Installation of photovoltaic panels · Maryland
Solar Energy Services, Inc. Maryland Headquarters
Millersville, MD · ~38 workers · 4 years of OSHA Injury Tracking Application data.
- F
- Failing Safety Record
- 12.1
- Avg TCR
- 2.8
- Industry avg
- 0
- Fatalities
The verdict
Solar Energy Services, Inc. Maryland Headquarters runs at 434% of its industry's injury rate - far more dangerous than the typical Installation of photovoltaic panels workplace, earning a grade F.
Solar Energy Services, Inc. Maryland Headquarters: 12.1 TCR = 434% of Installation of photovoltaic panels BLS 2.8 · 4y Form 300A (see methodology below)
Solar Energy Services, Inc. Maryland Headquarters safety composite
Solar Energy Services, Inc. Maryland Headquarters scores strongest on fatalities (safer than 51% of same-industry peers) and weakest on total case rate (tcr) (safer than 2%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
15/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- F 12.14 per 100 workers
Safer than 2% of industry peers
- DART rate
- F 7.97 per 100 workers
Safer than 5% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
TCR Δ
−5.8
2020→2024
Solar Energy Services, Inc. Maryland Headquarters injury rate improved
Solar Energy Services, Inc. Maryland Headquarters's TCR fell 5.8 from 13.8 in 2020 to 8.0 in 2024. Peak filing year was 2023 at 16.5 TCR. In 2024, DART was 0.66× this establishment's average TCR (severity share of cases).
2020=13.8 · 2022=10.3 · 2023=16.5 · 2024=8.0
OSHA ITA Form 300A scorecard
Establishment book 238210 · Millersville, MD ABOVE-IND · SMALL
Grade F · TCR 12.1 · 434% of ind
- DART 8.0 DART
- RANK #76/77
- PHOTO California Retrofit …
- BOOK 4y book
- INJ 18 inj
- SIZE ~38 FTE
Nearest TCR peer: California Retrofit Inc (0.0 TCR gap)
Read with this employer → · Industry book → · Maryland employers → · Look up another →
Solar Energy Services, Inc. Maryland Headquarters in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- Cheshire Conne
Cheshire Connecticut
12.2 TCR
- United Electri
United Electric LLC
12.2 TCR
- This site
Solar Energy Services, Inc. Maryland Headquarters
12.1 TCR
- California Ret
California Retrofit Inc
12.1 TCR
- Homewood Elect
Homewood Electric
12.1 TCR
What this shows Solar Energy Services, Inc. Maryland Headquarters averages 12.1 TCR (434% of the Installation of photovoltaic panels BLS benchmark).
Solar Energy Services, Inc. Maryland Headquarters TCR series: 2020=13.8 · 2022=10.3 · 2023=16.5 · 2024=8 · BLS 2.8
Where Solar Energy Services, Inc. Maryland Headquarters falls in its industry
4,550 Installation of photovoltaic p establishmentsSafer than 2% of graded establishments in this industry, whose median TCR is 2.5.
Narrower to Maryland alone (the establishments it most directly competes with for workers and contracts): ranked #76 safest of 77 Installation of photovoltaic p employers in Maryland.
Solar Energy Services, Inc. Maryland Headquarters has fewer employees than the Installation of photovoltaic panels median and a higher injury rate than the industry's median TCR of 2.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 8.0 | 8.0 | 3 | 0 | 0 |
| 2023 | 16.5 | 11.0 | 6 | 0 | 0 |
| 2022 | 10.3 | 10.3 | 4 | 0 | 0 |
| 2020 | 13.8 | 0.0 | 5 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
238210 · MD · Millersville
4,550 Installation of photovoltaic panels employers nationwide with a credible TCR · 7,213 rated employers in Maryland with headcount on file · 30 employers in Millersville, MD · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | California Retrofit Inc | 12.1 TCR |
| NAICS-TCR | Cheshire Connecticut | 12.2 TCR |
| NAICS-TCR | Homewood Electric | 12.1 TCR |
| NAICS-TCR | United Electric LLC | 12.2 TCR |
| STATE-SIZE | MD | 38 FTE |
| STATE-SIZE | FSC - Hillen Street | 38 FTE |
| STATE-SIZE | PHRG MD RIO | 38 FTE |
| STATE-SIZE | Jeffrey Brown Contracting, LLC | 38 FTE |
| CITY-NEAR | EQR | 236 FTE |
| CITY-NEAR | 253 Najoles Rd | 214 FTE |
| CITY-NEAR | Transportation | 206 FTE |
| CITY-NEAR | L3Harris Technologies Inc-Millersville | 187 FTE |
| NAT-TCR | 0290 - Gardena | 12.1 TCR |
| NAT-TCR | St Joseph Residence Home | 12.1 TCR |
| NAT-TCR | Call Construction LLC | 12.1 TCR |
| NAT-TCR | City of Blaine Public Works | 12.1 TCR |
| NAT-SIZE | 1004-71 GoJet EWR MX | 38 FTE |
| NAT-SIZE | Mortenson Masonry, Inc | 38 FTE |
| NAT-SIZE | Hallmark Tool & Gage Co., Inc. | 38 FTE |
| NAT-SIZE | Cascade Petroleum Transportation | 38 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.