Electric power transmission line and tower construction · North Carolina
Pike Telecom and Renewables Florida Statewide Operations
Mount Airy, NC · ~34 workers · 4 years of OSHA Injury Tracking Application data.
- A
- Excellent Safety Record
- 1.0
- Avg TCR
- 2.8
- Industry avg
- 0
- Fatalities
The verdict
Pike Telecom and Renewables Florida Statewide Operations runs at 34% of its industry's injury rate - far safer than the typical Electric power transmission line and tower construction workplace, earning a grade A.
Pike Telecom and Renewables Florida Statewide Operations: 1.0 TCR = 34% of Electric power transmission line and tower construction BLS 2.8 · 4y Form 300A (see methodology below)
Pike Telecom and Renewables Florida Statewide Operations safety composite
Pike Telecom and Renewables Florida Statewide Operations scores strongest on total case rate (tcr) (safer than 75% of same-industry peers) and weakest on dart rate (safer than 31%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
54/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- B 0.96 per 100 workers
Safer than 75% of industry peers
- DART rate
- F 1.78 per 100 workers
Safer than 31% of industry peers
- Fatalities
- D 0
Safer than 52% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Rising injury rate
Pike Telecom and Renewables Florida Statewide Operations: 0.0 → 1.8 TCR
Peak year 2023 @ 2.1 TCR · DART/TCR 1.85× in 2024
Pike Telecom and Renewables Florida Statewide Operations's TCR rose 1.8 from 0.0 in 2020 to 1.8 in 2024. Peak filing year was 2023 at 2.1 TCR. In 2024, DART was 1.85× this establishment's average TCR (severity share of cases).
OSHA ITA Form 300A scorecard
Establishment book 237130 · Mount Airy, NC AT/BELOW-IND · SMALL
Grade A · TCR 1.0 · 34% of ind
- DART 1.8 DART
- RANK #17/79
- PHOTO CCI Systems
- BOOK 4y book
- INJ 2 inj
- SIZE ~34 FTE
Nearest TCR peer: CCI Systems (0.0 TCR gap)
Read with this employer → · Industry book → · North Carolina employers → · Look up another →
Pike Telecom and Renewables Florida Statewide Operations in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Pike Telecom and Renewables Florida Statewide Operations
1 TCR
- CCI Systems
CCI Systems
1 TCR
- Hot Line Const
Hot Line Construction Corona
1 TCR
- Overland Contr
Overland Contracting Inc - PJFTLAUDE2
1 TCR
- South Carolina
South Carolina Tel-Con Inc.
1 TCR
What this shows Pike Telecom and Renewables Florida Statewide Operations averages 1.0 TCR (34% of the Electric power transmission line and tower construction BLS benchmark).
Pike Telecom and Renewables Florida Statewide Operations TCR series: 2020=0 · 2022=0 · 2023=2.1 · 2024=1.8 · BLS 2.8
Where Pike Telecom and Renewables Florida Statewide Operations falls in its industry
1,605 Electric power transmission li establishmentsSafer than 75% of graded establishments in this industry, whose median TCR is 2.0.
Narrower to North Carolina alone (the establishments it most directly competes with for workers and contracts): ranked #17 safest of 79 Electric power transmission li employers in North Carolina.
Pike Telecom and Renewables Florida Statewide Operations has fewer employees than the Electric power transmission line and tow median and a lower injury rate than the industry's median TCR of 2.0. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 1.8 | 1.8 | 1 | 0 | 0 |
| 2023 | 2.1 | 2.1 | 1 | 0 | 0 |
| 2022 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2020 | 0.0 | 0.0 | 0 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
237130 · NC · Mount Airy
1,605 Electric power transmission line and tower construction employers nationwide with a credible TCR · 16,981 rated employers in North Carolina with headcount on file · 94 employers in Mount Airy, NC · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | CCI Systems | 1.0 TCR |
| NAICS-TCR | Hot Line Construction Corona | 1.0 TCR |
| NAICS-TCR | Overland Contracting Inc - PJFTLAUDE2 | 1.0 TCR |
| NAICS-TCR | South Carolina Tel-Con Inc. | 1.0 TCR |
| STATE-SIZE | Jerry G. Williams & Sons, Inc. | 34 FTE |
| STATE-SIZE | 2778 NC 50 South, Benson, NC 27504 | 34 FTE |
| STATE-SIZE | Frontier Natural Gas | 34 FTE |
| STATE-SIZE | Iredell Operations Center | 34 FTE |
| CITY-NEAR | Pike Florida Statewide Operations | 1,583 FTE |
| CITY-NEAR | Pike North Carolina Statewide Operations | 1,161 FTE |
| CITY-NEAR | Pike Georgia Statewide Operations | 969 FTE |
| CITY-NEAR | Pike Texas Statewide Operations | 738 FTE |
| NAT-TCR | Gardner Emmaus - CVIP | 1.0 TCR |
| NAT-TCR | Bayside | 1.0 TCR |
| NAT-TCR | M-Communication LLC | 1.0 TCR |
| NAT-TCR | 456-NiSource-Marion Oh-Mod Site | 1.0 TCR |
| NAT-SIZE | 014-Jal Nm | 34 FTE |
| NAT-SIZE | 025-Del Norte | 34 FTE |
| NAT-SIZE | 20222 - Kodiak | 34 FTE |
| NAT-SIZE | PMH Specialty Clinic | 34 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →