Fossil Fuel Electric Generation · Texas
Plant X-128
Earth, TX · ~34 workers · 3 years of OSHA Injury Tracking Application data.
- C
- Average Safety Record
- 0.0
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Plant X-128 runs at 0% of its industry's injury rate - about level with the typical Fossil Fuel Electric Generation workplace, earning a grade C.
Plant X-128: 0.0 TCR = 0% of Fossil Fuel Electric Generation BLS 1.2 · 3y Form 300A (see methodology below)
Plant X-128 safety composite
Plant X-128 scores strongest on total case rate (tcr) (safer than 100% of same-industry peers) and weakest on fatalities (safer than 51%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
78/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- A 0 per 100 workers
Safer than 100% of industry peers
- DART rate
- C 0 per 100 workers
Safer than 71% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Plant X-128 held a steady TCR band
Plant X-128's TCR held near 0.0 from 0.0 in 2021 to 0.0 in 2023. Peak filing year was 2021 at 0.0 TCR.
2021=0.0 · 2022=0.0 · 2023=0.0
OSHA ITA Form 300A scorecard
Establishment book 221112 · Earth, TX AT/BELOW-IND · SMALL
Grade C · TCR 0.0 · 0% of ind
- DART 0.0 DART
- RANK #0/86
- PHOTO 00525 NORTH TEMPLE O…
- BOOK 3y book
- INJ 0 inj
- SIZE ~34 FTE
Nearest TCR peer: 00525 NORTH TEMPLE OFFICE (0.0 TCR gap)
Read with this employer → · Industry book → · Texas employers → · Look up another →
Plant X-128 in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- Calpine Energy 0.1
Calpine Energy Solutions
0.1 TCR
- Roxboro Fossil 0.1
Roxboro Fossil and CT Plants
0.1 TCR
- Arena Building 0.1
Arena Building
0.1 TCR
- This site 0
Plant X-128
0 TCR
- 00525 NORTH TE 0
00525 NORTH TEMPLE OFFICE
0 TCR
What this shows Plant X-128 averages 0.0 TCR (0% of the Fossil Fuel Electric Generation BLS benchmark).
Plant X-128 TCR series: 2021=0 · 2022=0 · 2023=0 · BLS 1.2
Where Plant X-128 falls in its industry
846 Fossil Fuel Electric Generatio establishmentsSafer than 100% of graded establishments in this industry, whose median TCR is 1.5.
Narrower to Texas alone (the establishments it most directly competes with for workers and contracts): ranked #0 safest of 86 Fossil Fuel Electric Generatio employers in Texas.
Plant X-128 has fewer employees than the Fossil Fuel Electric Generation median and a lower injury rate than the industry's median TCR of 1.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2023 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2022 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2021 | 0.0 | 0.0 | 0 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221112 · TX · Earth
846 Fossil Fuel Electric Generation employers nationwide with a credible TCR · 38,394 rated employers in Texas with headcount on file · 4 employers in Earth, TX · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | 00525 NORTH TEMPLE OFFICE | 0.0 TCR |
| NAICS-TCR | Calpine Energy Solutions | 0.1 TCR |
| NAICS-TCR | Roxboro Fossil and CT Plants | 0.1 TCR |
| NAICS-TCR | Arena Building | 0.1 TCR |
| STATE-SIZE | SOUTHWEST FEED YARD | 34 FTE |
| STATE-SIZE | Bartlett Cattle Company, L.P. - Tulia | 34 FTE |
| STATE-SIZE | Pineywoods | 34 FTE |
| STATE-SIZE | TXP | 34 FTE |
| CITY-NEAR | Tolk/Plant X Station | 132 FTE |
| CITY-NEAR | Tolk Station-124 | 74 FTE |
| CITY-NEAR | Savage Services - Tolk | 24 FTE |
| NAT-TCR | California Department of Transportation Facility 128 | 0.0 TCR |
| NAT-TCR | Integration Appliance Inc. | 0.0 TCR |
| NAT-TCR | Raleigh Managed Services | 0.0 TCR |
| NAT-TCR | Keller Warehouse | 0.0 TCR |
| NAT-SIZE | Bayfront Steam Plant-5D | 34 FTE |
| NAT-SIZE | Carlsbad Service Center-188 | 34 FTE |
| NAT-SIZE | Eagle Excavation Atlantic | 34 FTE |
| NAT-SIZE | Stone Installation and Maintenance, Inc. | 34 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.