Fossil Fuel Electric Power Generation · Delaware
Edge Moor Power Plant
Wilmington, DE · ~32 workers · 9 years of OSHA Injury Tracking Application data.
- B
- Good Safety Record
- 0.6
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Edge Moor Power Plant runs at 52% of its industry's injury rate - safer than the typical Fossil Fuel Electric Power Generation workplace, earning a grade B.
Edge Moor Power Plant: 0.6 TCR = 52% of Fossil Fuel Electric Power Generation BLS 1.2 · 9y Form 300A (see methodology below)
Edge Moor Power Plant safety composite
Edge Moor Power Plant scores strongest on total case rate (tcr) (safer than 83% of same-industry peers) and weakest on fatalities (safer than 51%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
71/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- B 0.62 per 100 workers
Safer than 83% of industry peers
- DART rate
- C 0 per 100 workers
Safer than 71% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Edge Moor Power Plant held a steady TCR band
Edge Moor Power Plant's TCR held near 0.0 from 0.0 in 2016 to 0.0 in 2024. Peak filing year was 2019 at 2.9 TCR. In 2024, DART was 0× this establishment's average TCR (severity share of cases).
2016=0.0 · 2017=2.7 · 2018=0.0 · 2019=2.9 · 2020=0.0 · 2021=0.0 · 2022=0.0 · 2023=0.0 · 2024=0.0
OSHA ITA Form 300A scorecard
Establishment book 221112 · Wilmington, DE AT/BELOW-IND · SMALL
Grade B · TCR 0.6 · 52% of ind
- DART 0.0 DART
- RANK #3/5
- PHOTO Coughlin Power Station
- BOOK 9y book
- INJ 2 inj
- SIZE ~32 FTE
Nearest TCR peer: Coughlin Power Station (0.0 TCR gap)
Read with this employer → · Industry book → · Delaware employers → · Look up another →
Edge Moor Power Plant in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Edge Moor Power Plant
0.6 TCR
- Coughlin Power
Coughlin Power Station
0.6 TCR
- Cayuga Generat
Cayuga Generating Station
0.6 TCR
- JH Campbell An
JH Campbell Annex
0.6 TCR
- FRESH MEADOW P
FRESH MEADOW POWER / NE, LLC
0.6 TCR
What this shows Edge Moor Power Plant averages 0.6 TCR (52% of the Fossil Fuel Electric Power Generation BLS benchmark).
Edge Moor Power Plant TCR series: 2016=0 · 2017=2.7 · 2018=0 · 2019=2.9 · 2020=0 · 2021=0 · 2022=0 · 2023=0 · 2024=0 · BLS 1.2
Where Edge Moor Power Plant falls in its industry
846 Fossil Fuel Electric Power Gen establishmentsSafer than 83% of graded establishments in this industry, whose median TCR is 1.5.
Narrower to Delaware alone (the establishments it most directly competes with for workers and contracts): ranked #3 safest of 5 Fossil Fuel Electric Power Gen employers in Delaware.
Edge Moor Power Plant has fewer employees than the Fossil Fuel Electric Power Generation median and a lower injury rate than the industry's median TCR of 1.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2023 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2022 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2021 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2020 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2019 | 2.9 | 2.9 | 1 | 0 | 0 |
| 2018 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2017 | 2.7 | 2.7 | 1 | 0 | 0 |
| 2016 | 0.0 | 0.0 | 0 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221112 · DE · Wilmington
846 Fossil Fuel Electric Power Generation employers nationwide with a credible TCR · 1,487 rated employers in Delaware with headcount on file · 309 employers in Wilmington, DE · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Coughlin Power Station | 0.6 TCR |
| NAICS-TCR | Cayuga Generating Station | 0.6 TCR |
| NAICS-TCR | JH Campbell Annex | 0.6 TCR |
| NAICS-TCR | FRESH MEADOW POWER / NE, LLC | 0.6 TCR |
| STATE-SIZE | Leon N. Weiner & Associates, Inc. | 32 FTE |
| STATE-SIZE | NA-US-DE-Seaford-Ventura Drive | 32 FTE |
| STATE-SIZE | Kinetic Systems Inc. DuPont Delaware | 32 FTE |
| STATE-SIZE | Gardner-Gibson Seaford | 32 FTE |
| CITY-NEAR | 10 Wilmington | 9,107 FTE |
| CITY-NEAR | AstraZeneca Pharmaceuticals (Commercial Field-Based Personnel) | 4,907 FTE |
| CITY-NEAR | Amazon.com Services LLC - MTN1 | 3,143 FTE |
| CITY-NEAR | Hatzel & Buehler, Inc. | 1,841 FTE |
| NAT-TCR | Premier Power Maintenance Corp | 0.6 TCR |
| NAT-TCR | Vcf 160 | 0.6 TCR |
| NAT-TCR | Cabot Haverhill | 0.6 TCR |
| NAT-TCR | KCT - KUKA Systems N.A. LLC | 0.6 TCR |
| NAT-SIZE | Opelika OPK | 32 FTE |
| NAT-SIZE | Lincroft / Red Bank Courtyard By Marriott | 32 FTE |
| NAT-SIZE | Fore River Energy Center | 32 FTE |
| NAT-SIZE | Fleet Services | 32 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.