Westminster, SC · ~22 workers · 2 years of OSHA Injury Tracking Application data.

C
Average Safety Record
3.9
Avg TCR
3.3
Industry avg
0
Fatalities
Subscribe to safety-record updates (RSS)

The verdict

Morgan Concrete Company - Oconee Plant runs at 118% of its industry's injury rate - about level with the typical Ready-mix concrete manufacturing and distributing workplace, earning a grade C.

Morgan Concrete Company - Oconee Plant: 3.9 TCR = 118% of Ready-mix concrete manufacturing and distributing BLS 3.3 · 2y Form 300A (see methodology below)

Morgan Concrete Company - Oconee Plant safety composite

Morgan Concrete Company - Oconee Plant scores strongest on total case rate (tcr) (safer than 57% of same-industry peers) and weakest on dart rate (safer than 14%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).

D

40/100

Percentile-weighted across 3 of 3 measures

Total Case Rate (TCR)
C 3.9 per 100 workers

Safer than 57% of industry peers

DART rate
F 7.81 per 100 workers

Safer than 14% of industry peers

Fatalities
D 0

Safer than 51% of industry peers

Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).

Rising injury rate

Morgan Concrete Company - Oconee Plant: 0.0 → 7.8 TCR

Peak year 2024 @ 7.8 TCR · DART/TCR 2× in 2024

Morgan Concrete Company - Oconee Plant's TCR rose 7.8 from 0.0 in 2023 to 7.8 in 2024. In 2024, DART was 2× this establishment's average TCR (severity share of cases).

OSHA ITA Form 300A scorecard

Establishment book 327320 · Westminster, SC ABOVE-IND · SMALL

Grade C · TCR 3.9 · 118% of ind

  • DART 7.8 DART
  • RANK #8/24
  • PHOTO Bow RMC Plant
  • BOOK 2y book
  • INJ 2 inj
  • SIZE ~22 FTE

Nearest TCR peer: Bow RMC Plant (0.0 TCR gap)

Read with this employer → · Industry book → · South Carolina employers → · Look up another →

Morgan Concrete Company - Oconee Plant in the TCR neighbourhood

Average Total Case Rate among this establishment and nearest same-industry peers

TCR

What this shows Morgan Concrete Company - Oconee Plant averages 3.9 TCR (118% of the Ready-mix concrete manufacturing and distributing BLS benchmark).

Source U.S. Department of Labor, OSHA Injury Tracking Application (Form 300A) As of 2026-08-25

Morgan Concrete Company - Oconee Plant TCR series: 2023=0 · 2024=7.8 · BLS 3.3

Where Morgan Concrete Company - Oconee Plant falls in its industry

1,316 Ready-mix concrete manufacturi establishments

Safer than 57% of graded establishments in this industry, whose median TCR is 4.5.

More dangerous than peersSafer than peers

Narrower to South Carolina alone (the establishments it most directly competes with for workers and contracts): ranked #8 safest of 24 Ready-mix concrete manufacturi employers in South Carolina.

Morgan Concrete Company - Oconee Plant (22 employees, TCR 3.9) among 29 same-industry peers, split at the industry median of 33 employees and a TCR of 4.5 2×2 strategic matrix plotting 30 entities by Average employees (X) and Total Case Rate (Y), with a crosshair dividing the plot into four quadrants. Larger & higher-riskSmaller & higher-riskLarger & saferSmaller & safer than peers 0100200300400500 051015 Average employees Total Case Rate Morgan Concrete Company - Oconee Plant
Morgan Concrete Company - Oconee Plant (22 employees, TCR 3.9) among 29 same-industry peers, split at the industry median of 33 employees and a TCR of 4.5

Morgan Concrete Company - Oconee Plant has fewer employees than the Ready-mix concrete manufacturing and dis median and a lower injury rate than the industry's median TCR of 4.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.

Year-by-Year Safety Data

Year TCR DART Injuries Illnesses Fatalities
2024 7.8 7.8 2 0 0
2023 0.0 0.0 0 0 0

OSHA ITA peer cross-reference

Establishment peer ledger

327320 · SC · Westminster

1,316 Ready-mix concrete manufacturing and distributing employers nationwide with a credible TCR · 7,610 rated employers in South Carolina with headcount on file · 14 employers in Westminster, SC · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.

Rel Establishment Metric
NAICS-TCR Bow RMC Plant 3.9 TCR
NAICS-TCR Champion Concrete National Ready Mix - Gregory Texas 3.9 TCR
NAICS-TCR Transit Mix North Plant 3.9 TCR
NAICS-TCR Silhol Builders Supply Co. 3.9 TCR
STATE-SIZE ISE Newberry Liquid Plant 22 FTE
STATE-SIZE Summerville SC 22 FTE
STATE-SIZE Allendale Biomass LLC 22 FTE
STATE-SIZE Greenville Business Office 22 FTE
CITY-NEAR Sandvik Coromant PU Westminster 279 FTE
CITY-NEAR Lift Technologies, Inc. 271 FTE
CITY-NEAR Ulbrich Specialty Wire Products 160 FTE
CITY-NEAR Baxter Manufacturing LLC 144 FTE
NAT-TCR Glassmere Fuel Service 3.9 TCR
NAT-TCR Crave Brothers Farm 3.9 TCR
NAT-TCR K/C Welding Inc. 3.9 TCR
NAT-TCR Forming Technologies 3.9 TCR
NAT-SIZE McGriff Tire Company 22 FTE
NAT-SIZE Oaks at Evans 22 FTE
NAT-SIZE Chowchilla Water District 22 FTE
NAT-SIZE Rich Coast Corporation 22 FTE

Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →

Data Source: OSHA Injury Tracking Application (ITA), mandatory establishment-level injury/illness reports. Grades compare employer Total Case Rate (TCR) to BLS IIF industry benchmarks. Data covers years reported by this establishment: 2024, 2023. This is publicly available government data - not a legal determination of workplace conditions.
Data sourced from official public datasets. See our methodology for details.