Culverts, highway, road and street, construction · Oregon
Tidewater Contractors, Inc.
Brookings, OR · ~78 workers · 8 years of OSHA Injury Tracking Application data.
- F
- Failing Safety Record
- 10.0
- Avg TCR
- 2.8
- Industry avg
- 0
- Fatalities
The verdict
Tidewater Contractors, Inc. runs at 357% of its industry's injury rate - far more dangerous than the typical Culverts, highway, road and street, construction workplace, earning a grade F.
Tidewater Contractors, Inc.: 10.0 TCR = 357% of Culverts, highway, road and street, construction BLS 2.8 · 8y Form 300A (see methodology below)
Tidewater Contractors, Inc. safety composite
Tidewater Contractors, Inc. scores strongest on fatalities (safer than 53% of same-industry peers) and weakest on total case rate (tcr) (safer than 9%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
27/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- F 9.99 per 100 workers
Safer than 9% of industry peers
- DART rate
- F 2.97 per 100 workers
Safer than 28% of industry peers
- Fatalities
- D 0
Safer than 53% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Rising injury rate
Tidewater Contractors, Inc.: 3.9 → 14.8 TCR
Peak year 2020 @ 16.1 TCR · DART/TCR 0.3× in 2024
Tidewater Contractors, Inc.'s TCR rose 11.0 from 3.9 in 2016 to 14.8 in 2024. Peak filing year was 2020 at 16.1 TCR. In 2024, DART was 0.3× this establishment's average TCR (severity share of cases).
OSHA ITA Form 300A scorecard
Establishment book 237310 · Brookings, OR ABOVE-IND · SMALL
Grade F · TCR 10.0 · 357% of ind
- DART 3.0 DART
- RANK #116/135
- PHOTO Hanging Rock AHQ
- BOOK 8y book
- INJ 26 inj
- SIZE ~78 FTE
Nearest TCR peer: Hanging Rock AHQ (0.0 TCR gap)
Read with this employer → · Industry book → · Oregon employers → · Look up another →
Tidewater Contractors, Inc. in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Tidewater Contractors, Inc.
10 TCR
- Hanging Rock A
Hanging Rock AHQ
10 TCR
- Baseline Contr
Baseline Contracting, Inc.
10 TCR
- D2 Rockford Ya
D2 Rockford Yard
10 TCR
- Transportation
Transportation Services
10 TCR
What this shows Tidewater Contractors, Inc. averages 10.0 TCR (357% of the Culverts, highway, road and street, construction BLS benchmark).
Tidewater Contractors, Inc. TCR series: 2016=3.9 · 2019=5.7 · 2020=16.1 · 2021=8.3 · 2022=8.2 · 2023=13.1 · 2024=14.8 · BLS 2.8
Where Tidewater Contractors, Inc. falls in its industry
4,078 Culverts, highway, road and st establishmentsSafer than 9% of graded establishments in this industry, whose median TCR is 3.0.
Narrower to Oregon alone (the establishments it most directly competes with for workers and contracts): ranked #116 safest of 135 Culverts, highway, road and st employers in Oregon.
Tidewater Contractors, Inc. has more employees than the Culverts, highway, road and street, cons median and a higher injury rate than the industry's median TCR of 3.0. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 14.8 | 3.0 | 3 | 7 | 0 |
| 2023 | 13.1 | 2.9 | 3 | 6 | 0 |
| 2022 | 8.2 | 0.0 | 0 | 6 | 0 |
| 2021 | 8.3 | 4.1 | 3 | 3 | 0 |
| 2020 | 16.1 | 5.0 | 11 | 2 | 0 |
| 2019 | 5.7 | 2.3 | 3 | 2 | 0 |
| 2018 | - | - | 0 | 0 | 0 |
| 2016 | 3.9 | 3.1 | 3 | 2 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
237310 · OR · Brookings
4,078 Culverts, highway, road and street, construction employers nationwide with a credible TCR · 8,031 rated employers in Oregon with headcount on file · 20 employers in Brookings, OR · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Hanging Rock AHQ | 10.0 TCR |
| NAICS-TCR | Baseline Contracting, Inc. | 10.0 TCR |
| NAICS-TCR | D2 Rockford Yard | 10.0 TCR |
| NAICS-TCR | Transportation Services | 10.0 TCR |
| STATE-SIZE | Oregon Harvesting Inc | 78 FTE |
| STATE-SIZE | NSC:NSK11 - NSK11-North Sky - Sherwood, OR | 78 FTE |
| STATE-SIZE | LTM, Incorporated dba Knife River Materials Coos Bay | 78 FTE |
| STATE-SIZE | John's Waterproofing Co | 78 FTE |
| CITY-NEAR | 701-00030 | 294 FTE |
| CITY-NEAR | Curry Medical Center - Brookings | 131 FTE |
| CITY-NEAR | Ocean Park | 83 FTE |
| CITY-NEAR | Kalmiopsis Elementary School | 70 FTE |
| NAT-TCR | Angelus Block - Tuxford | 10.0 TCR |
| NAT-TCR | Hampton Inn & Suites Williamsport-Faxon Exit | 10.0 TCR |
| NAT-TCR | 122 Residence Inn | 10.0 TCR |
| NAT-TCR | Lion Country Safari, Inc. - FL | 10.0 TCR |
| NAT-SIZE | Midway | 78 FTE |
| NAT-SIZE | Construction Engineers Inc | 78 FTE |
| NAT-SIZE | Pittsburgh Parts Manufacturing Center | 78 FTE |
| NAT-SIZE | doraville terminal | 78 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.