Apartment building rental or leasing · California
Investment Concepts Inc
Orange, CA · ~292 workers · 2 years of OSHA Injury Tracking Application data.
- F
- Failing Safety Record
- 8.9
- Avg TCR
- 1.4
- Industry avg
- 0
- Fatalities
The verdict
Investment Concepts Inc runs at 638% of its industry's injury rate - far more dangerous than the typical Apartment building rental or leasing workplace, earning a grade F.
Investment Concepts Inc: 8.9 TCR = 638% of Apartment building rental or leasing BLS 1.4 · 2y Form 300A (see methodology below)
Investment Concepts Inc safety composite
Investment Concepts Inc scores strongest on fatalities (safer than 50% of same-industry peers) and weakest on total case rate (tcr) (safer than 15%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
31/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- F 8.93 per 100 workers
Safer than 15% of industry peers
- DART rate
- D 3.35 per 100 workers
Safer than 37% of industry peers
- Fatalities
- D 0
Safer than 50% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Rising injury rate
Investment Concepts Inc: 6.9 → 11.0 TCR
Peak year 2018 @ 11.0 TCR · DART/TCR 0.38× in 2018
Investment Concepts Inc's TCR rose 4.1 from 6.9 in 2017 to 11.0 in 2018. In 2018, DART was 0.38× this establishment's average TCR (severity share of cases).
OSHA ITA Form 300A scorecard
Establishment book 531110 · Orange, CA ABOVE-IND · MID
Grade F · TCR 8.9 · 638% of ind
- DART 3.4 DART
- RANK #97/113
- PHOTO Arbor Terrace at Ham…
- BOOK 2y book
- INJ 33 inj
- SIZE ~292 FTE
Nearest TCR peer: Arbor Terrace at Hamilton Mill IL (0.0 TCR gap)
Read with this employer → · Industry book → · California employers → · Look up another →
Investment Concepts Inc in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- Point Pleasant
Point Pleasant Retirement Community
9 TCR
- This site
Investment Concepts Inc
8.9 TCR
- Arbor Terrace
Arbor Terrace at Hamilton Mill IL
8.9 TCR
- Lobos Manageme
Lobos Management
8.9 TCR
- Portland Housi
Portland Housing Authority
8.9 TCR
What this shows Investment Concepts Inc averages 8.9 TCR (638% of the Apartment building rental or leasing BLS benchmark).
Investment Concepts Inc TCR series: 2017=6.9 · 2018=11 · BLS 1.4
Where Investment Concepts Inc falls in its industry
1,100 Apartment building rental or l establishmentsSafer than 15% of graded establishments in this industry, whose median TCR is 4.5.
Narrower to California alone (the establishments it most directly competes with for workers and contracts): ranked #97 safest of 113 Apartment building rental or l employers in California.
Investment Concepts Inc has more employees than the Apartment building rental or leasing median and a higher injury rate than the industry's median TCR of 4.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2018 | 11.0 | 3.4 | 22 | 1 | 0 |
| 2017 | 6.9 | 5.8 | 11 | 2 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
531110 · CA · Orange
1,100 Apartment building rental or leasing employers nationwide with a credible TCR · 51,834 rated employers in California with headcount on file · 319 employers in Orange, CA · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Arbor Terrace at Hamilton Mill IL | 8.9 TCR |
| NAICS-TCR | Lobos Management | 8.9 TCR |
| NAICS-TCR | Point Pleasant Retirement Community | 9.0 TCR |
| NAICS-TCR | Portland Housing Authority | 8.9 TCR |
| STATE-SIZE | MATTHIAS VILLEGAS JR FLC | 292 FTE |
| STATE-SIZE | Plant Construction Company L.P. | 292 FTE |
| STATE-SIZE | Rokstad Power Inc. | 292 FTE |
| STATE-SIZE | Sharpe Interior Systems, Inc. | 292 FTE |
| CITY-NEAR | UC Irvine Health | 6,191 FTE |
| CITY-NEAR | CHOC - CHildren's Hospital of Orange County | 4,962 FTE |
| CITY-NEAR | CHOC Children's Orange | 3,693 FTE |
| CITY-NEAR | CHOC Children's Orange V2 | 3,652 FTE |
| NAT-TCR | Residencial Sabana Abajo | 8.9 TCR |
| NAT-TCR | Penske : 5079-00 Accuride-DCM/Batavia, IL | 8.9 TCR |
| NAT-TCR | KY-02 | 8.9 TCR |
| NAT-TCR | Kerry - Plant City FL | 8.9 TCR |
| NAT-SIZE | Nationwide Office Cleaners, LLC | 292 FTE |
| NAT-SIZE | O'Hare (Iloha) | 292 FTE |
| NAT-SIZE | Tampa Bay Trane | 292 FTE |
| NAT-SIZE | Donan Engineering | 292 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.