Concrete batch plants (including temporary) · North Carolina

Plant 30 Main Plant

Charlotte, NC · ~52 workers · 5 years of OSHA Injury Tracking Application data.

D
Poor Safety Record
6.6
Avg TCR
3.3
Industry avg
0
Fatalities
Subscribe to safety-record updates (RSS)

The verdict

Plant 30 Main Plant runs at 199% of its industry's injury rate - more dangerous than the typical Concrete batch plants (including temporary) workplace, earning a grade D.

Plant 30 Main Plant: 6.6 TCR = 199% of Concrete batch plants (including temporary) BLS 3.3 · 5y Form 300A (see methodology below)

Plant 30 Main Plant safety composite

Plant 30 Main Plant scores strongest on dart rate (safer than 55% of same-industry peers) and weakest on total case rate (tcr) (safer than 28%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).

D

43/100

Percentile-weighted across 3 of 3 measures

Total Case Rate (TCR)
F 6.56 per 100 workers

Safer than 28% of industry peers

DART rate
C 2.16 per 100 workers

Safer than 55% of industry peers

Fatalities
D 0

Safer than 51% of industry peers

Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).

Rising injury rate

Plant 30 Main Plant: 1.1 → 4.3 TCR

Peak year 2019 @ 17.6 TCR · DART/TCR 0.33× in 2020

Plant 30 Main Plant's TCR rose 3.2 from 1.1 in 2016 to 4.3 in 2020. Peak filing year was 2019 at 17.6 TCR. In 2020, DART was 0.33× this establishment's average TCR (severity share of cases).

OSHA ITA Form 300A scorecard

Establishment book 327320 · Charlotte, NC ABOVE-IND · SMALL

Grade D · TCR 6.6 · 199% of ind

  • DART 2.2 DART
  • RANK #38/43
  • PHOTO 30-15
  • BOOK 5y book
  • INJ 21 inj
  • SIZE ~52 FTE

Nearest TCR peer: 30-15 (0.0 TCR gap)

Read with this employer → · Industry book → · North Carolina employers → · Look up another →

Plant 30 Main Plant in the TCR neighbourhood

Average Total Case Rate among this establishment and nearest same-industry peers

TCR

What this shows Plant 30 Main Plant averages 6.6 TCR (199% of the Concrete batch plants (including temporary) BLS benchmark).

Source U.S. Department of Labor, OSHA Injury Tracking Application (Form 300A) As of 2026-08-25

Plant 30 Main Plant TCR series: 2016=1.1 · 2017=4.4 · 2018=5.4 · 2019=17.6 · 2020=4.3 · BLS 3.3

Where Plant 30 Main Plant falls in its industry

1,316 Concrete batch plants (includi establishments

Safer than 28% of graded establishments in this industry, whose median TCR is 4.5.

More dangerous than peersSafer than peers

Narrower to North Carolina alone (the establishments it most directly competes with for workers and contracts): ranked #38 safest of 43 Concrete batch plants (includi employers in North Carolina.

Plant 30 Main Plant (52 employees, TCR 6.6) among 29 same-industry peers, split at the industry median of 33 employees and a TCR of 4.5 2×2 strategic matrix plotting 30 entities by Average employees (X) and Total Case Rate (Y), with a crosshair dividing the plot into four quadrants. Larger & higher-riskSmaller & higher-riskLarger & saferSmaller & safer than peers 0100200300400500 051015 Average employees Total Case Rate Plant 30 Main Plant
Plant 30 Main Plant (52 employees, TCR 6.6) among 29 same-industry peers, split at the industry median of 33 employees and a TCR of 4.5

Plant 30 Main Plant has more employees than the Concrete batch plants (including tempora median and a higher injury rate than the industry's median TCR of 4.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.

Year-by-Year Safety Data

Year TCR DART Injuries Illnesses Fatalities
2020 4.3 2.2 2 0 0
2019 17.6 14.1 10 0 0
2018 5.4 1.4 4 0 0
2017 4.4 3.3 4 0 0
2016 1.1 1.1 1 0 0

OSHA ITA peer cross-reference

Establishment peer ledger

327320 · NC · Charlotte

1,316 Concrete batch plants (including temporary) employers nationwide with a credible TCR · 16,981 rated employers in North Carolina with headcount on file · 2,058 employers in Charlotte, NC · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.

Rel Establishment Metric
NAICS-TCR 30-15 6.6 TCR
NAICS-TCR Allied Concrete & Supply Co., Inc. 6.6 TCR
NAICS-TCR LMC Plano 6.6 TCR
NAICS-TCR Henderson Plant #71 6.5 TCR
STATE-SIZE Sutton Energy Complex CC/CT 52 FTE
STATE-SIZE Windsor Investments LLC d/b/a Windsor Homes 52 FTE
STATE-SIZE Wilson Covington Construction Company 52 FTE
STATE-SIZE Office 52 FTE
CITY-NEAR 1101-Carolinas Medical Center (1101) 8,444 FTE
CITY-NEAR 0001-Carolinas Medical Center 8,032 FTE
CITY-NEAR 4795-AA-CLT-CHARLOTTE-CLT-TRML 7,295 FTE
CITY-NEAR Novant Health Presbyterian Medical Center 4,973 FTE
NAT-TCR Tennova Healthcare-Cleveland 6.6 TCR
NAT-TCR Blue Apron - Arlington Fullfillment 6.6 TCR
NAT-TCR Winnebago Industries - Chris Craft 6.6 TCR
NAT-TCR Paragon Community Services 6.6 TCR
NAT-SIZE Food Source 704-Sacramento 52 FTE
NAT-SIZE YNG-ODFL 52 FTE
NAT-SIZE MMP - 272 Congress St 52 FTE
NAT-SIZE Wfl Sarasota 52 FTE

Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →

Data Source: OSHA Injury Tracking Application (ITA), mandatory establishment-level injury/illness reports. Grades compare employer Total Case Rate (TCR) to BLS IIF industry benchmarks. Data covers years reported by this establishment: 2020, 2019, 2018, 2017, 2016. This is publicly available government data - not a legal determination of workplace conditions.
Data sourced from official public datasets. See our methodology for details.