Electric power generation, hydroelectric · Washington
PSE, EOB - Everett Operating Base
Everett, WA · ~29 workers · 2 years of OSHA Injury Tracking Application data.
- D
- Poor Safety Record
- 1.8
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
PSE, EOB - Everett Operating Base runs at 149% of its industry's injury rate - more dangerous than the typical Electric power generation, hydroelectric workplace, earning a grade D.
PSE, EOB - Everett Operating Base: 1.8 TCR = 149% of Electric power generation, hydroelectric BLS 1.2 · 2y Form 300A (see methodology below)
PSE, EOB - Everett Operating Base safety composite
PSE, EOB - Everett Operating Base scores strongest on dart rate (safer than 76% of same-industry peers) and weakest on fatalities (safer than 52%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
66/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- C 1.79 per 100 workers
Safer than 67% of industry peers
- DART rate
- B 0 per 100 workers
Safer than 76% of industry peers
- Fatalities
- D 0
Safer than 52% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Rising injury rate
PSE, EOB - Everett Operating Base: 0.0 → 3.6 TCR
Peak year 2023 @ 3.6 TCR · DART/TCR 0× in 2023
PSE, EOB - Everett Operating Base's TCR rose 3.6 from 0.0 in 2020 to 3.6 in 2023. In 2023, DART was 0× this establishment's average TCR (severity share of cases).
OSHA ITA Form 300A scorecard
Establishment book 221111 · Everett, WA ABOVE-IND · SMALL
Grade D · TCR 1.8 · 149% of ind
- DART 0.0 DART
- RANK #8/25
- PHOTO 84A - Keokuk Energy …
- BOOK 2y book
- INJ 0 inj
- SIZE ~29 FTE
Nearest TCR peer: 84A - Keokuk Energy Ctr Gen and Bud (0.0 TCR gap)
Read with this employer → · Industry book → · Washington employers → · Look up another →
PSE, EOB - Everett Operating Base in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- Monroe Bridge
Monroe Bridge Office
1.9 TCR
- This site
PSE, EOB - Everett Operating Base
1.8 TCR
- 84A - Keokuk E
84A - Keokuk Energy Ctr Gen and Bud
1.8 TCR
- NYSEG Plattsbu
NYSEG Plattsburgh
1.8 TCR
- Wissota Hydro
Wissota Hydro Plant
1.7 TCR
What this shows PSE, EOB - Everett Operating Base averages 1.8 TCR (149% of the Electric power generation, hydroelectric BLS benchmark).
PSE, EOB - Everett Operating Base TCR series: 2020=0 · 2023=3.6 · BLS 1.2
Where PSE, EOB - Everett Operating Base falls in its industry
129 Electric power generation, hyd establishmentsSafer than 67% of graded establishments in this industry, whose median TCR is 3.3.
Narrower to Washington alone (the establishments it most directly competes with for workers and contracts): ranked #8 safest of 25 Electric power generation, hyd employers in Washington.
PSE, EOB - Everett Operating Base has fewer employees than the Electric power generation, hydroelectric median and a lower injury rate than the industry's median TCR of 3.3. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2023 | 3.6 | 0.0 | 0 | 1 | 0 |
| 2020 | 0.0 | 0.0 | 0 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221111 · WA · Everett
129 Electric power generation, hydroelectric employers nationwide with a credible TCR · 10,147 rated employers in Washington with headcount on file · 271 employers in Everett, WA · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | 84A - Keokuk Energy Ctr Gen and Bud | 1.8 TCR |
| NAICS-TCR | NYSEG Plattsburgh | 1.8 TCR |
| NAICS-TCR | Wissota Hydro Plant | 1.7 TCR |
| NAICS-TCR | Monroe Bridge Office | 1.9 TCR |
| STATE-SIZE | Griffin Creek Farm | 29 FTE |
| STATE-SIZE | DG ORCHARDS LLC | 29 FTE |
| STATE-SIZE | Frenchman Hills | 29 FTE |
| STATE-SIZE | Consolidated Fruit, LLC | 29 FTE |
| CITY-NEAR | WA004 | 31,034 FTE |
| CITY-NEAR | WA660 EVERETT MEDICAL CTR COLBY-EVERETT HR | 3,160 FTE |
| CITY-NEAR | Snohomish County Government | 3,004 FTE |
| CITY-NEAR | Snohomish County | 2,851 FTE |
| NAT-TCR | Baylor Ambulatory Endoscopy Center | 1.8 TCR |
| NAT-TCR | ULTRAMET | 1.8 TCR |
| NAT-TCR | Big Lots Store #1743 Jacksonville Beach, FL | 1.8 TCR |
| NAT-TCR | Big Lots Store #827 MEMPHIS, TN | 1.8 TCR |
| NAT-SIZE | Best Western Horizon Inn | 29 FTE |
| NAT-SIZE | Valencia Town Center | 29 FTE |
| NAT-SIZE | Gregory Poole Lift Systems- Greenville | 29 FTE |
| NAT-SIZE | Senior Living Suites Parkside | 29 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.