Electric power generation, fossil fuel (e.g., coal, oil, gas) · Texas
Handley Station
Fort Worth, TX · ~47 workers · 2 years of OSHA Injury Tracking Application data.
- D
- Poor Safety Record
- 2.0
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Handley Station runs at 171% of its industry's injury rate - more dangerous than the typical Electric power generation, fossil fuel (e.g., coal, oil, gas) workplace, earning a grade D.
Handley Station: 2.0 TCR = 171% of Electric power generation, fossil fuel (e.g., coal, oil, gas) BLS 1.2 · 2y Form 300A (see methodology below)
Handley Station safety composite
Handley Station scores strongest on dart rate (safer than 71% of same-industry peers) and weakest on total case rate (tcr) (safer than 35%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
52/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- D 2.05 per 100 workers
Safer than 35% of industry peers
- DART rate
- C 0 per 100 workers
Safer than 71% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Handley Station held a steady TCR band
Handley Station's TCR held near 0.2 from 2.0 in 2023 to 2.1 in 2024. In 2024, DART was 0× this establishment's average TCR (severity share of cases).
2023=2.0 · 2024=2.1
OSHA ITA Form 300A scorecard
Establishment book 221112 · Fort Worth, TX ABOVE-IND · SMALL
Grade D · TCR 2.0 · 171% of ind
- DART 0.0 DART
- RANK #60/86
- PHOTO Fossil Generation Ga…
- BOOK 2y book
- INJ 0 inj
- SIZE ~47 FTE
Nearest TCR peer: Fossil Generation Gadsden Steam Plant (0.0 TCR gap)
Read with this employer → · Industry book → · Texas employers → · Look up another →
Handley Station in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Handley Station
2 TCR
- Fossil Generat
Fossil Generation Gadsden Steam Plant
2 TCR
- 300A
300A
2 TCR
- Miller Steam P
Miller Steam Plant
2 TCR
- Rocky Mountain
Rocky Mountain Energy Center
2 TCR
What this shows Handley Station averages 2.0 TCR (171% of the Electric power generation, fossil fuel (e.g., coal, oil, gas) BLS benchmark).
Handley Station TCR series: 2023=2 · 2024=2.1 · BLS 1.2
Where Handley Station falls in its industry
846 Electric power generation, fos establishmentsSafer than 35% of graded establishments in this industry, whose median TCR is 1.5.
Narrower to Texas alone (the establishments it most directly competes with for workers and contracts): ranked #60 safest of 86 Electric power generation, fos employers in Texas.
Handley Station has fewer employees than the Electric power generation, fossil fuel ( median and a higher injury rate than the industry's median TCR of 1.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 2.1 | 0.0 | 0 | 1 | 0 |
| 2023 | 2.0 | 0.0 | 0 | 1 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221112 · TX · Fort Worth
846 Electric power generation, fossil fuel (e.g., coal, oil, gas) employers nationwide with a credible TCR · 38,394 rated employers in Texas with headcount on file · 1,346 employers in Fort Worth, TX · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Fossil Generation Gadsden Steam Plant | 2.0 TCR |
| NAICS-TCR | 300A | 2.0 TCR |
| NAICS-TCR | Miller Steam Plant | 2.0 TCR |
| NAICS-TCR | Rocky Mountain Energy Center | 2.0 TCR |
| STATE-SIZE | Blackstone Dilworth | 47 FTE |
| STATE-SIZE | Hartley Feeders | 47 FTE |
| STATE-SIZE | South Texas Electric Cooperative, Inc. Pearsall Energy Center | 47 FTE |
| STATE-SIZE | Comanche Electric Cooperative Association | 47 FTE |
| CITY-NEAR | Lockheed Martin Corporation US TX Fort Worth Lockheed Blvd (1093) | 16,547 FTE |
| CITY-NEAR | Lockheed Martin Corporation Fort Worth Campus (1093) | 13,805 FTE |
| CITY-NEAR | Cook Children's Medical Center | 4,998 FTE |
| CITY-NEAR | TX- Fort Worth | 4,667 FTE |
| NAT-TCR | Residence Inn Bend | 2.0 TCR |
| NAT-TCR | CA-Southern Region Office C | 2.0 TCR |
| NAT-TCR | 143 South City | 2.0 TCR |
| NAT-TCR | Elastomer | 2.0 TCR |
| NAT-SIZE | West Bend Service Center | 47 FTE |
| NAT-SIZE | Bugbee Elementary School | 47 FTE |
| NAT-SIZE | STR0323 | 47 FTE |
| NAT-SIZE | STR0540 | 47 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.