Office building construction · Kansas
SVH HR Administration Building
Topeka, KS · ~46 workers · 3 years of OSHA Injury Tracking Application data.
- B
- Good Safety Record
- 2.2
- Avg TCR
- 2.9
- Industry avg
- 0
- Fatalities
The verdict
SVH HR Administration Building runs at 76% of its industry's injury rate - safer than the typical Office building construction workplace, earning a grade B.
SVH HR Administration Building: 2.2 TCR = 76% of Office building construction BLS 2.9 · 3y Form 300A (see methodology below)
SVH HR Administration Building safety composite
SVH HR Administration Building scores strongest on dart rate (safer than 73% of same-industry peers) and weakest on fatalities (safer than 51%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
59/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- D 2.19 per 100 workers
Safer than 52% of industry peers
- DART rate
- C 0 per 100 workers
Safer than 73% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Rising injury rate
SVH HR Administration Building: 0.0 → 5.0 TCR
Peak year 2024 @ 5.0 TCR · DART/TCR 0× in 2024
SVH HR Administration Building's TCR rose 5.0 from 0.0 in 2021 to 5.0 in 2024. In 2024, DART was 0× this establishment's average TCR (severity share of cases).
OSHA ITA Form 300A scorecard
Establishment book 236220 · Topeka, KS AT/BELOW-IND · SMALL
Grade B · TCR 2.2 · 76% of ind
- DART 0.0 DART
- RANK #24/63
- PHOTO 1007 - BELFOR Anahei…
- BOOK 3y book
- INJ 2 inj
- SIZE ~46 FTE
Nearest TCR peer: 1007 - BELFOR Anaheim CA (0.0 TCR gap)
Read with this employer → · Industry book → · Kansas employers → · Look up another →
SVH HR Administration Building in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
SVH HR Administration Building
2.2 TCR
- 1007 - BELFOR
1007 - BELFOR Anaheim CA
2.2 TCR
- Engineered Str
Engineered Structures, Inc. Washington
2.2 TCR
- Hagerman, Inc.
Hagerman, Inc.
2.2 TCR
- Lucas Museum o
Lucas Museum of Narrative Art
2.2 TCR
What this shows SVH HR Administration Building averages 2.2 TCR (76% of the Office building construction BLS benchmark).
SVH HR Administration Building TCR series: 2021=0 · 2023=1.5 · 2024=5 · BLS 2.9
Where SVH HR Administration Building falls in its industry
4,692 Office building construction establishmentsSafer than 52% of graded establishments in this industry, whose median TCR is 2.3.
Narrower to Kansas alone (the establishments it most directly competes with for workers and contracts): ranked #24 safest of 63 Office building construction employers in Kansas.
SVH HR Administration Building has fewer employees than the Office building construction median and a lower injury rate than the industry's median TCR of 2.3. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 5.0 | 0.0 | 1 | 0 | 0 |
| 2023 | 1.5 | 1.5 | 1 | 0 | 0 |
| 2021 | 0.0 | 0.0 | 0 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
236220 · KS · Topeka
4,692 Office building construction employers nationwide with a credible TCR · 5,228 rated employers in Kansas with headcount on file · 319 employers in Topeka, KS · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | 1007 - BELFOR Anaheim CA | 2.2 TCR |
| NAICS-TCR | Engineered Structures, Inc. Washington | 2.2 TCR |
| NAICS-TCR | Hagerman, Inc. | 2.2 TCR |
| NAICS-TCR | Lucas Museum of Narrative Art | 2.2 TCR |
| STATE-SIZE | WCNOC | 46 FTE |
| STATE-SIZE | Straub Construction Co Inc | 46 FTE |
| STATE-SIZE | Snodgrass & Sons Construction Co, Inc. | 46 FTE |
| STATE-SIZE | Winfield #007 | 46 FTE |
| CITY-NEAR | Stormont Vail Health - Hospital | 2,589 FTE |
| CITY-NEAR | Goodyear Tire Rubber Company | 1,563 FTE |
| CITY-NEAR | Goodyear Topeka | 1,499 FTE |
| CITY-NEAR | The University of Kansas Health System St. Francis Campus | 1,417 FTE |
| NAT-TCR | Sweetwater Svc | 2.2 TCR |
| NAT-TCR | M. Holland & Sons Construction, Inc. | 2.2 TCR |
| NAT-TCR | Grand Cane | 2.2 TCR |
| NAT-TCR | Trans Cable International | 2.2 TCR |
| NAT-SIZE | Casa Grande AZ Yard | 46 FTE |
| NAT-SIZE | Marshall, MO-PS | 46 FTE |
| NAT-SIZE | San Antonio packing Co. | 46 FTE |
| NAT-SIZE | Huachuca City | 46 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.