Fiber optic cable transmission line construction · North Carolina

Master Telecommunications

Monroe, NC · ~53 workers · 2 years of OSHA Injury Tracking Application data.

C
Average Safety Record
0.0
Avg TCR
2.8
Industry avg
0
Fatalities
Subscribe to safety-record updates (RSS)

The verdict

Master Telecommunications runs at 0% of its industry's injury rate - about level with the typical Fiber optic cable transmission line construction workplace, earning a grade C.

Master Telecommunications: 0.0 TCR = 0% of Fiber optic cable transmission line construction BLS 2.8 · 2y Form 300A (see methodology below)

Master Telecommunications safety composite

Master Telecommunications scores strongest on total case rate (tcr) (safer than 100% of same-industry peers) and weakest on fatalities (safer than 52%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).

B

80/100

Percentile-weighted across 3 of 3 measures

Total Case Rate (TCR)
A 0 per 100 workers

Safer than 100% of industry peers

DART rate
B 0 per 100 workers

Safer than 78% of industry peers

Fatalities
D 0

Safer than 52% of industry peers

Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).

Master Telecommunications held a steady TCR band

Master Telecommunications's TCR held near 0.0 from 0.0 in 2023 to 0.0 in 2024. Peak filing year was 2023 at 0.0 TCR.

2023=0.0 · 2024=0.0

OSHA ITA Form 300A scorecard

Establishment book 237130 · Monroe, NC AT/BELOW-IND · SMALL

Grade C · TCR 0.0 · 0% of ind

  • DART 0.0 DART
  • RANK #0/79
  • PHOTO 15-100 IN
  • BOOK 2y book
  • INJ 0 inj
  • SIZE ~53 FTE

Nearest TCR peer: 15-100 IN (0.0 TCR gap)

Read with this employer → · Industry book → · North Carolina employers → · Look up another →

Master Telecommunications in the TCR neighbourhood

Average Total Case Rate among this establishment and nearest same-industry peers

TCR

What this shows Master Telecommunications averages 0.0 TCR (0% of the Fiber optic cable transmission line construction BLS benchmark).

Source U.S. Department of Labor, OSHA Injury Tracking Application (Form 300A) As of 2026-08-25

Master Telecommunications TCR series: 2023=0 · 2024=0 · BLS 2.8

Where Master Telecommunications falls in its industry

1,605 Fiber optic cable transmission establishments

Safer than 100% of graded establishments in this industry, whose median TCR is 2.0.

More dangerous than peersSafer than peers

Narrower to North Carolina alone (the establishments it most directly competes with for workers and contracts): ranked #0 safest of 79 Fiber optic cable transmission employers in North Carolina.

Master Telecommunications (53 employees, TCR 0.0) among 29 same-industry peers, split at the industry median of 74 employees and a TCR of 2.0 2×2 strategic matrix plotting 30 entities by Average employees (X) and Total Case Rate (Y), with a crosshair dividing the plot into four quadrants. Larger & higher-riskSmaller & higher-riskLarger & saferSmaller & safer than peers 0100200300400500 05101520 Average employees Total Case Rate Master Telecommunications
Master Telecommunications (53 employees, TCR 0.0) among 29 same-industry peers, split at the industry median of 74 employees and a TCR of 2.0

Master Telecommunications has fewer employees than the Fiber optic cable transmission line cons median and a lower injury rate than the industry's median TCR of 2.0. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.

Year-by-Year Safety Data

Year TCR DART Injuries Illnesses Fatalities
2024 0.0 0.0 0 0 0
2023 0.0 0.0 0 0 0

OSHA ITA peer cross-reference

Establishment peer ledger

237130 · NC · Monroe

1,605 Fiber optic cable transmission line construction employers nationwide with a credible TCR · 16,981 rated employers in North Carolina with headcount on file · 163 employers in Monroe, NC · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.

Rel Establishment Metric
NAICS-TCR 15-100 IN 0.0 TCR
NAICS-TCR Hanwha Q Cells USA Corp. 0.0 TCR
NAICS-TCR 105185 - IPP Repowering- 840MW 2x2x1 CC 0.1 TCR
NAICS-TCR 103171 - Huntington Beach Energy Project 0.1 TCR
STATE-SIZE Sanderson Farms St. Pauls Hatchery 53 FTE
STATE-SIZE CPI USA NC LLC - Southport 53 FTE
STATE-SIZE Goldsboro Resource Center - PNG 53 FTE
STATE-SIZE Jackson Electrical Contractors Inc 53 FTE
CITY-NEAR Monroe Plant 1,584 FTE
CITY-NEAR 0060-CHS Union 1,214 FTE
CITY-NEAR 0060-Atrium Health Union 1,147 FTE
CITY-NEAR 1108-Atrium Health Union (1108) 1,041 FTE
NAT-TCR Other Location 0.0 TCR
NAT-TCR Putzel Electrical Contractors, Inc. 0.0 TCR
NAT-TCR Gaapr - Ups Supply Chain Solutions 0.0 TCR
NAT-TCR TXC101551 0.0 TCR
NAT-SIZE Aerobotix, Inc. 53 FTE
NAT-SIZE Loven Contracting Inc 53 FTE
NAT-SIZE Dedicated Duncan 53 FTE
NAT-SIZE Lincoln Park 10101 53 FTE

Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →

Data Source: OSHA Injury Tracking Application (ITA), mandatory establishment-level injury/illness reports. Grades compare employer Total Case Rate (TCR) to BLS IIF industry benchmarks. Data covers years reported by this establishment: 2024, 2023. This is publicly available government data - not a legal determination of workplace conditions.
Data sourced from official public datasets. See our methodology for details.