Addition, alteration and renovation for-sale builders, commercial and institutional building · Colorado

Academy at Mapleton Hill

Englewood, CO · ~30 workers · 2 years of OSHA Injury Tracking Application data.

F
Failing Safety Record
7.1
Avg TCR
2.9
Industry avg
0
Fatalities
Subscribe to safety-record updates (RSS)

The verdict

Academy at Mapleton Hill runs at 243% of its industry's injury rate - far more dangerous than the typical Addition, alteration and renovation for-sale builders, commercial and institutional building workplace, earning a grade F.

Academy at Mapleton Hill: 7.1 TCR = 243% of Addition, alteration and renovation for-sale builders, commercial and institutional building BLS 2.9 · 2y Form 300A (see methodology below)

Academy at Mapleton Hill safety composite

Academy at Mapleton Hill scores strongest on fatalities (safer than 51% of same-industry peers) and weakest on total case rate (tcr) (safer than 12%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).

F

25/100

Percentile-weighted across 3 of 3 measures

Total Case Rate (TCR)
F 7.06 per 100 workers

Safer than 12% of industry peers

DART rate
F 2.74 per 100 workers

Safer than 21% of industry peers

Fatalities
D 0

Safer than 51% of industry peers

Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).

TCR Δ

−3.2

2021→2022

Academy at Mapleton Hill injury rate improved

Academy at Mapleton Hill's TCR fell 3.2 from 8.7 in 2021 to 5.5 in 2022. Peak filing year was 2021 at 8.7 TCR. In 2022, DART was 0.39× this establishment's average TCR (severity share of cases).

2021=8.7 · 2022=5.5

OSHA ITA Form 300A scorecard

Establishment book 236220 · Englewood, CO ABOVE-IND · SMALL

Grade F · TCR 7.1 · 243% of ind

  • DART 2.7 DART
  • RANK #133/148
  • PHOTO Sharp Construction.LLC
  • BOOK 2y book
  • INJ 4 inj
  • SIZE ~30 FTE

Nearest TCR peer: Sharp Construction.LLC (0.0 TCR gap)

Read with this employer → · Industry book → · Colorado employers → · Look up another →

Academy at Mapleton Hill in the TCR neighbourhood

Average Total Case Rate among this establishment and nearest same-industry peers

TCR

What this shows Academy at Mapleton Hill averages 7.1 TCR (243% of the Addition, alteration and renovation for-sale builders, commercial and institutional building BLS benchmark).

Source U.S. Department of Labor, OSHA Injury Tracking Application (Form 300A) As of 2026-08-25

Academy at Mapleton Hill TCR series: 2021=8.7 · 2022=5.5 · BLS 2.9

Where Academy at Mapleton Hill falls in its industry

4,692 Addition, alteration and renov establishments

Safer than 12% of graded establishments in this industry, whose median TCR is 2.3.

More dangerous than peersSafer than peers

Narrower to Colorado alone (the establishments it most directly competes with for workers and contracts): ranked #133 safest of 148 Addition, alteration and renov employers in Colorado.

Academy at Mapleton Hill (30 employees, TCR 7.1) among 29 same-industry peers, split at the industry median of 55 employees and a TCR of 2.3 2×2 strategic matrix plotting 30 entities by Average employees (X) and Total Case Rate (Y), with a crosshair dividing the plot into four quadrants. Larger & higher-riskSmaller & higher-riskLarger & saferSmaller & safer than peers 0100200300400500 02468 Average employees Total Case Rate Academy at Mapleton Hill
Academy at Mapleton Hill (30 employees, TCR 7.1) among 29 same-industry peers, split at the industry median of 55 employees and a TCR of 2.3

Academy at Mapleton Hill has fewer employees than the Addition, alteration and renovation for- median and a higher injury rate than the industry's median TCR of 2.3. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.

Year-by-Year Safety Data

Year TCR DART Injuries Illnesses Fatalities
2022 5.5 2.7 2 0 0
2021 8.7 4.3 2 0 0

OSHA ITA peer cross-reference

Establishment peer ledger

236220 · CO · Englewood

4,692 Addition, alteration and renovation for-sale builders, commercial and institutional building employers nationwide with a credible TCR · 9,007 rated employers in Colorado with headcount on file · 325 employers in Englewood, CO · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.

Rel Establishment Metric
NAICS-TCR Sharp Construction.LLC 7.1 TCR
NAICS-TCR Graham Construction 7.0 TCR
NAICS-TCR M. E. Construction, Inc. 7.0 TCR
NAICS-TCR Hard Surface Finishers 7.0 TCR
STATE-SIZE 5280 S Services LLC 30 FTE
STATE-SIZE KP Squared LLC 30 FTE
STATE-SIZE Evergreen Service Center 30 FTE
STATE-SIZE Krueger Construction Management LLC 30 FTE
CITY-NEAR WAH - East and West 2,183 FTE
CITY-NEAR Corporate Meridian 2,030 FTE
CITY-NEAR Swedish Medical Center 1,516 FTE
CITY-NEAR ULA-Denver 1,324 FTE
NAT-TCR Capriati Construction Corp 7.1 TCR
NAT-TCR 0687 - Iwilei Hi Whse 7.1 TCR
NAT-TCR 0316 - Staten Island Ny Whse 7.1 TCR
NAT-TCR Bed Bath and Beyond West Nashville 7.1 TCR
NAT-SIZE Whispering Oaks 30 FTE
NAT-SIZE Gerben Leyendekker Dairy 30 FTE
NAT-SIZE D&S Machine Works Inc. 30 FTE
NAT-SIZE Sodexo at the Pennington School 30 FTE

Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →

Data Source: OSHA Injury Tracking Application (ITA), mandatory establishment-level injury/illness reports. Grades compare employer Total Case Rate (TCR) to BLS IIF industry benchmarks. Data covers years reported by this establishment: 2022, 2021. This is publicly available government data - not a legal determination of workplace conditions.
Data sourced from official public datasets. See our methodology for details.