Electric power transmission line and tower construction · North Carolina
Pike Telecom and Renewables Tennessee Statewide Operations
Mount Airy, NC · ~21 workers · 3 years of OSHA Injury Tracking Application data.
- D
- Poor Safety Record
- 5.6
- Avg TCR
- 2.8
- Industry avg
- 0
- Fatalities
The verdict
Pike Telecom and Renewables Tennessee Statewide Operations runs at 200% of its industry's injury rate - more dangerous than the typical Electric power transmission line and tower construction workplace, earning a grade D.
Pike Telecom and Renewables Tennessee Statewide Operations: 5.6 TCR = 200% of Electric power transmission line and tower construction BLS 2.8 · 3y Form 300A (see methodology below)
Pike Telecom and Renewables Tennessee Statewide Operations safety composite
Pike Telecom and Renewables Tennessee Statewide Operations scores strongest on dart rate (safer than 78% of same-industry peers) and weakest on total case rate (tcr) (safer than 17%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
47/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- F 5.6 per 100 workers
Safer than 17% of industry peers
- DART rate
- B 0 per 100 workers
Safer than 78% of industry peers
- Fatalities
- D 0
Safer than 52% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Rising injury rate
Pike Telecom and Renewables Tennessee Statewide Operations: 4.3 → 12.5 TCR
Peak year 2024 @ 12.5 TCR · DART/TCR 0× in 2024
Pike Telecom and Renewables Tennessee Statewide Operations's TCR rose 8.3 from 4.3 in 2022 to 12.5 in 2024. In 2024, DART was 0× this establishment's average TCR (severity share of cases).
OSHA ITA Form 300A scorecard
Establishment book 237130 · Mount Airy, NC ABOVE-IND · SMALL
Grade D · TCR 5.6 · 200% of ind
- DART 0.0 DART
- RANK #71/79
- PHOTO Custom Utilicom, Inc.
- BOOK 3y book
- INJ 2 inj
- SIZE ~21 FTE
Nearest TCR peer: Custom Utilicom, Inc. (0.0 TCR gap)
Read with this employer → · Industry book → · North Carolina employers → · Look up another →
Pike Telecom and Renewables Tennessee Statewide Operations in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Pike Telecom and Renewables Tennessee Statewide Operations
5.6 TCR
- Custom Utilico
Custom Utilicom, Inc.
5.6 TCR
- HOT SPRINGS
HOT SPRINGS
5.6 TCR
- Tilson Technol
Tilson Technology Management, Inc., Bow, NH
5.6 TCR
- 322
322
5.6 TCR
What this shows Pike Telecom and Renewables Tennessee Statewide Operations averages 5.6 TCR (200% of the Electric power transmission line and tower construction BLS benchmark).
Pike Telecom and Renewables Tennessee Statewide Operations TCR series: 2022=4.3 · 2023=0 · 2024=12.5 · BLS 2.8
Where Pike Telecom and Renewables Tennessee Statewide Operations falls in its industry
1,605 Electric power transmission li establishmentsSafer than 17% of graded establishments in this industry, whose median TCR is 2.0.
Narrower to North Carolina alone (the establishments it most directly competes with for workers and contracts): ranked #71 safest of 79 Electric power transmission li employers in North Carolina.
Pike Telecom and Renewables Tennessee Statewide Operations has fewer employees than the Electric power transmission line and tow median and a higher injury rate than the industry's median TCR of 2.0. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 12.5 | 0.0 | 1 | 0 | 0 |
| 2023 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2022 | 4.3 | 4.3 | 1 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
237130 · NC · Mount Airy
1,605 Electric power transmission line and tower construction employers nationwide with a credible TCR · 16,981 rated employers in North Carolina with headcount on file · 94 employers in Mount Airy, NC · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Custom Utilicom, Inc. | 5.6 TCR |
| NAICS-TCR | HOT SPRINGS | 5.6 TCR |
| NAICS-TCR | Tilson Technology Management, Inc., Bow, NH | 5.6 TCR |
| NAICS-TCR | 322 | 5.6 TCR |
| STATE-SIZE | Timothy Yarbrough | 21 FTE |
| STATE-SIZE | Liberty NC Breeders | 21 FTE |
| STATE-SIZE | NCJA1-SEL-JASON 1' | 21 FTE |
| STATE-SIZE | Sunburst Trout Farms | 21 FTE |
| CITY-NEAR | Pike Florida Statewide Operations | 1,583 FTE |
| CITY-NEAR | Pike North Carolina Statewide Operations | 1,161 FTE |
| CITY-NEAR | Pike Georgia Statewide Operations | 969 FTE |
| CITY-NEAR | Pike Texas Statewide Operations | 738 FTE |
| NAT-TCR | Store 0645 | 5.6 TCR |
| NAT-TCR | Valassis Direct Mail, Inc. | 5.6 TCR |
| NAT-TCR | Rancho Markets#10 | 5.6 TCR |
| NAT-TCR | 1376 - Mobile West | 5.6 TCR |
| NAT-SIZE | Vecenergy_Port Everglades Terminal | 21 FTE |
| NAT-SIZE | S04003 - Pheasant Point Landfill | 21 FTE |
| NAT-SIZE | 103-WEIMER | 21 FTE |
| NAT-SIZE | S04008 - Twin Bridges LF | 21 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.