Pavement, highway, road, street, bridge or airport runway, construction · Colorado
Telluride Construction
Telluride, CO · ~47 workers · 8 years of OSHA Injury Tracking Application data.
- A
- Excellent Safety Record
- 1.3
- Avg TCR
- 2.8
- Industry avg
- 0
- Fatalities
The verdict
Telluride Construction runs at 46% of its industry's injury rate - far safer than the typical Pavement, highway, road, street, bridge or airport runway, construction workplace, earning a grade A.
Telluride Construction: 1.3 TCR = 46% of Pavement, highway, road, street, bridge or airport runway, construction BLS 2.8 · 8y Form 300A (see methodology below)
Telluride Construction safety composite
Telluride Construction scores strongest on dart rate (safer than 81% of same-industry peers) and weakest on fatalities (safer than 53%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
73/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- B 1.3 per 100 workers
Safer than 78% of industry peers
- DART rate
- B 0 per 100 workers
Safer than 81% of industry peers
- Fatalities
- D 0
Safer than 53% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
TCR Δ
−2.8
2016→2023
Telluride Construction injury rate improved
Telluride Construction's TCR fell 2.8 from 2.8 in 2016 to 0.0 in 2023. Peak filing year was 2016 at 2.8 TCR. In 2023, DART was 0× this establishment's average TCR (severity share of cases).
2016=2.8 · 2017=2.7 · 2018=0.0 · 2019=2.1 · 2020=2.8 · 2021=0.0 · 2022=0.0 · 2023=0.0
OSHA ITA Form 300A scorecard
Establishment book 237310 · Telluride, CO AT/BELOW-IND · SMALL
Grade A · TCR 1.3 · 46% of ind
- DART 0.0 DART
- RANK #24/85
- PHOTO Smith-Rowe, LLC
- BOOK 8y book
- INJ 4 inj
- SIZE ~47 FTE
Nearest TCR peer: Smith-Rowe, LLC (0.0 TCR gap)
Read with this employer → · Industry book → · Colorado employers → · Look up another →
Telluride Construction in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Telluride Construction
1.3 TCR
- Smith-Rowe, LL
Smith-Rowe, LLC
1.3 TCR
- NJTA T100.184
NJTA T100.184 Bridge Deck Reconstruction & Misc Structural Improvements
1.3 TCR
- EIA - BLUE GRA
EIA - BLUE GRASS
1.3 TCR
- Teichert Const
Teichert Construction Pleasanton
1.3 TCR
What this shows Telluride Construction averages 1.3 TCR (46% of the Pavement, highway, road, street, bridge or airport runway, construction BLS benchmark).
Telluride Construction TCR series: 2016=2.8 · 2017=2.7 · 2018=0 · 2019=2.1 · 2020=2.8 · 2021=0 · 2022=0 · 2023=0 · BLS 2.8
Where Telluride Construction falls in its industry
4,078 Pavement, highway, road, stree establishmentsSafer than 78% of graded establishments in this industry, whose median TCR is 3.0.
Narrower to Colorado alone (the establishments it most directly competes with for workers and contracts): ranked #24 safest of 85 Pavement, highway, road, stree employers in Colorado.
Telluride Construction has fewer employees than the Pavement, highway, road, street, bridge median and a lower injury rate than the industry's median TCR of 3.0. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2023 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2022 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2021 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2020 | 2.8 | 2.8 | 1 | 0 | 0 |
| 2019 | 2.1 | 2.1 | 1 | 0 | 0 |
| 2018 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2017 | 2.7 | 0.0 | 1 | 0 | 0 |
| 2016 | 2.8 | 0.0 | 1 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
237310 · CO · Telluride
4,078 Pavement, highway, road, street, bridge or airport runway, construction employers nationwide with a credible TCR · 9,007 rated employers in Colorado with headcount on file · 6 employers in Telluride, CO · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Smith-Rowe, LLC | 1.3 TCR |
| NAICS-TCR | NJTA T100.184 Bridge Deck Reconstruction & Misc Structural Improvements | 1.3 TCR |
| NAICS-TCR | EIA - BLUE GRASS | 1.3 TCR |
| NAICS-TCR | Teichert Construction Pleasanton | 1.3 TCR |
| STATE-SIZE | ACA - Avery Shop/Yard | 47 FTE |
| STATE-SIZE | Fort St Vrain Station-285 | 47 FTE |
| STATE-SIZE | WLM-Limon Wind Plant | 47 FTE |
| STATE-SIZE | Colorado Division Office | 47 FTE |
| CITY-NEAR | 102 GOLDEN PEAK BASE AREA | 331 FTE |
| CITY-NEAR | Telluride Nivalis | 49 FTE |
| CITY-NEAR | Telluride Terra | 49 FTE |
| CITY-NEAR | Fortenberry & Ricks, LLC | 40 FTE |
| NAT-TCR | Wholesale Food Outlet 1021 | 1.3 TCR |
| NAT-TCR | NY State Solar HQ | 1.3 TCR |
| NAT-TCR | BrandSafway Solutions, LLC - San Antonio Branch | 1.3 TCR |
| NAT-TCR | Arden Courts of Whippany | 1.3 TCR |
| NAT-SIZE | Dept. of Military & Veterans Affairs (9) | 47 FTE |
| NAT-SIZE | SS-Harvest South | 47 FTE |
| NAT-SIZE | Riverside Presbyterian House Inc. | 47 FTE |
| NAT-SIZE | Bridges Bay Resort | 47 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.