Retaining wall (except anchored earth), poured concrete, construction · California
Guy Yocom Construction, Inc.
Norco, CA · ~1,172 workers · 6 years of OSHA Injury Tracking Application data.
- C
- Average Safety Record
- 3.1
- Avg TCR
- 2.8
- Industry avg
- 0
- Fatalities
The verdict
Guy Yocom Construction, Inc. runs at 109% of its industry's injury rate - about level with the typical Retaining wall (except anchored earth), poured concrete, construction workplace, earning a grade C.
Guy Yocom Construction, Inc.: 3.1 TCR = 109% of Retaining wall (except anchored earth), poured concrete, construction BLS 2.8 · 6y Form 300A (see methodology below)
Guy Yocom Construction, Inc. safety composite
Guy Yocom Construction, Inc. scores strongest on dart rate (safer than 60% of same-industry peers) and weakest on fatalities (safer than 51%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
57/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- C 3.06 per 100 workers
Safer than 59% of industry peers
- DART rate
- C 0.6 per 100 workers
Safer than 60% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
TCR Δ
−3.7
2017→2024
Guy Yocom Construction, Inc. injury rate improved
Guy Yocom Construction, Inc.'s TCR fell 3.7 from 5.7 in 2017 to 2.0 in 2024. Peak filing year was 2017 at 5.7 TCR. In 2024, DART was 0.2× this establishment's average TCR (severity share of cases).
2017=5.7 · 2018=2.6 · 2019=3.2 · 2020=2.7 · 2023=2.2 · 2024=2.0
OSHA ITA Form 300A scorecard
Establishment book 238110 · Norco, CA ABOVE-IND · LARGE
Grade C · TCR 3.1 · 109% of ind
- DART 0.6 DART
- RANK #59/166
- PHOTO Titan Structural, Inc.
- BOOK 6y book
- INJ 133 inj
- SIZE ~1,172 FTE
Nearest TCR peer: Titan Structural, Inc. (0.0 TCR gap)
Read with this employer → · Industry book → · California employers → · Look up another →
Guy Yocom Construction, Inc. in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Guy Yocom Construction, Inc.
3.1 TCR
- Titan Structur
Titan Structural, Inc.
3.1 TCR
- Tapio Construc
Tapio Construction
3.1 TCR
- Berkel Piling
Berkel Piling Washington DC
3 TCR
- Tar Heel Winst
Tar Heel Winston
3 TCR
What this shows Guy Yocom Construction, Inc. averages 3.1 TCR (109% of the Retaining wall (except anchored earth), poured concrete, construction BLS benchmark).
Guy Yocom Construction, Inc. TCR series: 2017=5.7 · 2018=2.6 · 2019=3.2 · 2020=2.7 · 2023=2.2 · 2024=2 · BLS 2.8
Where Guy Yocom Construction, Inc. falls in its industry
1,314 Retaining wall (except anchore establishmentsSafer than 59% of graded establishments in this industry, whose median TCR is 3.8.
Narrower to California alone (the establishments it most directly competes with for workers and contracts): ranked #59 safest of 166 Retaining wall (except anchore employers in California.
Guy Yocom Construction, Inc. has more employees than the Retaining wall (except anchored earth), median and a lower injury rate than the industry's median TCR of 3.8. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 2.0 | 0.6 | 20 | 0 | 0 |
| 2023 | 2.2 | 0.7 | 22 | 0 | 0 |
| 2020 | 2.7 | 1.5 | 22 | 1 | 0 |
| 2019 | 3.2 | 2.6 | 23 | 0 | 0 |
| 2018 | 2.6 | 2.1 | 22 | 0 | 0 |
| 2017 | 5.7 | 3.7 | 24 | 1 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
238110 · CA · Norco
1,314 Retaining wall (except anchored earth), poured concrete, construction employers nationwide with a credible TCR · 51,834 rated employers in California with headcount on file · 46 employers in Norco, CA · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Titan Structural, Inc. | 3.1 TCR |
| NAICS-TCR | Tapio Construction | 3.1 TCR |
| NAICS-TCR | Berkel Piling Washington DC | 3.0 TCR |
| NAICS-TCR | Tar Heel Winston | 3.0 TCR |
| STATE-SIZE | Parker Hannifin Corporation - 1144 | 1,172 FTE |
| STATE-SIZE | CASDI - SAN DIEGO HUB | 1,172 FTE |
| STATE-SIZE | 245 MARKET STREET OFFICES | 1,171 FTE |
| STATE-SIZE | California Department of Transportation Facility 345 | 1,171 FTE |
| CITY-NEAR | California Rehabilitation Center | 1,174 FTE |
| CITY-NEAR | Ono-034 | 909 FTE |
| CITY-NEAR | Better Nutritional Norco Campus | 615 FTE |
| CITY-NEAR | BALBOA MANAGEMENT GROUP, LLC | 271 FTE |
| NAT-TCR | Nations Cabinetry | 3.1 TCR |
| NAT-TCR | Capt. Nathan Hale Middle School | 3.1 TCR |
| NAT-TCR | Holiday Inn Express New Martinsville WV | 3.1 TCR |
| NAT-TCR | York County Government | 3.1 TCR |
| NAT-SIZE | Perry Plant | 1,172 FTE |
| NAT-SIZE | St. Paul Midway YMCA | 1,172 FTE |
| NAT-SIZE | Delta Air Lines - MS3 | 1,172 FTE |
| NAT-SIZE | Rose Medical Center | 1,172 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.