Footing and foundation concrete contractors · California
Morley Builders Inc
Santa Monica, CA · ~494 workers · 9 years of OSHA Injury Tracking Application data.
- C
- Average Safety Record
- 2.8
- Avg TCR
- 2.8
- Industry avg
- 1
- Fatality
The verdict
Morley Builders Inc runs at 101% of its industry's injury rate - about level with the typical Footing and foundation concrete contractors workplace, earning a grade C.
Morley Builders Inc: 2.8 TCR = 101% of Footing and foundation concrete contractors BLS 2.8 · 9y Form 300A (see methodology below)
Morley Builders Inc safety composite
Morley Builders Inc scores strongest on total case rate (tcr) (safer than 62% of same-industry peers) and weakest on fatalities (safer than 1%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
46/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- C 2.82 per 100 workers
Safer than 62% of industry peers
- DART rate
- C 0.63 per 100 workers
Safer than 59% of industry peers
- Fatalities
- F 1
Safer than 1% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
TCR Δ
−3.0
2016→2024
Morley Builders Inc injury rate improved
Morley Builders Inc's TCR fell 3.0 from 3.6 in 2016 to 0.6 in 2024. Peak filing year was 2022 at 4.7 TCR. In 2024, DART was 0.22× this establishment's average TCR (severity share of cases).
2016=3.6 · 2017=3.0 · 2018=2.0 · 2019=3.4 · 2020=2.9 · 2021=3.0 · 2022=4.7 · 2023=2.2 · 2024=0.6
OSHA ITA Form 300A scorecard
Establishment book 238110 · Santa Monica, CA ABOVE-IND · MID
Grade C · TCR 2.8 · 101% of ind
- DART 0.6 DART
- RANK #52/166
- PHOTO Natola Concrete Inc.
- BOOK 9y book
- INJ 133 inj
- SIZE ~494 FTE
Nearest TCR peer: Natola Concrete Inc. (0.0 TCR gap)
Read with this employer → · Industry book → · California employers → · Look up another →
Morley Builders Inc in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Morley Builders Inc
2.8 TCR
- Natola Concret
Natola Concrete Inc.
2.8 TCR
- A Gathering Pl
A Gathering Place
2.8 TCR
- K.A.R. CONSTRU
K.A.R. CONSTRUCTION INC.
2.8 TCR
- Commercial For
Commercial Forming Corp South
2.8 TCR
What this shows Morley Builders Inc averages 2.8 TCR (101% of the Footing and foundation concrete contractors BLS benchmark).
Morley Builders Inc TCR series: 2016=3.6 · 2017=3 · 2018=2 · 2019=3.4 · 2020=2.9 · 2021=3 · 2022=4.7 · 2023=2.2 · 2024=0.6 · BLS 2.8
Where Morley Builders Inc falls in its industry
1,314 Footing and foundation concret establishmentsSafer than 62% of graded establishments in this industry, whose median TCR is 3.8.
Narrower to California alone (the establishments it most directly competes with for workers and contracts): ranked #52 safest of 166 Footing and foundation concret employers in California.
Morley Builders Inc has more employees than the Footing and foundation concrete contract median and a lower injury rate than the industry's median TCR of 3.8. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 0.6 | 0.6 | 2 | 0 | 0 |
| 2023 | 2.2 | 1.9 | 8 | 0 | 0 |
| 2022 | 4.7 | 3.6 | 17 | 0 | 0 |
| 2021 | 3.0 | 2.7 | 19 | 0 | 0 |
| 2020 | 2.9 | 2.4 | 17 | 0 | 1 |
| 2019 | 3.4 | 3.2 | 18 | 0 | 0 |
| 2018 | 2.0 | 1.4 | 10 | 0 | 0 |
| 2017 | 3.0 | 2.6 | 18 | 0 | 0 |
| 2016 | 3.6 | 3.6 | 24 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
238110 · CA · Santa Monica
1,314 Footing and foundation concrete contractors employers nationwide with a credible TCR · 51,834 rated employers in California with headcount on file · 133 employers in Santa Monica, CA · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Natola Concrete Inc. | 2.8 TCR |
| NAICS-TCR | A Gathering Place | 2.8 TCR |
| NAICS-TCR | K.A.R. CONSTRUCTION INC. | 2.8 TCR |
| NAICS-TCR | Commercial Forming Corp South | 2.8 TCR |
| STATE-SIZE | DC4 DC4 STOCKTON CA | 494 FTE |
| STATE-SIZE | HCIDLA Garland Bldg. | 494 FTE |
| STATE-SIZE | REYES AG ENTERPRISE, INC. | 495 FTE |
| STATE-SIZE | Nihon Kohden America llc | 495 FTE |
| CITY-NEAR | Hulu-DMED | 1,522 FTE |
| CITY-NEAR | 2252-00000735 | 1,520 FTE |
| CITY-NEAR | CA173 PROVIDENCE SAINT JOHN S HEALTH CTR-SANTA | 1,414 FTE |
| CITY-NEAR | Santa Monica | 919 FTE |
| NAT-TCR | Dal-Tile 152 Las Vegas | 2.8 TCR |
| NAT-TCR | M3 Contracting LLC | 2.8 TCR |
| NAT-TCR | Wall Colmonoy Corporation, Los Lunas | 2.8 TCR |
| NAT-TCR | Serco - Pascagoula Wisconsin Loop,MS | 2.8 TCR |
| NAT-SIZE | The Post Oak Hotel at Uptown Park | 494 FTE |
| NAT-SIZE | Aspirus Langlade Hospital | 494 FTE |
| NAT-SIZE | Marymount Manhattan College | 494 FTE |
| NAT-SIZE | Golden Valley West | 494 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.