Electric Power Distribution · Michigan
Shelbey Service Cemter
Shelby Twsp, MI · ~107 workers · 8 years of OSHA Injury Tracking Application data.
- A
- Excellent Safety Record
- 0.6
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Shelbey Service Cemter runs at 47% of its industry's injury rate - far safer than the typical Electric Power Distribution workplace, earning a grade A.
Shelbey Service Cemter: 0.6 TCR = 47% of Electric Power Distribution BLS 1.2 · 8y Form 300A (see methodology below)
Shelbey Service Cemter safety composite
Shelbey Service Cemter scores strongest on total case rate (tcr) (safer than 92% of same-industry peers) and weakest on fatalities (safer than 51%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
77/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- A 0.56 per 100 workers
Safer than 92% of industry peers
- DART rate
- B 0 per 100 workers
Safer than 79% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
TCR Δ
−0.8
2016→2023
Shelbey Service Cemter injury rate improved
Shelbey Service Cemter's TCR fell 0.8 from 0.8 in 2016 to 0.0 in 2023. Peak filing year was 2022 at 1.5 TCR. In 2023, DART was 0× this establishment's average TCR (severity share of cases).
2016=0.8 · 2017=0.0 · 2018=0.7 · 2019=1.4 · 2020=0.0 · 2021=0.0 · 2022=1.5 · 2023=0.0
OSHA ITA Form 300A scorecard
Establishment book 221122 · Shelby Twsp, MI AT/BELOW-IND · MID
Grade A · TCR 0.6 · 47% of ind
- DART 0.0 DART
- RANK #5/63
- PHOTO CenterPoint Energy -…
- BOOK 8y book
- INJ 6 inj
- SIZE ~107 FTE
Nearest TCR peer: CenterPoint Energy - Ft Bend (0.0 TCR gap)
Read with this employer → · Industry book → · Michigan employers → · Look up another →
Shelbey Service Cemter in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Shelbey Service Cemter
0.6 TCR
- CenterPoint En
CenterPoint Energy - Ft Bend
0.6 TCR
- Whitewater Val
Whitewater Valley REMC
0.6 TCR
- DALLAS (NE)
DALLAS (NE)
0.6 TCR
- Fayetteville O
Fayetteville Operations
0.6 TCR
What this shows Shelbey Service Cemter averages 0.6 TCR (47% of the Electric Power Distribution BLS benchmark).
Shelbey Service Cemter TCR series: 2016=0.8 · 2017=0 · 2018=0.7 · 2019=1.4 · 2020=0 · 2021=0 · 2022=1.5 · 2023=0 · BLS 1.2
Where Shelbey Service Cemter falls in its industry
2,958 Electric Power Distribution establishmentsSafer than 92% of graded establishments in this industry, whose median TCR is 2.5.
Narrower to Michigan alone (the establishments it most directly competes with for workers and contracts): ranked #5 safest of 63 Electric Power Distribution employers in Michigan.
Shelbey Service Cemter has more employees than the Electric Power Distribution median and a lower injury rate than the industry's median TCR of 2.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2023 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2022 | 1.5 | 0.8 | 2 | 0 | 0 |
| 2021 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2020 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2019 | 1.4 | 0.7 | 2 | 0 | 0 |
| 2018 | 0.7 | 0.0 | 1 | 0 | 0 |
| 2017 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2016 | 0.8 | 0.0 | 1 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221122 · MI · Shelby Twsp
2,958 Electric Power Distribution employers nationwide with a credible TCR · 16,393 rated employers in Michigan with headcount on file · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | CenterPoint Energy - Ft Bend | 0.6 TCR |
| NAICS-TCR | Whitewater Valley REMC | 0.6 TCR |
| NAICS-TCR | DALLAS (NE) | 0.6 TCR |
| NAICS-TCR | Fayetteville Operations | 0.6 TCR |
| STATE-SIZE | CB Asphalt Maintenance LLC | 107 FTE |
| STATE-SIZE | Bloom Roofing Systems Inc | 107 FTE |
| STATE-SIZE | Reliable Relamping | 107 FTE |
| STATE-SIZE | MPS Allegan | 107 FTE |
| NAT-TCR | 3M DeKalb - DSI | 0.6 TCR |
| NAT-TCR | Charps All | 0.6 TCR |
| NAT-TCR | Southeast Logistics Service Center | 0.6 TCR |
| NAT-TCR | Philips NAM Field Sales & Service | 0.6 TCR |
| NAT-SIZE | Lebanon #227 | 107 FTE |
| NAT-SIZE | HydraForce, Inc Plant 2 | 107 FTE |
| NAT-SIZE | SXP Tunica | 107 FTE |
| NAT-SIZE | Cox Fire Protection, Inc. | 107 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.