Fossil Fuel Electric Power Generation · Pennsylvania
Bethlehem Energy Center
Bethlehem, PA · ~28 workers · 9 years of OSHA Injury Tracking Application data.
- B
- Good Safety Record
- 0.7
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Bethlehem Energy Center runs at 61% of its industry's injury rate - safer than the typical Fossil Fuel Electric Power Generation workplace, earning a grade B.
Bethlehem Energy Center: 0.7 TCR = 61% of Fossil Fuel Electric Power Generation BLS 1.2 · 9y Form 300A (see methodology below)
Bethlehem Energy Center safety composite
Bethlehem Energy Center scores strongest on total case rate (tcr) (safer than 77% of same-industry peers) and weakest on fatalities (safer than 51%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
68/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- B 0.73 per 100 workers
Safer than 77% of industry peers
- DART rate
- C 0 per 100 workers
Safer than 71% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Bethlehem Energy Center held a steady TCR band
Bethlehem Energy Center's TCR held near 0.0 from 0.0 in 2016 to 0.0 in 2024. Peak filing year was 2023 at 3.4 TCR. In 2024, DART was 0× this establishment's average TCR (severity share of cases).
2016=0.0 · 2017=3.1 · 2018=0.0 · 2019=0.0 · 2020=0.0 · 2021=0.0 · 2022=0.0 · 2023=3.4 · 2024=0.0
OSHA ITA Form 300A scorecard
Establishment book 221112 · Bethlehem, PA AT/BELOW-IND · SMALL
Grade B · TCR 0.7 · 61% of ind
- DART 0.0 DART
- RANK #8/46
- PHOTO Woodsdale Generating…
- BOOK 9y book
- INJ 2 inj
- SIZE ~28 FTE
Nearest TCR peer: Woodsdale Generating Station (0.0 TCR gap)
Read with this employer → · Industry book → · Pennsylvania employers → · Look up another →
Bethlehem Energy Center in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Bethlehem Energy Center
0.7 TCR
- Woodsdale Gene
Woodsdale Generating Station
0.7 TCR
- Bay Shore
Bay Shore
0.7 TCR
- Prairie State
Prairie State Generating Company - Power Block
0.7 TCR
- Cane Run
Cane Run
0.7 TCR
What this shows Bethlehem Energy Center averages 0.7 TCR (61% of the Fossil Fuel Electric Power Generation BLS benchmark).
Bethlehem Energy Center TCR series: 2016=0 · 2017=3.1 · 2018=0 · 2019=0 · 2020=0 · 2021=0 · 2022=0 · 2023=3.4 · 2024=0 · BLS 1.2
Where Bethlehem Energy Center falls in its industry
846 Fossil Fuel Electric Power Gen establishmentsSafer than 77% of graded establishments in this industry, whose median TCR is 1.5.
Narrower to Pennsylvania alone (the establishments it most directly competes with for workers and contracts): ranked #8 safest of 46 Fossil Fuel Electric Power Gen employers in Pennsylvania.
Bethlehem Energy Center has fewer employees than the Fossil Fuel Electric Power Generation median and a lower injury rate than the industry's median TCR of 1.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2023 | 3.4 | 0.0 | 1 | 0 | 0 |
| 2022 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2021 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2020 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2019 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2018 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2017 | 3.1 | 3.1 | 1 | 0 | 0 |
| 2016 | 0.0 | 0.0 | 0 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221112 · PA · Bethlehem
846 Fossil Fuel Electric Power Generation employers nationwide with a credible TCR · 22,692 rated employers in Pennsylvania with headcount on file · 358 employers in Bethlehem, PA · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Woodsdale Generating Station | 0.7 TCR |
| NAICS-TCR | Bay Shore | 0.7 TCR |
| NAICS-TCR | Prairie State Generating Company - Power Block | 0.7 TCR |
| NAICS-TCR | Cane Run | 0.7 TCR |
| STATE-SIZE | Masda Mushroom LLC | 28 FTE |
| STATE-SIZE | Scenery Hill | 28 FTE |
| STATE-SIZE | Production Fire and Safety LLC., DBA Ampro Strategic Alliance PA | 28 FTE |
| STATE-SIZE | Lackawanna Energy Center | 28 FTE |
| CITY-NEAR | St. Luke's Hospital | 5,338 FTE |
| CITY-NEAR | St. Luke's Physician's Group | 3,041 FTE |
| CITY-NEAR | LVH-Muhlenberg | 2,139 FTE |
| CITY-NEAR | 4087 | 2,105 FTE |
| NAT-TCR | MEJA Construction, Inc. | 0.7 TCR |
| NAT-TCR | Timberlake Construction Co. Inc. | 0.7 TCR |
| NAT-TCR | Store #7 | 0.7 TCR |
| NAT-TCR | Corporate Office | 0.7 TCR |
| NAT-SIZE | Pastoria Energy Facility | 28 FTE |
| NAT-SIZE | Russell City Energy Center | 28 FTE |
| NAT-SIZE | Vcf 029 | 28 FTE |
| NAT-SIZE | 06 Grand Rapids | 28 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.