Fossil Fuel Electric Generation · Minnesota
Sherco Generating Plant
Becker, MN · ~301 workers · 4 years of OSHA Injury Tracking Application data.
- F
- Failing Safety Record
- 2.7
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Sherco Generating Plant runs at 227% of its industry's injury rate - far more dangerous than the typical Fossil Fuel Electric Generation workplace, earning a grade F.
Sherco Generating Plant: 2.7 TCR = 227% of Fossil Fuel Electric Generation BLS 1.2 · 4y Form 300A (see methodology below)
Sherco Generating Plant safety composite
Sherco Generating Plant scores strongest on fatalities (safer than 51% of same-industry peers) and weakest on dart rate (safer than 19%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
29/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- F 2.72 per 100 workers
Safer than 24% of industry peers
- DART rate
- F 1.77 per 100 workers
Safer than 19% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Rising injury rate
Sherco Generating Plant: 1.9 → 5.3 TCR
Peak year 2020 @ 5.3 TCR · DART/TCR 0.65× in 2020
Sherco Generating Plant's TCR rose 3.4 from 1.9 in 2017 to 5.3 in 2020. In 2020, DART was 0.65× this establishment's average TCR (severity share of cases).
OSHA ITA Form 300A scorecard
Establishment book 221112 · Becker, MN ABOVE-IND · MID
Grade F · TCR 2.7 · 227% of ind
- DART 1.8 DART
- RANK #10/24
- PHOTO Muscatine Power & Wa…
- BOOK 4y book
- INJ 26 inj
- SIZE ~301 FTE
Nearest TCR peer: Muscatine Power & Water Power Plant (0.0 TCR gap)
Read with this employer → · Industry book → · Minnesota employers → · Look up another →
Sherco Generating Plant in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Sherco Generating Plant
2.7 TCR
- Muscatine Powe
Muscatine Power & Water Power Plant
2.7 TCR
- Riverside Gen
Riverside Gen Plant-TK
2.7 TCR
- KCP&L - Johnso
KCP&L - Johnson County Service Center
2.7 TCR
- Jamestown CSC
Jamestown CSC
2.7 TCR
What this shows Sherco Generating Plant averages 2.7 TCR (227% of the Fossil Fuel Electric Generation BLS benchmark).
Sherco Generating Plant TCR series: 2017=1.9 · 2018=2.4 · 2019=1.2 · 2020=5.3 · BLS 1.2
Where Sherco Generating Plant falls in its industry
846 Fossil Fuel Electric Generatio establishmentsSafer than 24% of graded establishments in this industry, whose median TCR is 1.5.
Narrower to Minnesota alone (the establishments it most directly competes with for workers and contracts): ranked #10 safest of 24 Fossil Fuel Electric Generatio employers in Minnesota.
Sherco Generating Plant has more employees than the Fossil Fuel Electric Generation median and a higher injury rate than the industry's median TCR of 1.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2020 | 5.3 | 1.8 | 8 | 7 | 0 |
| 2019 | 1.2 | 0.6 | 4 | 0 | 0 |
| 2018 | 2.4 | 0.9 | 8 | 0 | 0 |
| 2017 | 1.9 | 1.3 | 6 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221112 · MN · Becker
846 Fossil Fuel Electric Generation employers nationwide with a credible TCR · 15,828 rated employers in Minnesota with headcount on file · 26 employers in Becker, MN · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Muscatine Power & Water Power Plant | 2.7 TCR |
| NAICS-TCR | Riverside Gen Plant-TK | 2.7 TCR |
| NAICS-TCR | KCP&L - Johnson County Service Center | 2.7 TCR |
| NAICS-TCR | Jamestown CSC | 2.7 TCR |
| STATE-SIZE | WM 1609 | 301 FTE |
| STATE-SIZE | Discovery Center | 301 FTE |
| STATE-SIZE | Brooklyn Park Campus | 301 FTE |
| STATE-SIZE | Ridgeview Two Twelve Medical Center Chaska | 301 FTE |
| CITY-NEAR | Sherco Gen Plant-LN | 264 FTE |
| CITY-NEAR | High School | 224 FTE |
| CITY-NEAR | City of Becker | 221 FTE |
| CITY-NEAR | Liberty Paper | 158 FTE |
| NAT-TCR | Braeburn Elementary | 2.7 TCR |
| NAT-TCR | Brooks Brothers Cabinetry, Inc. | 2.7 TCR |
| NAT-TCR | Hrc 118 | 2.7 TCR |
| NAT-TCR | Steelcraft | 2.7 TCR |
| NAT-SIZE | Information Services Department | 301 FTE |
| NAT-SIZE | Meijer Store 030 | 301 FTE |
| NAT-SIZE | Richard A. Handlon Correctional Facility | 301 FTE |
| NAT-SIZE | Meijer Inc | 301 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.