Nuclear Electric Power Generation · Minnesota
Monticello Nuclear Plant-LJ
Monticello, MN · ~403 workers · 3 years of OSHA Injury Tracking Application data.
- F
- Failing Safety Record
- 3.3
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Monticello Nuclear Plant-LJ runs at 274% of its industry's injury rate - far more dangerous than the typical Nuclear Electric Power Generation workplace, earning a grade F.
Monticello Nuclear Plant-LJ: 3.3 TCR = 274% of Nuclear Electric Power Generation BLS 1.2 · 3y Form 300A (see methodology below)
Monticello Nuclear Plant-LJ safety composite
Monticello Nuclear Plant-LJ scores strongest on fatalities (safer than 50% of same-industry peers) and weakest on total case rate (tcr) (safer than 1%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
13/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- F 3.29 per 100 workers
Safer than 1% of industry peers
- DART rate
- F 3.18 per 100 workers
Safer than 1% of industry peers
- Fatalities
- D 0
Safer than 50% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Rising injury rate
Monticello Nuclear Plant-LJ: 3.0 → 3.5 TCR
Peak year 2022 @ 3.5 TCR · DART/TCR 0.97× in 2023
Monticello Nuclear Plant-LJ's TCR rose 0.5 from 3.0 in 2021 to 3.5 in 2023. Peak filing year was 2022 at 3.5 TCR. In 2023, DART was 0.97× this establishment's average TCR (severity share of cases).
OSHA ITA Form 300A scorecard
Establishment book 221113 · Monticello, MN ABOVE-IND · MID
Grade F · TCR 3.3 · 274% of ind
- DART 3.2 DART
- RANK #6/6
- PHOTO Prairie Is Nuclear P…
- BOOK 3y book
- INJ 7 inj
- SIZE ~403 FTE
Nearest TCR peer: Prairie Is Nuclear Plant-HD (0.7 TCR gap)
Read with this employer → · Industry book → · Minnesota employers → · Look up another →
Monticello Nuclear Plant-LJ in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Monticello Nuclear Plant-LJ
3.3 TCR
- Prairie Is Nuc
Prairie Is Nuclear Plant-HD
2.6 TCR
- Monticello Tra
Monticello Training Ctr-LL
2.5 TCR
- 8FB - Nuclear
8FB - Nuclear - Radiation Protection
2.4 TCR
- Cook Nuclear
Cook Nuclear
2 TCR
What this shows Monticello Nuclear Plant-LJ averages 3.3 TCR (274% of the Nuclear Electric Power Generation BLS benchmark).
Monticello Nuclear Plant-LJ TCR series: 2021=3 · 2022=3.5 · 2023=3.5 · BLS 1.2
Where Monticello Nuclear Plant-LJ falls in its industry
80 Nuclear Electric Power Generat establishmentsSafer than 1% of graded establishments in this industry, whose median TCR is 0.2.
Narrower to Minnesota alone (the establishments it most directly competes with for workers and contracts): ranked #6 safest of 6 Nuclear Electric Power Generat employers in Minnesota.
Monticello Nuclear Plant-LJ has fewer employees than the Nuclear Electric Power Generation median and a higher injury rate than the industry's median TCR of 0.2. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2023 | 3.5 | 3.2 | 2 | 11 | 0 |
| 2022 | 3.5 | 3.2 | 2 | 11 | 0 |
| 2021 | 3.0 | 2.5 | 3 | 9 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221113 · MN · Monticello
80 Nuclear Electric Power Generation employers nationwide with a credible TCR · 15,828 rated employers in Minnesota with headcount on file · 70 employers in Monticello, MN · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Prairie Is Nuclear Plant-HD | 2.6 TCR |
| NAICS-TCR | Monticello Training Ctr-LL | 2.5 TCR |
| NAICS-TCR | 8FB - Nuclear - Radiation Protection | 2.4 TCR |
| NAICS-TCR | Cook Nuclear | 2.0 TCR |
| STATE-SIZE | Seneca Foods Corporation | 403 FTE |
| STATE-SIZE | BMIN | 403 FTE |
| STATE-SIZE | Tech Park | 403 FTE |
| STATE-SIZE | WM 2882 | 403 FTE |
| CITY-NEAR | Dist Office | 599 FTE |
| CITY-NEAR | Monticello High School | 588 FTE |
| CITY-NEAR | CCH Monticello | 571 FTE |
| CITY-NEAR | CentraCare Monticello | 487 FTE |
| NAT-TCR | The Blake at Colonial Club | 3.3 TCR |
| NAT-TCR | HMA Paving Lewisburg | 3.3 TCR |
| NAT-TCR | Crozet Elementary School | 3.3 TCR |
| NAT-TCR | Sonesta ES Suites Charlotte | 3.3 TCR |
| NAT-SIZE | CIC Construction Group, S.E. | 403 FTE |
| NAT-SIZE | Well-Spring Retirement Community | 403 FTE |
| NAT-SIZE | Federal Mogul Powertrain | 403 FTE |
| NAT-SIZE | Sonny's Enterprises, LLC | 403 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.