Electric power generation, fossil fuel (e.g., coal, oil, gas) · Arkansas
Little Rock Campus (Headquarters)
Little Rock, AR · ~233 workers · 8 years of OSHA Injury Tracking Application data.
- B
- Good Safety Record
- 0.6
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Little Rock Campus (Headquarters) runs at 53% of its industry's injury rate - safer than the typical Electric power generation, fossil fuel (e.g., coal, oil, gas) workplace, earning a grade B.
Little Rock Campus (Headquarters): 0.6 TCR = 53% of Electric power generation, fossil fuel (e.g., coal, oil, gas) BLS 1.2 · 8y Form 300A (see methodology below)
Little Rock Campus (Headquarters) safety composite
Little Rock Campus (Headquarters) scores strongest on total case rate (tcr) (safer than 82% of same-industry peers) and weakest on dart rate (safer than 39%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
59/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- B 0.64 per 100 workers
Safer than 82% of industry peers
- DART rate
- D 0.42 per 100 workers
Safer than 39% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Little Rock Campus (Headquarters) held a steady TCR band
Little Rock Campus (Headquarters)'s TCR held near 0.1 from 0.5 in 2017 to 0.4 in 2024. Peak filing year was 2022 at 1.3 TCR. In 2024, DART was 0.66× this establishment's average TCR (severity share of cases).
2017=0.5 · 2018=1.0 · 2019=0.5 · 2020=0.9 · 2021=0.5 · 2022=1.3 · 2023=0.0 · 2024=0.4
OSHA ITA Form 300A scorecard
Establishment book 221112 · Little Rock, AR AT/BELOW-IND · MID
Grade B · TCR 0.6 · 53% of ind
- DART 0.4 DART
- RANK #3/11
- PHOTO Rowan
- BOOK 8y book
- INJ 10 inj
- SIZE ~233 FTE
Nearest TCR peer: Rowan (0.0 TCR gap)
Read with this employer → · Industry book → · Arkansas employers → · Look up another →
Little Rock Campus (Headquarters) in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- Neal Energy Ce
Neal Energy Center
0.7 TCR
- East Bend Gene
East Bend Generating Station
0.7 TCR
- This site
Little Rock Campus (Headquarters)
0.6 TCR
- Rowan
Rowan
0.6 TCR
- JH Campbell An
JH Campbell Annex
0.6 TCR
What this shows Little Rock Campus (Headquarters) averages 0.6 TCR (53% of the Electric power generation, fossil fuel (e.g., coal, oil, gas) BLS benchmark).
Little Rock Campus (Headquarters) TCR series: 2017=0.5 · 2018=1 · 2019=0.5 · 2020=0.9 · 2021=0.5 · 2022=1.3 · 2023=0 · 2024=0.4 · BLS 1.2
Where Little Rock Campus (Headquarters) falls in its industry
846 Electric power generation, fos establishmentsSafer than 82% of graded establishments in this industry, whose median TCR is 1.5.
Narrower to Arkansas alone (the establishments it most directly competes with for workers and contracts): ranked #3 safest of 11 Electric power generation, fos employers in Arkansas.
Little Rock Campus (Headquarters) has more employees than the Electric power generation, fossil fuel ( median and a lower injury rate than the industry's median TCR of 1.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 0.4 | 0.4 | 1 | 0 | 0 |
| 2023 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2022 | 1.3 | 0.7 | 2 | 0 | 0 |
| 2021 | 0.5 | 0.0 | 1 | 0 | 0 |
| 2020 | 0.9 | 0.4 | 2 | 0 | 0 |
| 2019 | 0.5 | 0.5 | 1 | 0 | 0 |
| 2018 | 1.0 | 0.5 | 2 | 0 | 0 |
| 2017 | 0.5 | 0.5 | 1 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221112 · AR · Little Rock
846 Electric power generation, fossil fuel (e.g., coal, oil, gas) employers nationwide with a credible TCR · 4,393 rated employers in Arkansas with headcount on file · 446 employers in Little Rock, AR · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Rowan | 0.6 TCR |
| NAICS-TCR | Neal Energy Center | 0.7 TCR |
| NAICS-TCR | East Bend Generating Station | 0.7 TCR |
| NAICS-TCR | JH Campbell Annex | 0.6 TCR |
| STATE-SIZE | Anthony Timberlands - Bearden | 233 FTE |
| STATE-SIZE | NIBCO Blytheville | 233 FTE |
| STATE-SIZE | INDUSTRIAL IRON WORKS, INC., dba ADAMS FERTILIZER EQUIPMENT | 233 FTE |
| STATE-SIZE | 6051 | 233 FTE |
| CITY-NEAR | Arkansas Children's Hospital | 3,946 FTE |
| CITY-NEAR | LITCX0UPS LIT - UPS | 3,415 FTE |
| CITY-NEAR | Amazon.com Services LLC - LIT1 | 2,510 FTE |
| CITY-NEAR | Baptist Health Medical Center - Little Rock | 2,500 FTE |
| NAT-TCR | Elemental Scientific, Inc. | 0.6 TCR |
| NAT-TCR | Lindenmeyr Latham | 0.6 TCR |
| NAT-TCR | TAMP1-DWH-TAMPA | 0.6 TCR |
| NAT-TCR | Danisco Cedar Rapids | 0.6 TCR |
| NAT-SIZE | Main Office | 233 FTE |
| NAT-SIZE | RTTNA - All Locations Combined | 233 FTE |
| NAT-SIZE | US Gypsum Shoals | 233 FTE |
| NAT-SIZE | Alameda County Industries | 233 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.