Fossil Fuel Electric Power Generation · Texas

Harrington-Reimbursable Costs

Amarillo, TX · ~25 workers · 2 years of OSHA Injury Tracking Application data.

D
Poor Safety Record
1.7
Avg TCR
1.2
Industry avg
0
Fatalities
Subscribe to safety-record updates (RSS)

The verdict

Harrington-Reimbursable Costs runs at 139% of its industry's injury rate - more dangerous than the typical Fossil Fuel Electric Power Generation workplace, earning a grade D.

Harrington-Reimbursable Costs: 1.7 TCR = 139% of Fossil Fuel Electric Power Generation BLS 1.2 · 2y Form 300A (see methodology below)

Harrington-Reimbursable Costs safety composite

Harrington-Reimbursable Costs scores strongest on dart rate (safer than 71% of same-industry peers) and weakest on total case rate (tcr) (safer than 44%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).

C

55/100

Percentile-weighted across 3 of 3 measures

Total Case Rate (TCR)
D 1.67 per 100 workers

Safer than 44% of industry peers

DART rate
C 0 per 100 workers

Safer than 71% of industry peers

Fatalities
D 0

Safer than 51% of industry peers

Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).

TCR Δ

−3.3

2023→2024

Harrington-Reimbursable Costs injury rate improved

Harrington-Reimbursable Costs's TCR fell 3.3 from 3.3 in 2023 to 0.0 in 2024. Peak filing year was 2023 at 3.3 TCR. In 2024, DART was 0× this establishment's average TCR (severity share of cases).

2023=3.3 · 2024=0.0

OSHA ITA Form 300A scorecard

Establishment book 221112 · Amarillo, TX ABOVE-IND · SMALL

Grade D · TCR 1.7 · 139% of ind

  • DART 0.0 DART
  • RANK #54/86
  • PHOTO Baldwin Energy Complex
  • BOOK 2y book
  • INJ 1 inj
  • SIZE ~25 FTE

Nearest TCR peer: Baldwin Energy Complex (0.0 TCR gap)

Read with this employer → · Industry book → · Texas employers → · Look up another →

Harrington-Reimbursable Costs in the TCR neighbourhood

Average Total Case Rate among this establishment and nearest same-industry peers

TCR

What this shows Harrington-Reimbursable Costs averages 1.7 TCR (139% of the Fossil Fuel Electric Power Generation BLS benchmark).

Source U.S. Department of Labor, OSHA Injury Tracking Application (Form 300A) As of 2026-08-25

Harrington-Reimbursable Costs TCR series: 2023=3.3 · 2024=0 · BLS 1.2

Where Harrington-Reimbursable Costs falls in its industry

846 Fossil Fuel Electric Power Gen establishments

Safer than 44% of graded establishments in this industry, whose median TCR is 1.5.

More dangerous than peersSafer than peers

Narrower to Texas alone (the establishments it most directly competes with for workers and contracts): ranked #54 safest of 86 Fossil Fuel Electric Power Gen employers in Texas.

Harrington-Reimbursable Costs (25 employees, TCR 1.7) among 29 same-industry peers, split at the industry median of 59 employees and a TCR of 1.5 2×2 strategic matrix plotting 30 entities by Average employees (X) and Total Case Rate (Y), with a crosshair dividing the plot into four quadrants. Larger & higher-riskSmaller & higher-riskLarger & saferSmaller & safer than peers 0200400600800 051015 Average employees Total Case Rate Harrington-Reimbursable Costs
Harrington-Reimbursable Costs (25 employees, TCR 1.7) among 29 same-industry peers, split at the industry median of 59 employees and a TCR of 1.5

Harrington-Reimbursable Costs has fewer employees than the Fossil Fuel Electric Power Generation median and a higher injury rate than the industry's median TCR of 1.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.

Year-by-Year Safety Data

Year TCR DART Injuries Illnesses Fatalities
2024 0.0 0.0 0 0 0
2023 3.3 3.3 1 0 0

OSHA ITA peer cross-reference

Establishment peer ledger

221112 · TX · Amarillo

846 Fossil Fuel Electric Power Generation employers nationwide with a credible TCR · 38,394 rated employers in Texas with headcount on file · 351 employers in Amarillo, TX · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.

Rel Establishment Metric
NAICS-TCR Baldwin Energy Complex 1.7 TCR
NAICS-TCR Newton Power Station 1.7 TCR
NAICS-TCR Harry L. Oswald Power Station 1.7 TCR
NAICS-TCR Generation Fossil Gaston Steam Plant 1.7 TCR
STATE-SIZE Village Farms of Monahans 25 FTE
STATE-SIZE Lubbock Feeders, LLC 25 FTE
STATE-SIZE Circle Three Feed Yard, Ltd 25 FTE
STATE-SIZE SEABOARD FOODS LP 501-508 25 FTE
CITY-NEAR Amarillo Plant 3,771 FTE
CITY-NEAR BSA Hospital LLC 2,790 FTE
CITY-NEAR 2576-12071000-12071 1,839 FTE
CITY-NEAR 2576-30 1,492 FTE
NAT-TCR Florida Roof-Tech Corp Roofing Done Right Guaranteed 1.7 TCR
NAT-TCR Cleveland Office Ocoee 1.7 TCR
NAT-TCR Advanced Wiring Solutions 1.7 TCR
NAT-TCR Care Sheet Metal & Roofing, Inc. 1.7 TCR
NAT-SIZE Uag Construction, LLC 25 FTE
NAT-SIZE Wbs - Onalaska 25 FTE
NAT-SIZE SOFIE - Sanford 25 FTE
NAT-SIZE Rocky Mountain Reagents, Inc. 25 FTE

Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →

Data Source: OSHA Injury Tracking Application (ITA), mandatory establishment-level injury/illness reports. Grades compare employer Total Case Rate (TCR) to BLS IIF industry benchmarks. Data covers years reported by this establishment: 2024, 2023. This is publicly available government data - not a legal determination of workplace conditions.
Data sourced from official public datasets. See our methodology for details.