY-NEAR | Logan Health (formerly Kalispell Regional Healthcare-System) | 494 FTE |
| CITY-NEAR | MTK01, Applied Materials, Semi Tool Main | 406 FTE |
| NAT-TCR | 81 - Valley | 18.7 TCR |
| NAT-TCR | Andrew Residence | 18.7 TCR |
| NAT-TCR | ACC-IAD | 18.7 TCR |
| NAT-TCR | CIRCLE Academy Vermilion | 18.7 TCR |
| NAT-SIZE | The Expediting Co., Inc. ORD | 30 FTE |
| NAT-SIZE | Gadsden Operations Center | 30 FTE |
| NAT-SIZE | Intership Services Inc. | 30 FTE |
| NAT-SIZE | Adamstown Location | 30 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.