Arden, NC · ~68 workers · 9 years of OSHA Injury Tracking Application data.
- A
- Excellent Safety Record
- 0.2
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Asheville Skyland Fossil and CT Plants runs at 20% of its industry's injury rate - far safer than the typical Fossil Fuel Electric Power Generation workplace, earning a grade A.
Asheville Skyland Fossil and CT Plants: 0.2 TCR = 20% of Fossil Fuel Electric Power Generation BLS 1.2 · 9y Form 300A (see methodology below)
Asheville Skyland Fossil and CT Plants safety composite
Asheville Skyland Fossil and CT Plants scores strongest on total case rate (tcr) (safer than 97% of same-industry peers) and weakest on fatalities (safer than 51%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
76/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- A 0.24 per 100 workers
Safer than 97% of industry peers
- DART rate
- C 0 per 100 workers
Safer than 71% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
TCR Δ
−1.0
2016→2024
Asheville Skyland Fossil and CT Plants injury rate improved
Asheville Skyland Fossil and CT Plants's TCR fell 1.0 from 1.0 in 2016 to 0.0 in 2024. Peak filing year was 2019 at 1.1 TCR. In 2024, DART was 0× this establishment's average TCR (severity share of cases).
2016=1.0 · 2017=0.0 · 2018=0.0 · 2019=1.1 · 2020=0.0 · 2021=0.0 · 2022=0.0 · 2023=0.0 · 2024=0.0
OSHA ITA Form 300A scorecard
Establishment book 221112 · Arden, NC AT/BELOW-IND · SMALL
Grade A · TCR 0.2 · 20% of ind
- DART 0.0 DART
- RANK #3/20
- PHOTO TS Power Plant
- BOOK 9y book
- INJ 2 inj
- SIZE ~68 FTE
Nearest TCR peer: TS Power Plant (0.0 TCR gap)
Read with this employer → · Industry book → · North Carolina employers → · Look up another →
Asheville Skyland Fossil and CT Plants in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- PCR Plant Cris 0.3
PCR Plant Crist
0.3 TCR
- This site 0.2
Asheville Skyland Fossil and CT Plants
0.2 TCR
- TS Power Plant 0.2
TS Power Plant
0.2 TCR
- Riverside 2700 0.2
Riverside 2700
0.2 TCR
- North Carolina 0.2
North Carolina Electric Cooperatives
0.2 TCR
What this shows Asheville Skyland Fossil and CT Plants averages 0.2 TCR (20% of the Fossil Fuel Electric Power Generation BLS benchmark).
Asheville Skyland Fossil and CT Plants TCR series: 2016=1 · 2017=0 · 2018=0 · 2019=1.1 · 2020=0 · 2021=0 · 2022=0 · 2023=0 · 2024=0 · BLS 1.2
Where Asheville Skyland Fossil and CT Plants falls in its industry
846 Fossil Fuel Electric Power Gen establishmentsSafer than 97% of graded establishments in this industry, whose median TCR is 1.5.
Narrower to North Carolina alone (the establishments it most directly competes with for workers and contracts): ranked #3 safest of 20 Fossil Fuel Electric Power Gen employers in North Carolina.
Asheville Skyland Fossil and CT Plants has more employees than the Fossil Fuel Electric Power Generation median and a lower injury rate than the industry's median TCR of 1.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2023 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2022 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2021 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2020 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2019 | 1.1 | 0.0 | 1 | 0 | 0 |
| 2018 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2017 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2016 | 1.0 | 0.0 | 1 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221112 · NC · Arden
846 Fossil Fuel Electric Power Generation employers nationwide with a credible TCR · 16,981 rated employers in North Carolina with headcount on file · 77 employers in Arden, NC · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | TS Power Plant | 0.2 TCR |
| NAICS-TCR | Riverside 2700 | 0.2 TCR |
| NAICS-TCR | North Carolina Electric Cooperatives | 0.2 TCR |
| NAICS-TCR | PCR Plant Crist | 0.3 TCR |
| STATE-SIZE | Pittsboro | 68 FTE |
| STATE-SIZE | Rehab Builders, Inc. | 68 FTE |
| STATE-SIZE | KRG Utility, Inc | 68 FTE |
| STATE-SIZE | B.R.S., Inc. | 68 FTE |
| CITY-NEAR | ASHEVILLE NC | 997 FTE |
| CITY-NEAR | DUKE-ASHEVILLE | 847 FTE |
| CITY-NEAR | BorgWarner Asheville | 680 FTE |
| CITY-NEAR | Jabil Healthcare Asheville | 566 FTE |
| NAT-TCR | Mandan Refinery | 0.2 TCR |
| NAT-TCR | Canton Refinery | 0.2 TCR |
| NAT-TCR | Scott Lawn Yard Inc | 0.2 TCR |
| NAT-TCR | Palisades | 0.2 TCR |
| NAT-SIZE | Brookdale Carmel | 68 FTE |
| NAT-SIZE | AZZ Galvanizing - Rockford LLC | 68 FTE |
| NAT-SIZE | Mid City Corporation | 68 FTE |
| NAT-SIZE | Corp Carriage House | 68 FTE |