Electric power generation, fossil fuel (e.g., coal, oil, gas) · Wisconsin
Elmroad Generating Station
Oak Creek, WI · ~167 workers · 8 years of OSHA Injury Tracking Application data.
- D
- Poor Safety Record
- 2.4
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Elmroad Generating Station runs at 198% of its industry's injury rate - more dangerous than the typical Electric power generation, fossil fuel (e.g., coal, oil, gas) workplace, earning a grade D.
Elmroad Generating Station: 2.4 TCR = 198% of Electric power generation, fossil fuel (e.g., coal, oil, gas) BLS 1.2 · 8y Form 300A (see methodology below)
Elmroad Generating Station safety composite
Elmroad Generating Station scores strongest on fatalities (safer than 51% of same-industry peers) and weakest on dart rate (safer than 28%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
34/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- F 2.37 per 100 workers
Safer than 29% of industry peers
- DART rate
- F 1.23 per 100 workers
Safer than 28% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Rising injury rate
Elmroad Generating Station: 1.2 → 2.5 TCR
Peak year 2022 @ 3.8 TCR · DART/TCR 0.52× in 2024
Elmroad Generating Station's TCR rose 1.3 from 1.2 in 2017 to 2.5 in 2024. Peak filing year was 2022 at 3.8 TCR. In 2024, DART was 0.52× this establishment's average TCR (severity share of cases).
OSHA ITA Form 300A scorecard
Establishment book 221112 · Oak Creek, WI ABOVE-IND · MID
Grade D · TCR 2.4 · 198% of ind
- DART 1.2 DART
- RANK #4/11
- PHOTO Carty
- BOOK 8y book
- INJ 31 inj
- SIZE ~167 FTE
Nearest TCR peer: Carty (0.0 TCR gap)
Read with this employer → · Industry book → · Wisconsin employers → · Look up another →
Elmroad Generating Station in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Elmroad Generating Station
2.4 TCR
- Carty
Carty
2.4 TCR
- Tolk/Plant X S
Tolk/Plant X Station
2.4 TCR
- Ravenswood Gen
Ravenswood Generating Station
2.4 TCR
- OG&E-Seminole
OG&E-Seminole PP; EGX Gath/Trans
2.4 TCR
What this shows Elmroad Generating Station averages 2.4 TCR (198% of the Electric power generation, fossil fuel (e.g., coal, oil, gas) BLS benchmark).
Elmroad Generating Station TCR series: 2017=1.2 · 2018=1.9 · 2019=3.5 · 2020=3 · 2021=2.5 · 2022=3.8 · 2023=0.6 · 2024=2.5 · BLS 1.2
Where Elmroad Generating Station falls in its industry
846 Electric power generation, fos establishmentsSafer than 29% of graded establishments in this industry, whose median TCR is 1.5.
Narrower to Wisconsin alone (the establishments it most directly competes with for workers and contracts): ranked #4 safest of 11 Electric power generation, fos employers in Wisconsin.
Elmroad Generating Station has more employees than the Electric power generation, fossil fuel ( median and a higher injury rate than the industry's median TCR of 1.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 2.5 | 1.2 | 4 | 0 | 0 |
| 2023 | 0.6 | 0.6 | 1 | 0 | 0 |
| 2022 | 3.8 | 1.3 | 6 | 0 | 0 |
| 2021 | 2.5 | 1.9 | 4 | 0 | 0 |
| 2020 | 3.0 | 3.0 | 5 | 0 | 0 |
| 2019 | 3.5 | 1.7 | 6 | 0 | 0 |
| 2018 | 1.9 | 1.9 | 3 | 0 | 0 |
| 2017 | 1.2 | 0.0 | 2 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221112 · WI · Oak Creek
846 Electric power generation, fossil fuel (e.g., coal, oil, gas) employers nationwide with a credible TCR · 12,834 rated employers in Wisconsin with headcount on file · 134 employers in Oak Creek, WI · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Carty | 2.4 TCR |
| NAICS-TCR | Tolk/Plant X Station | 2.4 TCR |
| NAICS-TCR | Ravenswood Generating Station | 2.4 TCR |
| NAICS-TCR | OG&E-Seminole PP; EGX Gath/Trans | 2.4 TCR |
| STATE-SIZE | Pewaukee Data Center | 167 FTE |
| STATE-SIZE | Monarch Paving | 167 FTE |
| STATE-SIZE | MP Systems, Inc. | 167 FTE |
| STATE-SIZE | Milwaukee Plant | 167 FTE |
| CITY-NEAR | Amazon.com Services LLC - MKE2 | 3,202 FTE |
| CITY-NEAR | WIOAK - OAK CREEK | 1,358 FTE |
| CITY-NEAR | OAK CREEK (WIOAK) | 1,240 FTE |
| CITY-NEAR | Stella & Chewy's | 740 FTE |
| NAT-TCR | Pratt (Jet Corr), Inc. | 2.4 TCR |
| NAT-TCR | Phoenix Store | 2.4 TCR |
| NAT-TCR | Peterson Companies, Inc. | 2.4 TCR |
| NAT-TCR | Altoga | 2.4 TCR |
| NAT-SIZE | 2 Elizabeth | 167 FTE |
| NAT-SIZE | Auburn ME | 167 FTE |
| NAT-SIZE | Eventide Jamestown | 167 FTE |
| NAT-SIZE | King Kutter | 167 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.