Electric power generation, fossil fuel (e.g., coal, oil, gas) · Texas
Tenaska Frontier Generating Station
Shiro, TX · ~28 workers · 9 years of OSHA Injury Tracking Application data.
- A
- Excellent Safety Record
- 0.4
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Tenaska Frontier Generating Station runs at 32% of its industry's injury rate - far safer than the typical Electric power generation, fossil fuel (e.g., coal, oil, gas) workplace, earning a grade A.
Tenaska Frontier Generating Station: 0.4 TCR = 32% of Electric power generation, fossil fuel (e.g., coal, oil, gas) BLS 1.2 · 9y Form 300A (see methodology below)
Tenaska Frontier Generating Station safety composite
Tenaska Frontier Generating Station scores strongest on total case rate (tcr) (safer than 93% of same-industry peers) and weakest on fatalities (safer than 51%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
75/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- A 0.38 per 100 workers
Safer than 93% of industry peers
- DART rate
- C 0 per 100 workers
Safer than 71% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Tenaska Frontier Generating Station held a steady TCR band
Tenaska Frontier Generating Station's TCR held near 0.0 from 0.0 in 2016 to 0.0 in 2024. Peak filing year was 2019 at 3.4 TCR. In 2024, DART was 0× this establishment's average TCR (severity share of cases).
2016=0.0 · 2017=0.0 · 2018=0.0 · 2019=3.4 · 2020=0.0 · 2021=0.0 · 2022=0.0 · 2023=0.0 · 2024=0.0
OSHA ITA Form 300A scorecard
Establishment book 221112 · Shiro, TX AT/BELOW-IND · SMALL
Grade A · TCR 0.4 · 32% of ind
- DART 0.0 DART
- RANK #6/86
- PHOTO PWC West County Ener…
- BOOK 9y book
- INJ 1 inj
- SIZE ~28 FTE
Nearest TCR peer: PWC West County Energy Center (0.0 TCR gap)
Read with this employer → · Industry book → · Texas employers → · Look up another →
Tenaska Frontier Generating Station in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Tenaska Frontier Generating Station
0.4 TCR
- PWC West Count
PWC West County Energy Center
0.4 TCR
- Lark Maintenan
Lark Maintenance Facility
0.4 TCR
- Oneta Power, L
Oneta Power, LLC
0.4 TCR
- Ybor Data Cent
Ybor Data Center
0.4 TCR
What this shows Tenaska Frontier Generating Station averages 0.4 TCR (32% of the Electric power generation, fossil fuel (e.g., coal, oil, gas) BLS benchmark).
Tenaska Frontier Generating Station TCR series: 2016=0 · 2017=0 · 2018=0 · 2019=3.4 · 2020=0 · 2021=0 · 2022=0 · 2023=0 · 2024=0 · BLS 1.2
Where Tenaska Frontier Generating Station falls in its industry
846 Electric power generation, fos establishmentsSafer than 93% of graded establishments in this industry, whose median TCR is 1.5.
Narrower to Texas alone (the establishments it most directly competes with for workers and contracts): ranked #6 safest of 86 Electric power generation, fos employers in Texas.
Tenaska Frontier Generating Station has fewer employees than the Electric power generation, fossil fuel ( median and a lower injury rate than the industry's median TCR of 1.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2023 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2022 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2021 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2020 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2019 | 3.4 | 0.0 | 1 | 0 | 0 |
| 2018 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2017 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2016 | 0.0 | 0.0 | 0 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221112 · TX · Shiro
846 Electric power generation, fossil fuel (e.g., coal, oil, gas) employers nationwide with a credible TCR · 38,394 rated employers in Texas with headcount on file · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | PWC West County Energy Center | 0.4 TCR |
| NAICS-TCR | Lark Maintenance Facility | 0.4 TCR |
| NAICS-TCR | Oneta Power, LLC | 0.4 TCR |
| NAICS-TCR | Ybor Data Center | 0.4 TCR |
| STATE-SIZE | Village farms of Fort Worth | 28 FTE |
| STATE-SIZE | Circle X Land & Cattle Co., Ltd. | 28 FTE |
| STATE-SIZE | Happy Hen Harwood | 28 FTE |
| STATE-SIZE | Ten Hi Gin INC | 28 FTE |
| NAT-TCR | Southern WV Paving | 0.4 TCR |
| NAT-TCR | Illinois Tool Works Electronic Assembly Equipment - Camdenton, MO 65020 | 0.4 TCR |
| NAT-TCR | Empire District Corporate Office | 0.4 TCR |
| NAT-TCR | The Chemours Company FC, LLC - Belle | 0.4 TCR |
| NAT-SIZE | Rayco Roof Service, Inc. | 28 FTE |
| NAT-SIZE | R+L Carriers - TCS | 28 FTE |
| NAT-SIZE | Fire | 28 FTE |
| NAT-SIZE | Ward Trucking LLC-Winchester | 28 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.