Petrochemical plant construction · Texas

Worley Field Services at Celanese Clear Lake Panther Project

Pasadena, TX · ~225 workers · 2 years of OSHA Injury Tracking Application data.

A
Excellent Safety Record
0.9
Avg TCR
2.8
Industry avg
0
Fatalities
Subscribe to safety-record updates (RSS)

The verdict

Worley Field Services at Celanese Clear Lake Panther Project runs at 31% of its industry's injury rate - far safer than the typical Petrochemical plant construction workplace, earning a grade A.

Worley Field Services at Celanese Clear Lake Panther Project: 0.9 TCR = 31% of Petrochemical plant construction BLS 2.8 · 2y Form 300A (see methodology below)

Worley Field Services at Celanese Clear Lake Panther Project safety composite

Worley Field Services at Celanese Clear Lake Panther Project scores strongest on fatalities (safer than 52% of same-industry peers) and weakest on dart rate (safer than 9%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).

F

34/100

Percentile-weighted across 3 of 3 measures

Total Case Rate (TCR)
D 0.87 per 100 workers

Safer than 44% of industry peers

DART rate
F 1.74 per 100 workers

Safer than 9% of industry peers

Fatalities
D 0

Safer than 52% of industry peers

Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).

Rising injury rate

Worley Field Services at Celanese Clear Lake Panther Project: 0.0 → 1.7 TCR

Peak year 2023 @ 1.7 TCR · DART/TCR 2× in 2023

Worley Field Services at Celanese Clear Lake Panther Project's TCR rose 1.7 from 0.0 in 2022 to 1.7 in 2023. In 2023, DART was 2× this establishment's average TCR (severity share of cases).

OSHA ITA Form 300A scorecard

Establishment book 237120 · Pasadena, TX AT/BELOW-IND · MID

Grade A · TCR 0.9 · 31% of ind

  • DART 1.7 DART
  • RANK #174/216
  • PHOTO Primoris Distributio…
  • BOOK 2y book
  • INJ 2 inj
  • SIZE ~225 FTE

Nearest TCR peer: Primoris Distribution Services - Area 70 (0.0 TCR gap)

Read with this employer → · Industry book → · Texas employers → · Look up another →

Worley Field Services at Celanese Clear Lake Panther Project in the TCR neighbourhood

Average Total Case Rate among this establishment and nearest same-industry peers

TCR

What this shows Worley Field Services at Celanese Clear Lake Panther Project averages 0.9 TCR (31% of the Petrochemical plant construction BLS benchmark).

Source U.S. Department of Labor, OSHA Injury Tracking Application (Form 300A) As of 2026-08-25

Worley Field Services at Celanese Clear Lake Panther Project TCR series: 2022=0 · 2023=1.7 · BLS 2.8

Where Worley Field Services at Celanese Clear Lake Panther Project falls in its industry

809 Petrochemical plant constructi establishments

Safer than 44% of graded establishments in this industry, whose median TCR is 0.7.

More dangerous than peersSafer than peers

Narrower to Texas alone (the establishments it most directly competes with for workers and contracts): ranked #174 safest of 216 Petrochemical plant constructi employers in Texas.

Worley Field Services at Celanese Clear Lake Panther Project (225 employees, TCR 0.9) among 29 same-industry peers, split at the industry median of 137 employees and a TCR of 0.7 2×2 strategic matrix plotting 30 entities by Average employees (X) and Total Case Rate (Y), with a crosshair dividing the plot into four quadrants. Larger & higher-riskSmaller & higher-riskLarger & saferSmaller & safer than peers 01,0002,0003,0004,000 01234 Average employees Total Case Rate Worley Field Services at Celanese Clear Lake Panther Project
Worley Field Services at Celanese Clear Lake Panther Project (225 employees, TCR 0.9) among 29 same-industry peers, split at the industry median of 137 employees and a TCR of 0.7

Worley Field Services at Celanese Clear Lake Panther Project has more employees than the Petrochemical plant construction median and a higher injury rate than the industry's median TCR of 0.7. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.

Year-by-Year Safety Data

Year TCR DART Injuries Illnesses Fatalities
2023 1.7 1.7 2 0 0
2022 0.0 0.0 0 0 0

OSHA ITA peer cross-reference

Establishment peer ledger

237120 · TX · Pasadena

809 Petrochemical plant construction employers nationwide with a credible TCR · 38,394 rated employers in Texas with headcount on file · 385 employers in Pasadena, TX · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.

Rel Establishment Metric
NAICS-TCR Primoris Distribution Services - Area 70 0.9 TCR
NAICS-TCR Field Personnel Services 0.9 TCR
NAICS-TCR Delta 0.9 TCR
NAICS-TCR Bi-Con Services - Construction 0.9 TCR
STATE-SIZE Xtreme Drilling Inc. 225 FTE
STATE-SIZE Harrisburg Service Center CP51 225 FTE
STATE-SIZE 7421-Ineos Chocolate Bayou 225 FTE
STATE-SIZE C1635 - Lyondellbasell - Potba 225 FTE
CITY-NEAR PSC Group 4,297 FTE
CITY-NEAR Petroleum Service Corporation 3,468 FTE
CITY-NEAR JVIC 3,226 FTE
CITY-NEAR Brand Energy Solutions, LLC - Houston 2,015 FTE
NAT-TCR Johnson Bros. Corporation, a Southland Company - 2730 Brightline Zone 4 Phase II 0.9 TCR
NAT-TCR Rockwell Automation- East Setauket NY (LON) 0.9 TCR
NAT-TCR Big Lots Store #5198 Middleton, NJ 0.9 TCR
NAT-TCR G G Marck & Associates 0.9 TCR
NAT-SIZE South Bay Family YMCA and Teen Center 225 FTE
NAT-SIZE Hale Products Inc 225 FTE
NAT-SIZE Siemens Energy 225 FTE
NAT-SIZE Virtua - 303 Lippincott 225 FTE

Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →

Data Source: OSHA Injury Tracking Application (ITA), mandatory establishment-level injury/illness reports. Grades compare employer Total Case Rate (TCR) to BLS IIF industry benchmarks. Data covers years reported by this establishment: 2023, 2022. This is publicly available government data - not a legal determination of workplace conditions.
Data sourced from official public datasets. See our methodology for details.