Fossil Fuel Electric Generation · Minnesota
Riverside Gen Plant-TK
Minneapolis, MN · ~26 workers · 3 years of OSHA Injury Tracking Application data.
- F
- Failing Safety Record
- 2.7
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Riverside Gen Plant-TK runs at 228% of its industry's injury rate - far more dangerous than the typical Fossil Fuel Electric Generation workplace, earning a grade F.
Riverside Gen Plant-TK: 2.7 TCR = 228% of Fossil Fuel Electric Generation BLS 1.2 · 3y Form 300A (see methodology below)
Riverside Gen Plant-TK safety composite
Riverside Gen Plant-TK scores strongest on dart rate (safer than 71% of same-industry peers) and weakest on total case rate (tcr) (safer than 24%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
47/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- F 2.74 per 100 workers
Safer than 24% of industry peers
- DART rate
- C 0 per 100 workers
Safer than 71% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Rising injury rate
Riverside Gen Plant-TK: 0.0 → 4.1 TCR
Peak year 2022 @ 4.1 TCR · DART/TCR 0× in 2023
Riverside Gen Plant-TK's TCR rose 4.1 from 0.0 in 2021 to 4.1 in 2023. Peak filing year was 2022 at 4.1 TCR. In 2023, DART was 0× this establishment's average TCR (severity share of cases).
OSHA ITA Form 300A scorecard
Establishment book 221112 · Minneapolis, MN ABOVE-IND · SMALL
Grade F · TCR 2.7 · 228% of ind
- DART 0.0 DART
- RANK #11/24
- PHOTO KCP&L - Johnson Coun…
- BOOK 3y book
- INJ 0 inj
- SIZE ~26 FTE
Nearest TCR peer: KCP&L - Johnson County Service Center (0.0 TCR gap)
Read with this employer → · Industry book → · Minnesota employers → · Look up another →
Riverside Gen Plant-TK in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- New Madrid Pow
New Madrid Power Plant
2.8 TCR
- This site
Riverside Gen Plant-TK
2.7 TCR
- KCP&L - Johnso
KCP&L - Johnson County Service Center
2.7 TCR
- Muscatine Powe
Muscatine Power & Water Power Plant
2.7 TCR
- Sherco Generat
Sherco Generating Plant
2.7 TCR
What this shows Riverside Gen Plant-TK averages 2.7 TCR (228% of the Fossil Fuel Electric Generation BLS benchmark).
Riverside Gen Plant-TK TCR series: 2021=0 · 2022=4.1 · 2023=4.1 · BLS 1.2
Where Riverside Gen Plant-TK falls in its industry
846 Fossil Fuel Electric Generatio establishmentsSafer than 24% of graded establishments in this industry, whose median TCR is 1.5.
Narrower to Minnesota alone (the establishments it most directly competes with for workers and contracts): ranked #11 safest of 24 Fossil Fuel Electric Generatio employers in Minnesota.
Riverside Gen Plant-TK has fewer employees than the Fossil Fuel Electric Generation median and a higher injury rate than the industry's median TCR of 1.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2023 | 4.1 | 0.0 | 0 | 1 | 0 |
| 2022 | 4.1 | 0.0 | 0 | 1 | 0 |
| 2021 | 0.0 | 0.0 | 0 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221112 · MN · Minneapolis
846 Fossil Fuel Electric Generation employers nationwide with a credible TCR · 15,828 rated employers in Minnesota with headcount on file · 1,321 employers in Minneapolis, MN · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | KCP&L - Johnson County Service Center | 2.7 TCR |
| NAICS-TCR | New Madrid Power Plant | 2.8 TCR |
| NAICS-TCR | Muscatine Power & Water Power Plant | 2.7 TCR |
| NAICS-TCR | Sherco Generating Plant | 2.7 TCR |
| STATE-SIZE | Becker | 26 FTE |
| STATE-SIZE | Silverstreak Dairy LLC, Silverstreak Dairy | 26 FTE |
| STATE-SIZE | Schwartz Farms Huiras MN | 26 FTE |
| STATE-SIZE | Golden Egg | 26 FTE |
| CITY-NEAR | University of Minnesota Twin Cities | 22,522 FTE |
| CITY-NEAR | MN950 MN TELECOMMUTER | 12,021 FTE |
| CITY-NEAR | 0501 - City Center | 8,459 FTE |
| CITY-NEAR | Hennepin County Medical Center | 7,030 FTE |
| NAT-TCR | 602 - Meridian | 2.7 TCR |
| NAT-TCR | Unit #1493 | 2.7 TCR |
| NAT-TCR | Unit #0559 | 2.7 TCR |
| NAT-TCR | 951WDM | 2.7 TCR |
| NAT-SIZE | Borger Service Center-132 | 26 FTE |
| NAT-SIZE | Hydro Maintenance Bldg Wissota-1Z | 26 FTE |
| NAT-SIZE | McCoys Building Supply-El Paso | 26 FTE |
| NAT-SIZE | VA.RICHM.86 - Ricoh Usa, Inc | 26 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.