Electric power generation, fossil fuel (e.g., coal, oil, gas) · Puerto Rico

Genera Mayaguez

San Juan, PR · ~21 workers · 2 years of OSHA Injury Tracking Application data.

C
Average Safety Record
0.0
Avg TCR
1.2
Industry avg
0
Fatalities
Subscribe to safety-record updates (RSS)

The verdict

Genera Mayaguez runs at 0% of its industry's injury rate - about level with the typical Electric power generation, fossil fuel (e.g., coal, oil, gas) workplace, earning a grade C.

Genera Mayaguez: 0.0 TCR = 0% of Electric power generation, fossil fuel (e.g., coal, oil, gas) BLS 1.2 · 2y Form 300A (see methodology below)

Genera Mayaguez safety composite

Genera Mayaguez scores strongest on total case rate (tcr) (safer than 100% of same-industry peers) and weakest on fatalities (safer than 51%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).

B

78/100

Percentile-weighted across 3 of 3 measures

Total Case Rate (TCR)
A 0 per 100 workers

Safer than 100% of industry peers

DART rate
C 0 per 100 workers

Safer than 71% of industry peers

Fatalities
D 0

Safer than 51% of industry peers

Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).

Genera Mayaguez held a steady TCR band

Genera Mayaguez's TCR held near 0.0 from 0.0 in 2023 to 0.0 in 2024. Peak filing year was 2023 at 0.0 TCR.

2023=0.0 · 2024=0.0

OSHA ITA Form 300A scorecard

Establishment book 221112 · San Juan, PR AT/BELOW-IND · SMALL

Grade C · TCR 0.0 · 0% of ind

  • DART 0.0 DART
  • RANK #0/4
  • PHOTO 00525 NORTH TEMPLE O…
  • BOOK 2y book
  • INJ 0 inj
  • SIZE ~21 FTE

Nearest TCR peer: 00525 NORTH TEMPLE OFFICE (0.0 TCR gap)

Read with this employer → · Industry book → · Puerto Rico employers → · Look up another →

Genera Mayaguez in the TCR neighbourhood

Average Total Case Rate among this establishment and nearest same-industry peers

TCR

What this shows Genera Mayaguez averages 0.0 TCR (0% of the Electric power generation, fossil fuel (e.g., coal, oil, gas) BLS benchmark).

Source U.S. Department of Labor, OSHA Injury Tracking Application (Form 300A) As of 2026-08-25

Genera Mayaguez TCR series: 2023=0 · 2024=0 · BLS 1.2

Where Genera Mayaguez falls in its industry

846 Electric power generation, fos establishments

Safer than 100% of graded establishments in this industry, whose median TCR is 1.5.

More dangerous than peersSafer than peers

Narrower to Puerto Rico alone (the establishments it most directly competes with for workers and contracts): ranked #0 safest of 4 Electric power generation, fos employers in Puerto Rico.

Genera Mayaguez (21 employees, TCR 0.0) among 29 same-industry peers, split at the industry median of 59 employees and a TCR of 1.5 2×2 strategic matrix plotting 30 entities by Average employees (X) and Total Case Rate (Y), with a crosshair dividing the plot into four quadrants. Larger & higher-riskSmaller & higher-riskLarger & saferSmaller & safer than peers 0200400600800 051015 Average employees Total Case Rate Genera Mayaguez
Genera Mayaguez (21 employees, TCR 0.0) among 29 same-industry peers, split at the industry median of 59 employees and a TCR of 1.5

Genera Mayaguez has fewer employees than the Electric power generation, fossil fuel ( median and a lower injury rate than the industry's median TCR of 1.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.

Year-by-Year Safety Data

Year TCR DART Injuries Illnesses Fatalities
2024 0.0 0.0 0 0 0
2023 0.0 0.0 0 0 0

OSHA ITA peer cross-reference

Establishment peer ledger

221112 · PR · San Juan

846 Electric power generation, fossil fuel (e.g., coal, oil, gas) employers nationwide with a credible TCR · 1,632 rated employers in Puerto Rico with headcount on file · 262 employers in San Juan, PR · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.

Rel Establishment Metric
NAICS-TCR 00525 NORTH TEMPLE OFFICE 0.0 TCR
NAICS-TCR Calpine Energy Solutions 0.1 TCR
NAICS-TCR Roxboro Fossil and CT Plants 0.1 TCR
NAICS-TCR Arena Building 0.1 TCR
STATE-SIZE LUMA, Bayamon 21 FTE
STATE-SIZE PROYECTO CIUDADELA III 21 FTE
STATE-SIZE 35-LA CEIBA 21 FTE
STATE-SIZE 19-BRISAS DE BAYAMON 21 FTE
CITY-NEAR Policia de Puerto Rico 13,672 FTE
CITY-NEAR Autoridad de Energia Electrica 5,784 FTE
CITY-NEAR Tribunal de Justicia 5,096 FTE
CITY-NEAR Autoridad de Acueductos y Alcantarillados de Puerto Rico 4,195 FTE
NAT-TCR Gaapr - Ups Supply Chain Solutions 0.0 TCR
NAT-TCR Other Location 0.0 TCR
NAT-TCR Putzel Electrical Contractors, Inc. 0.0 TCR
NAT-TCR TXC101551 0.0 TCR
NAT-SIZE 09 Grand Island 21 FTE
NAT-SIZE Greene Construction 21 FTE
NAT-SIZE Woodbury Supply Company Inc - Dayville 21 FTE
NAT-SIZE Pickers 1 LLC 21 FTE

Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →

Data Source: OSHA Injury Tracking Application (ITA), mandatory establishment-level injury/illness reports. Grades compare employer Total Case Rate (TCR) to BLS IIF industry benchmarks. Data covers years reported by this establishment: 2024, 2023. This is publicly available government data - not a legal determination of workplace conditions.
Data sourced from official public datasets. See our methodology for details.