Compressor, metering and pumping station, gas and oil pipeline, construction · Wisconsin
Precision Pipeline, LLC
Eau Claire, WI · ~3,757 workers · 8 years of OSHA Injury Tracking Application data.
- A
- Excellent Safety Record
- 0.8
- Avg TCR
- 2.8
- Industry avg
- 2
- Fatalities
The verdict
Precision Pipeline, LLC runs at 29% of its industry's injury rate - far safer than the typical Compressor, metering and pumping station, gas and oil pipeline, construction workplace, earning a grade A.
Precision Pipeline, LLC: 0.8 TCR = 29% of Compressor, metering and pumping station, gas and oil pipeline, construction BLS 2.8 · 8y Form 300A (see methodology below)
Precision Pipeline, LLC safety composite
Precision Pipeline, LLC scores strongest on total case rate (tcr) (safer than 46% of same-industry peers) and weakest on fatalities (safer than 0%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
29/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- D 0.82 per 100 workers
Safer than 46% of industry peers
- DART rate
- F 0.36 per 100 workers
Safer than 29% of industry peers
- Fatalities
- F 2
Safer than 0% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
TCR Δ
−0.6
2016→2024
Precision Pipeline, LLC injury rate improved
Precision Pipeline, LLC's TCR fell 0.6 from 1.1 in 2016 to 0.5 in 2024. Peak filing year was 2020 at 1.2 TCR. In 2024, DART was 0.44× this establishment's average TCR (severity share of cases).
2016=1.1 · 2018=1.0 · 2019=0.8 · 2020=1.2 · 2021=0.6 · 2022=0.8 · 2023=0.5 · 2024=0.5
OSHA ITA Form 300A scorecard
Establishment book 237120 · Eau Claire, WI AT/BELOW-IND · LARGE
Grade A · TCR 0.8 · 29% of ind
- DART 0.4 DART
- RANK #6/17
- PHOTO ODIN EPC, INC.
- BOOK 8y book
- INJ 200 inj
- SIZE ~3,757 FTE
Nearest TCR peer: ODIN EPC, INC. (0.0 TCR gap)
Read with this employer → · Industry book → · Wisconsin employers → · Look up another →
Precision Pipeline, LLC in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Precision Pipeline, LLC
0.8 TCR
- ODIN EPC, INC.
ODIN EPC, INC.
0.8 TCR
- EXCEL Maintena
EXCEL Maintenance @ Westlake Plaquemine
0.8 TCR
- U7099 - SPR LE
U7099 - SPR LE-2 Big Hill
0.8 TCR
- Gateway Pipeli
Gateway Pipeline LLC
0.8 TCR
What this shows Precision Pipeline, LLC averages 0.8 TCR (29% of the Compressor, metering and pumping station, gas and oil pipeline, construction BLS benchmark).
Precision Pipeline, LLC TCR series: 2016=1.1 · 2018=1 · 2019=0.8 · 2020=1.2 · 2021=0.6 · 2022=0.8 · 2023=0.5 · 2024=0.5 · BLS 2.8
Where Precision Pipeline, LLC falls in its industry
809 Compressor, metering and pumpi establishmentsSafer than 46% of graded establishments in this industry, whose median TCR is 0.7.
Narrower to Wisconsin alone (the establishments it most directly competes with for workers and contracts): ranked #6 safest of 17 Compressor, metering and pumpi employers in Wisconsin.
Precision Pipeline, LLC has more employees than the Compressor, metering and pumping station median and a higher injury rate than the industry's median TCR of 0.7. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 0.5 | 0.4 | 9 | 0 | 0 |
| 2023 | 0.5 | 0.4 | 12 | 0 | 0 |
| 2022 | 0.8 | 0.5 | 5 | 0 | 0 |
| 2021 | 0.6 | 0.4 | 25 | 0 | 0 |
| 2020 | 1.2 | 0.6 | 17 | 0 | 1 |
| 2019 | 0.8 | 0.4 | 29 | 0 | 0 |
| 2018 | 1.0 | 0.8 | 63 | 0 | 0 |
| 2016 | 1.1 | 0.4 | 40 | 0 | 1 |
OSHA ITA peer cross-reference
Establishment peer ledger
237120 · WI · Eau Claire
809 Compressor, metering and pumping station, gas and oil pipeline, construction employers nationwide with a credible TCR · 12,834 rated employers in Wisconsin with headcount on file · 271 employers in Eau Claire, WI · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | ODIN EPC, INC. | 0.8 TCR |
| NAICS-TCR | EXCEL Maintenance @ Westlake Plaquemine | 0.8 TCR |
| NAICS-TCR | U7099 - SPR LE-2 Big Hill | 0.8 TCR |
| NAICS-TCR | Gateway Pipeline LLC | 0.8 TCR |
| STATE-SIZE | Mercury Marine FdL Campus | 3,778 FTE |
| STATE-SIZE | Mercury Marine Fond du Lac | 3,735 FTE |
| STATE-SIZE | Gundersen Lutheran Medical Center | 3,712 FTE |
| STATE-SIZE | WI005 - WI-Green Bay-CSBC | 3,595 FTE |
| CITY-NEAR | Mayo Clinic Health System-Eau Claire Hospital (Whipple) | 3,141 FTE |
| CITY-NEAR | WWD Sacred Heart Hospital | 1,370 FTE |
| CITY-NEAR | STORE DIVISION ADMIN - 3019 | 900 FTE |
| CITY-NEAR | Eau Claire | 614 FTE |
| NAT-TCR | Partners For Quality | 0.8 TCR |
| NAT-TCR | FL - Disney NGE | 0.8 TCR |
| NAT-TCR | Mechanicsburg - 260 Salem Church Road | 0.8 TCR |
| NAT-TCR | The Pride Services Co Inc | 0.8 TCR |
| NAT-SIZE | San Manuel Casino | 3,759 FTE |
| NAT-SIZE | Michigan Operations - Midland | 3,755 FTE |
| NAT-SIZE | UPMC Children's Hospital of Pittsburgh | 3,764 FTE |
| NAT-SIZE | Continental Tire Mt. Vernon | 3,766 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.