Asphalt paving (i.e., highway, road, street, public sidewalk) · Oregon
Rocky Mountain Construction, LLC
Klamath Falls, OR · ~95 workers · 5 years of OSHA Injury Tracking Application data.
- C
- Average Safety Record
- 2.9
- Avg TCR
- 2.8
- Industry avg
- 1
- Fatality
The verdict
Rocky Mountain Construction, LLC runs at 105% of its industry's injury rate - about level with the typical Asphalt paving (i.e., highway, road, street, public sidewalk) workplace, earning a grade C.
Rocky Mountain Construction, LLC: 2.9 TCR = 105% of Asphalt paving (i.e., highway, road, street, public sidewalk) BLS 2.8 · 5y Form 300A (see methodology below)
Rocky Mountain Construction, LLC safety composite
Rocky Mountain Construction, LLC scores strongest on dart rate (safer than 52% of same-industry peers) and weakest on fatalities (safer than 3%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
39/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- D 2.94 per 100 workers
Safer than 51% of industry peers
- DART rate
- D 0.97 per 100 workers
Safer than 52% of industry peers
- Fatalities
- F 1
Safer than 3% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
TCR Δ
−3.6
2019→2024
Rocky Mountain Construction, LLC injury rate improved
Rocky Mountain Construction, LLC's TCR fell 3.6 from 5.5 in 2019 to 1.9 in 2024. Peak filing year was 2019 at 5.5 TCR. In 2024, DART was 0.33× this establishment's average TCR (severity share of cases).
2019=5.5 · 2021=2.3 · 2022=2.0 · 2023=2.9 · 2024=1.9
OSHA ITA Form 300A scorecard
Establishment book 237310 · Klamath Falls, OR ABOVE-IND · SMALL
Grade C · TCR 2.9 · 105% of ind
- DART 1.0 DART
- RANK #44/135
- PHOTO Hank's Excavating & …
- BOOK 5y book
- INJ 12 inj
- SIZE ~95 FTE
Nearest TCR peer: Hank's Excavating & Landscaping, Inc. (0.0 TCR gap)
Read with this employer → · Industry book → · Oregon employers → · Look up another →
Rocky Mountain Construction, LLC in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Rocky Mountain Construction, LLC
2.9 TCR
- Hank's Excavat
Hank's Excavating & Landscaping, Inc.
2.9 TCR
- Suit-Kote Oris
Suit-Kote Oriskany
2.9 TCR
- 2501 - Shrevep
2501 - Shreveport, LA
2.9 TCR
- Northeast Asph
Northeast Asphalt, Inc. - Green Bay
2.9 TCR
What this shows Rocky Mountain Construction, LLC averages 2.9 TCR (105% of the Asphalt paving (i.e., highway, road, street, public sidewalk) BLS benchmark).
Rocky Mountain Construction, LLC TCR series: 2019=5.5 · 2021=2.3 · 2022=2 · 2023=2.9 · 2024=1.9 · BLS 2.8
Where Rocky Mountain Construction, LLC falls in its industry
4,078 Asphalt paving (i.e., highway, establishmentsSafer than 51% of graded establishments in this industry, whose median TCR is 3.0.
Narrower to Oregon alone (the establishments it most directly competes with for workers and contracts): ranked #44 safest of 135 Asphalt paving (i.e., highway, employers in Oregon.
Rocky Mountain Construction, LLC has more employees than the Asphalt paving (i.e., highway, road, str median and a lower injury rate than the industry's median TCR of 3.0. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 1.9 | 1.0 | 1 | 1 | 0 |
| 2023 | 2.9 | 2.9 | 3 | 0 | 0 |
| 2022 | 2.0 | 2.0 | 2 | 0 | 0 |
| 2021 | 2.3 | 2.3 | 2 | 0 | 0 |
| 2019 | 5.5 | 4.4 | 4 | 1 | 1 |
OSHA ITA peer cross-reference
Establishment peer ledger
237310 · OR · Klamath Falls
4,078 Asphalt paving (i.e., highway, road, street, public sidewalk) employers nationwide with a credible TCR · 8,031 rated employers in Oregon with headcount on file · 112 employers in Klamath Falls, OR · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Hank's Excavating & Landscaping, Inc. | 2.9 TCR |
| NAICS-TCR | Suit-Kote Oriskany | 2.9 TCR |
| NAICS-TCR | 2501 - Shreveport, LA | 2.9 TCR |
| NAICS-TCR | Northeast Asphalt, Inc. - Green Bay | 2.9 TCR |
| STATE-SIZE | Main Farm | 95 FTE |
| STATE-SIZE | Columbia Phitotechnology (POWDERPURE) | 95 FTE |
| STATE-SIZE | 6400-SWY-0045-0045-08111 | 95 FTE |
| STATE-SIZE | Sawtooth | 95 FTE |
| CITY-NEAR | Sky Lakes Medical Center, Inc. | 1,480 FTE |
| CITY-NEAR | 0007 - US Products Admin | 631 FTE |
| CITY-NEAR | ED Staub & Sons | 582 FTE |
| CITY-NEAR | Ed Staub & Sons Petroleum Inc. | 548 FTE |
| NAT-TCR | 260 - Myrtle Beach | 2.9 TCR |
| NAT-TCR | M7677 Tower Cafe | 2.9 TCR |
| NAT-TCR | MSD Building Corp. | 2.9 TCR |
| NAT-TCR | Bethesda Terrace | 2.9 TCR |
| NAT-SIZE | Minnesota Valley Electric Cooperative | 95 FTE |
| NAT-SIZE | Harlen's Drywall Co Inc | 95 FTE |
| NAT-SIZE | Zima Corporation | 95 FTE |
| NAT-SIZE | Lakewood_IFS | 95 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.