Distribution of electric power · South Carolina
Operations Support Center (Columbia)
Cayce, SC · ~240 workers · 8 years of OSHA Injury Tracking Application data.
- A
- Excellent Safety Record
- 0.1
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Operations Support Center (Columbia) runs at 10% of its industry's injury rate - far safer than the typical Distribution of electric power workplace, earning a grade A.
Operations Support Center (Columbia): 0.1 TCR = 10% of Distribution of electric power BLS 1.2 · 8y Form 300A (see methodology below)
Operations Support Center (Columbia) safety composite
Operations Support Center (Columbia) scores strongest on total case rate (tcr) (safer than 99% of same-industry peers) and weakest on fatalities (safer than 51%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
80/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- A 0.12 per 100 workers
Safer than 99% of industry peers
- DART rate
- B 0 per 100 workers
Safer than 79% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
TCR Δ
−0.5
2017→2024
Operations Support Center (Columbia) injury rate improved
Operations Support Center (Columbia)'s TCR fell 0.5 from 0.5 in 2017 to 0.0 in 2024. Peak filing year was 2018 at 0.5 TCR. In 2024, DART was 0× this establishment's average TCR (severity share of cases).
2017=0.5 · 2018=0.5 · 2019=0.0 · 2020=0.0 · 2021=0.0 · 2022=0.0 · 2023=0.0 · 2024=0.0
OSHA ITA Form 300A scorecard
Establishment book 221122 · Cayce, SC AT/BELOW-IND · MID
Grade A · TCR 0.1 · 10% of ind
- DART 0.0 DART
- RANK #1/86
- PHOTO SYRACUSE-NY79
- BOOK 8y book
- INJ 2 inj
- SIZE ~240 FTE
Nearest TCR peer: SYRACUSE-NY79 (0.0 TCR gap)
Read with this employer → · Industry book → · South Carolina employers → · Look up another →
Operations Support Center (Columbia) in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site 0.1
Operations Support Center (Columbia)
0.1 TCR
- SYRACUSE-NY79 0.1
SYRACUSE-NY79
0.1 TCR
- Seven Springs 0.1
Seven Springs Complex
0.1 TCR
- AEP Headquarte 0.1
AEP Headquarters
0.1 TCR
- Gas GC Yard 0.1
Gas GC Yard
0.1 TCR
What this shows Operations Support Center (Columbia) averages 0.1 TCR (10% of the Distribution of electric power BLS benchmark).
Operations Support Center (Columbia) TCR series: 2017=0.5 · 2018=0.5 · 2019=0 · 2020=0 · 2021=0 · 2022=0 · 2023=0 · 2024=0 · BLS 1.2
Where Operations Support Center (Columbia) falls in its industry
2,958 Distribution of electric power establishmentsSafer than 99% of graded establishments in this industry, whose median TCR is 2.5.
Narrower to South Carolina alone (the establishments it most directly competes with for workers and contracts): ranked #1 safest of 86 Distribution of electric power employers in South Carolina.
Operations Support Center (Columbia) has more employees than the Distribution of electric power median and a lower injury rate than the industry's median TCR of 2.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2023 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2022 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2021 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2020 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2019 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2018 | 0.5 | 0.0 | 1 | 0 | 0 |
| 2017 | 0.5 | 0.5 | 1 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221122 · SC · Cayce
2,958 Distribution of electric power employers nationwide with a credible TCR · 7,610 rated employers in South Carolina with headcount on file · 46 employers in Cayce, SC · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | SYRACUSE-NY79 | 0.1 TCR |
| NAICS-TCR | Seven Springs Complex | 0.1 TCR |
| NAICS-TCR | AEP Headquarters | 0.1 TCR |
| NAICS-TCR | Gas GC Yard | 0.1 TCR |
| STATE-SIZE | Anderson IES | 240 FTE |
| STATE-SIZE | Supply Chain Greenville SC | 240 FTE |
| STATE-SIZE | Danfoss Easley | 239 FTE |
| STATE-SIZE | Conbraco Industries - ByPass | 239 FTE |
| CITY-NEAR | HISTORIC COLUMBIA SPEEDWAY | 863 FTE |
| CITY-NEAR | Corporate Headquarters | 606 FTE |
| CITY-NEAR | CMC Steel South Carolina | 418 FTE |
| CITY-NEAR | OPERATIONS SUPPORT CENTER | 293 FTE |
| NAT-TCR | MN Office | 0.1 TCR |
| NAT-TCR | Twccor-Twc-Twc Corporate Office | 0.1 TCR |
| NAT-TCR | Westlake Longview Corporation | 0.1 TCR |
| NAT-TCR | HRV Conformance Verification Associates, Inc. | 0.1 TCR |
| NAT-SIZE | S02878 - WM of San Antonio | 240 FTE |
| NAT-SIZE | ITS | 240 FTE |
| NAT-SIZE | Barron Center | 240 FTE |
| NAT-SIZE | JLG - Weber | 240 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.