Commercial building construction · Puerto Rico

PCTM Construction Corp.

San Juan, PR · ~34 workers · 7 years of OSHA Injury Tracking Application data.

A
Excellent Safety Record
0.6
Avg TCR
2.9
Industry avg
0
Fatalities
Subscribe to safety-record updates (RSS)

The verdict

PCTM Construction Corp. runs at 19% of its industry's injury rate - far safer than the typical Commercial building construction workplace, earning a grade A.

PCTM Construction Corp.: 0.6 TCR = 19% of Commercial building construction BLS 2.9 · 7y Form 300A (see methodology below)

PCTM Construction Corp. safety composite

PCTM Construction Corp. scores strongest on total case rate (tcr) (safer than 90% of same-industry peers) and weakest on fatalities (safer than 51%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).

C

74/100

Percentile-weighted across 3 of 3 measures

Total Case Rate (TCR)
A 0.55 per 100 workers

Safer than 90% of industry peers

DART rate
C 0 per 100 workers

Safer than 73% of industry peers

Fatalities
D 0

Safer than 51% of industry peers

Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).

TCR Δ

−3.9

2017→2024

PCTM Construction Corp. injury rate improved

PCTM Construction Corp.'s TCR fell 3.9 from 3.9 in 2017 to 0.0 in 2024. Peak filing year was 2017 at 3.9 TCR. In 2024, DART was 0× this establishment's average TCR (severity share of cases).

2017=3.9 · 2018=0.0 · 2019=0.0 · 2020=0.0 · 2022=0.0 · 2023=0.0 · 2024=0.0

OSHA ITA Form 300A scorecard

Establishment book 236220 · San Juan, PR AT/BELOW-IND · SMALL

Grade A · TCR 0.6 · 19% of ind

  • DART 0.0 DART
  • RANK #2/8
  • PHOTO AP Gulf States, Inc.
  • BOOK 7y book
  • INJ 1 inj
  • SIZE ~34 FTE

Nearest TCR peer: AP Gulf States, Inc. (0.0 TCR gap)

Read with this employer → · Industry book → · Puerto Rico employers → · Look up another →

PCTM Construction Corp. in the TCR neighbourhood

Average Total Case Rate among this establishment and nearest same-industry peers

TCR

What this shows PCTM Construction Corp. averages 0.6 TCR (19% of the Commercial building construction BLS benchmark).

Source U.S. Department of Labor, OSHA Injury Tracking Application (Form 300A) As of 2026-08-25

PCTM Construction Corp. TCR series: 2017=3.9 · 2018=0 · 2019=0 · 2020=0 · 2022=0 · 2023=0 · 2024=0 · BLS 2.9

Where PCTM Construction Corp. falls in its industry

4,692 Commercial building constructi establishments

Safer than 90% of graded establishments in this industry, whose median TCR is 2.3.

More dangerous than peersSafer than peers

Narrower to Puerto Rico alone (the establishments it most directly competes with for workers and contracts): ranked #2 safest of 8 Commercial building constructi employers in Puerto Rico.

PCTM Construction Corp. (34 employees, TCR 0.6) among 29 same-industry peers, split at the industry median of 55 employees and a TCR of 2.3 2×2 strategic matrix plotting 30 entities by Average employees (X) and Total Case Rate (Y), with a crosshair dividing the plot into four quadrants. Larger & higher-riskSmaller & higher-riskLarger & saferSmaller & safer than peers 0100200300400500 02468 Average employees Total Case Rate PCTM Construction Corp.
PCTM Construction Corp. (34 employees, TCR 0.6) among 29 same-industry peers, split at the industry median of 55 employees and a TCR of 2.3

PCTM Construction Corp. has fewer employees than the Commercial building construction median and a lower injury rate than the industry's median TCR of 2.3. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.

Year-by-Year Safety Data

Year TCR DART Injuries Illnesses Fatalities
2024 0.0 0.0 0 0 0
2023 0.0 0.0 0 0 0
2022 0.0 0.0 0 0 0
2020 0.0 0.0 0 0 0
2019 0.0 0.0 0 0 0
2018 0.0 0.0 0 0 0
2017 3.9 3.9 1 0 0

OSHA ITA peer cross-reference

Establishment peer ledger

236220 · PR · San Juan

4,692 Commercial building construction employers nationwide with a credible TCR · 1,632 rated employers in Puerto Rico with headcount on file · 262 employers in San Juan, PR · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.

Rel Establishment Metric
NAICS-TCR AP Gulf States, Inc. 0.6 TCR
NAICS-TCR Phoenix Office 0.6 TCR
NAICS-TCR Loberg Construction Co. 0.6 TCR
NAICS-TCR Competitive Edge Partners & Consulting, LLC 0.6 TCR
STATE-SIZE LUMA, Barranquitas Fleet Operations and Warehouse 34 FTE
STATE-SIZE 43-BRIGADAS 34 FTE
STATE-SIZE Brand Energy Infrastructure Services of Puerto Rico Corp. - AES Power Plant 34 FTE
STATE-SIZE Lux Global Label Puerto Rico, LLC 34 FTE
CITY-NEAR Policia de Puerto Rico 13,672 FTE
CITY-NEAR Autoridad de Energia Electrica 5,784 FTE
CITY-NEAR Tribunal de Justicia 5,096 FTE
CITY-NEAR Autoridad de Acueductos y Alcantarillados de Puerto Rico 4,195 FTE
NAT-TCR Janssen Pharmaceuticals Raritan 0.6 TCR
NAT-TCR By Light 0.6 TCR
NAT-TCR Atg - Stm 0.6 TCR
NAT-TCR GRAD Annapolis 0.6 TCR
NAT-SIZE AIM Recycling Erie, LLC 34 FTE
NAT-SIZE Lewis County Opportunities, Inc. 34 FTE
NAT-SIZE Manufacturing 34 FTE
NAT-SIZE The Prull Group, Inc. 34 FTE

Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →

Data Source: OSHA Injury Tracking Application (ITA), mandatory establishment-level injury/illness reports. Grades compare employer Total Case Rate (TCR) to BLS IIF industry benchmarks. Data covers years reported by this establishment: 2024, 2023, 2022, 2020, 2019, 2018, 2017. This is publicly available government data - not a legal determination of workplace conditions.
Data sourced from official public datasets. See our methodology for details.