Ready-mix concrete manufacturing and distributing · Washington

East Vancouver Ready Mix

Vancouver, WA · ~33 workers · 6 years of OSHA Injury Tracking Application data.

F
Failing Safety Record
17.9
Avg TCR
3.3
Industry avg
0
Fatalities
Subscribe to safety-record updates (RSS)

The verdict

East Vancouver Ready Mix runs at 543% of its industry's injury rate - far more dangerous than the typical Ready-mix concrete manufacturing and distributing workplace, earning a grade F.

East Vancouver Ready Mix: 17.9 TCR = 543% of Ready-mix concrete manufacturing and distributing BLS 3.3 · 6y Form 300A (see methodology below)

East Vancouver Ready Mix safety composite

East Vancouver Ready Mix scores strongest on fatalities (safer than 51% of same-industry peers) and weakest on total case rate (tcr) (safer than 1%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).

F

15/100

Percentile-weighted across 3 of 3 measures

Total Case Rate (TCR)
F 17.92 per 100 workers

Safer than 1% of industry peers

DART rate
F 13.33 per 100 workers

Safer than 4% of industry peers

Fatalities
D 0

Safer than 51% of industry peers

Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).

Rising injury rate

East Vancouver Ready Mix: 15.6 → 24.0 TCR

Peak year 2020 @ 32.3 TCR · DART/TCR 0.74× in 2023

East Vancouver Ready Mix's TCR rose 8.4 from 15.6 in 2018 to 24.0 in 2023. Peak filing year was 2020 at 32.3 TCR. In 2023, DART was 0.74× this establishment's average TCR (severity share of cases).

OSHA ITA Form 300A scorecard

Establishment book 327320 · Vancouver, WA ABOVE-IND · SMALL

Grade F · TCR 17.9 · 543% of ind

  • DART 13.3 DART
  • RANK #20/20
  • PHOTO National City Ready …
  • BOOK 6y book
  • INJ 19 inj
  • SIZE ~33 FTE

Nearest TCR peer: National City Ready Mix (0.2 TCR gap)

Read with this employer → · Industry book → · Washington employers → · Look up another →

East Vancouver Ready Mix in the TCR neighbourhood

Average Total Case Rate among this establishment and nearest same-industry peers

TCR

What this shows East Vancouver Ready Mix averages 17.9 TCR (543% of the Ready-mix concrete manufacturing and distributing BLS benchmark).

Source U.S. Department of Labor, OSHA Injury Tracking Application (Form 300A) As of 2026-08-25

East Vancouver Ready Mix TCR series: 2018=15.6 · 2019=7.5 · 2020=32.3 · 2021=22 · 2022=6.1 · 2023=24 · BLS 3.3

Where East Vancouver Ready Mix falls in its industry

1,316 Ready-mix concrete manufacturi establishments

Safer than 1% of graded establishments in this industry, whose median TCR is 4.5.

More dangerous than peersSafer than peers

Narrower to Washington alone (the establishments it most directly competes with for workers and contracts): ranked #20 safest of 20 Ready-mix concrete manufacturi employers in Washington.

East Vancouver Ready Mix (33 employees, TCR 17.9) among 29 same-industry peers, split at the industry median of 33 employees and a TCR of 4.5 2×2 strategic matrix plotting 30 entities by Average employees (X) and Total Case Rate (Y), with a crosshair dividing the plot into four quadrants. Larger & higher-riskSmaller & higher-riskLarger & saferSmaller & safer than peers 0100200300400500 05101520 Average employees Total Case Rate East Vancouver Ready Mix
East Vancouver Ready Mix (33 employees, TCR 17.9) among 29 same-industry peers, split at the industry median of 33 employees and a TCR of 4.5

East Vancouver Ready Mix has more employees than the Ready-mix concrete manufacturing and dis median and a higher injury rate than the industry's median TCR of 4.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.

Year-by-Year Safety Data

Year TCR DART Injuries Illnesses Fatalities
2023 24.0 13.3 5 4 0
2022 6.1 6.1 2 0 0
2021 22.0 16.5 3 5 0
2020 32.3 24.2 2 10 0
2019 7.5 2.5 2 1 0
2018 15.6 10.4 5 1 0

OSHA ITA peer cross-reference

Establishment peer ledger

327320 · WA · Vancouver

1,316 Ready-mix concrete manufacturing and distributing employers nationwide with a credible TCR · 10,147 rated employers in Washington with headcount on file · 490 employers in Vancouver, WA · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.

Rel Establishment Metric
NAICS-TCR National City Ready Mix 18.2 TCR
NAICS-TCR Elite Ready Mix 18.4 TCR
NAICS-TCR City Wide Construction Products 18.5 TCR
NAICS-TCR Geiger Ready Mix Plant 3 18.5 TCR
STATE-SIZE Olsen Ag Inc 33 FTE
STATE-SIZE Diamondback Acres Inc. 33 FTE
STATE-SIZE Washington 33 FTE
STATE-SIZE Trout Lake Farm West Farm 33 FTE
CITY-NEAR Hawthorn Senior Living 3,847 FTE
CITY-NEAR Southwest Medical Center Main Campus 3,464 FTE
CITY-NEAR 6994-PL600 1,970 FTE
CITY-NEAR 600 1,922 FTE
NAT-TCR Christian Care Assisted Living 17.9 TCR
NAT-TCR DGS Healthcare Elkin, Inc DBA Hugh Chatham Nursing Center 17.9 TCR
NAT-TCR Philadelphia 17.9 TCR
NAT-TCR Against the Grain Gourmet LLC 17.9 TCR
NAT-SIZE Oregon Administration Offices 33 FTE
NAT-SIZE Juvenile Detention Center 33 FTE
NAT-SIZE Espanola Transit Mix, LLC 33 FTE
NAT-SIZE Les Schwab Tire Center-McMinnville 33 FTE

Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →

Data Source: OSHA Injury Tracking Application (ITA), mandatory establishment-level injury/illness reports. Grades compare employer Total Case Rate (TCR) to BLS IIF industry benchmarks. Data covers years reported by this establishment: 2023, 2022, 2021, 2020, 2019, 2018. This is publicly available government data - not a legal determination of workplace conditions.
Data sourced from official public datasets. See our methodology for details.