Electric power generation, fossil fuel (e.g., coal, oil, gas) · Washington
River Road Generation Plant
Vancouver, WA · ~435 workers · 2 years of OSHA Injury Tracking Application data.
- C
- Average Safety Record
- 0.0
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
River Road Generation Plant runs at 0% of its industry's injury rate - about level with the typical Electric power generation, fossil fuel (e.g., coal, oil, gas) workplace, earning a grade C.
River Road Generation Plant: 0.0 TCR = 0% of Electric power generation, fossil fuel (e.g., coal, oil, gas) BLS 1.2 · 2y Form 300A (see methodology below)
River Road Generation Plant safety composite
River Road Generation Plant scores strongest on total case rate (tcr) (safer than 100% of same-industry peers) and weakest on fatalities (safer than 51%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
78/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- A 0 per 100 workers
Safer than 100% of industry peers
- DART rate
- C 0 per 100 workers
Safer than 71% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
River Road Generation Plant held a steady TCR band
River Road Generation Plant's TCR held near 0.0 from 0.0 in 2017 to 0.0 in 2018. Peak filing year was 2017 at 0.0 TCR.
2017=0.0 · 2018=0.0
OSHA ITA Form 300A scorecard
Establishment book 221112 · Vancouver, WA AT/BELOW-IND · MID
Grade C · TCR 0.0 · 0% of ind
- DART 0.0 DART
- RANK #0/14
- PHOTO 00525 NORTH TEMPLE O…
- BOOK 2y book
- INJ 0 inj
- SIZE ~435 FTE
Nearest TCR peer: 00525 NORTH TEMPLE OFFICE (0.0 TCR gap)
Read with this employer → · Industry book → · Washington employers → · Look up another →
River Road Generation Plant in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- Calpine Energy 0.1
Calpine Energy Solutions
0.1 TCR
- Roxboro Fossil 0.1
Roxboro Fossil and CT Plants
0.1 TCR
- Arena Building 0.1
Arena Building
0.1 TCR
- This site 0
River Road Generation Plant
0 TCR
- 00525 NORTH TE 0
00525 NORTH TEMPLE OFFICE
0 TCR
What this shows River Road Generation Plant averages 0.0 TCR (0% of the Electric power generation, fossil fuel (e.g., coal, oil, gas) BLS benchmark).
River Road Generation Plant TCR series: 2017=0 · 2018=0 · BLS 1.2
Where River Road Generation Plant falls in its industry
846 Electric power generation, fos establishmentsSafer than 100% of graded establishments in this industry, whose median TCR is 1.5.
Narrower to Washington alone (the establishments it most directly competes with for workers and contracts): ranked #0 safest of 14 Electric power generation, fos employers in Washington.
River Road Generation Plant has more employees than the Electric power generation, fossil fuel ( median and a lower injury rate than the industry's median TCR of 1.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2018 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2017 | 0.0 | 0.0 | 0 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221112 · WA · Vancouver
846 Electric power generation, fossil fuel (e.g., coal, oil, gas) employers nationwide with a credible TCR · 10,147 rated employers in Washington with headcount on file · 490 employers in Vancouver, WA · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | 00525 NORTH TEMPLE OFFICE | 0.0 TCR |
| NAICS-TCR | Calpine Energy Solutions | 0.1 TCR |
| NAICS-TCR | Roxboro Fossil and CT Plants | 0.1 TCR |
| NAICS-TCR | Arena Building | 0.1 TCR |
| STATE-SIZE | Energy Services | 435 FTE |
| STATE-SIZE | Electric Center | 435 FTE |
| STATE-SIZE | McLendon's Hardware | 435 FTE |
| STATE-SIZE | 0106 - AURORA VILLAGE WA WHSE | 435 FTE |
| CITY-NEAR | Hawthorn Senior Living | 3,847 FTE |
| CITY-NEAR | Southwest Medical Center Main Campus | 3,464 FTE |
| CITY-NEAR | 6994-PL600 | 1,970 FTE |
| CITY-NEAR | 600 | 1,922 FTE |
| NAT-TCR | Aviation Other : Virtual Employee Roll-Up Site | 0.0 TCR |
| NAT-TCR | AZ-01 | 0.0 TCR |
| NAT-TCR | CT-02 | 0.0 TCR |
| NAT-TCR | NJ-05 | 0.0 TCR |
| NAT-SIZE | Cox Automotive - Manheim Dallas | 435 FTE |
| NAT-SIZE | Colony Capital Advisors, LLC | 435 FTE |
| NAT-SIZE | Augustana Mpls Care Center 012 | 435 FTE |
| NAT-SIZE | Chico Locations (Headquarters) | 435 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.