Precast concrete panel, slab, or form installation · Illinois
Waubonsee Development
Aurora, IL · ~45 workers · 8 years of OSHA Injury Tracking Application data.
- D
- Poor Safety Record
- 5.3
- Avg TCR
- 2.8
- Industry avg
- 0
- Fatalities
The verdict
Waubonsee Development runs at 189% of its industry's injury rate - more dangerous than the typical Precast concrete panel, slab, or form installation workplace, earning a grade D.
Waubonsee Development: 5.3 TCR = 189% of Precast concrete panel, slab, or form installation BLS 2.8 · 8y Form 300A (see methodology below)
Waubonsee Development safety composite
Waubonsee Development scores strongest on dart rate (safer than 80% of same-industry peers) and weakest on total case rate (tcr) (safer than 36%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
56/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- D 5.28 per 100 workers
Safer than 36% of industry peers
- DART rate
- B 0 per 100 workers
Safer than 80% of industry peers
- Fatalities
- D 0
Safer than 53% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
TCR Δ
−9.5
2016→2024
Waubonsee Development injury rate improved
Waubonsee Development's TCR fell 9.5 from 9.5 in 2016 to 0.0 in 2024. Peak filing year was 2023 at 11.3 TCR. In 2024, DART was 0× this establishment's average TCR (severity share of cases).
2016=9.5 · 2017=10.2 · 2019=2.5 · 2020=6.1 · 2021=2.7 · 2022=0.0 · 2023=11.3 · 2024=0.0
OSHA ITA Form 300A scorecard
Establishment book 238120 · Aurora, IL ABOVE-IND · SMALL
Grade D · TCR 5.3 · 189% of ind
- DART 0.0 DART
- RANK #20/30
- PHOTO Aztec Steel
- BOOK 8y book
- INJ 16 inj
- SIZE ~45 FTE
Nearest TCR peer: Aztec Steel (0.0 TCR gap)
Read with this employer → · Industry book → · Illinois employers → · Look up another →
Waubonsee Development in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Waubonsee Development
5.3 TCR
- Aztec Steel
Aztec Steel
5.3 TCR
- Washington Orn
Washington Ornamental Iron Works
5.3 TCR
- C.E. TOLAND &
C.E. TOLAND & SON
5.3 TCR
- Kinsley Steel
Kinsley Steel
5.2 TCR
What this shows Waubonsee Development averages 5.3 TCR (189% of the Precast concrete panel, slab, or form installation BLS benchmark).
Waubonsee Development TCR series: 2016=9.5 · 2017=10.2 · 2019=2.5 · 2020=6.1 · 2021=2.7 · 2022=0 · 2023=11.3 · 2024=0 · BLS 2.8
Where Waubonsee Development falls in its industry
705 Precast concrete panel, slab, establishmentsSafer than 36% of graded establishments in this industry, whose median TCR is 3.9.
Narrower to Illinois alone (the establishments it most directly competes with for workers and contracts): ranked #20 safest of 30 Precast concrete panel, slab, employers in Illinois.
Waubonsee Development has fewer employees than the Precast concrete panel, slab, or form in median and a higher injury rate than the industry's median TCR of 3.9. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2023 | 11.3 | 5.7 | 4 | 0 | 0 |
| 2022 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2021 | 2.7 | 0.0 | 1 | 0 | 0 |
| 2020 | 6.1 | 0.0 | 2 | 0 | 0 |
| 2019 | 2.5 | 2.5 | 1 | 0 | 0 |
| 2017 | 10.2 | 7.6 | 4 | 0 | 0 |
| 2016 | 9.5 | 2.4 | 4 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
238120 · IL · Aurora
705 Precast concrete panel, slab, or form installation employers nationwide with a credible TCR · 22,804 rated employers in Illinois with headcount on file · 325 employers in Aurora, IL · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Aztec Steel | 5.3 TCR |
| NAICS-TCR | Washington Ornamental Iron Works | 5.3 TCR |
| NAICS-TCR | C.E. TOLAND & SON | 5.3 TCR |
| NAICS-TCR | Kinsley Steel | 5.2 TCR |
| STATE-SIZE | 1982.1-Stonington, IL-Mfg (Monsanto Co.) | 45 FTE |
| STATE-SIZE | Farmer City | 45 FTE |
| STATE-SIZE | 91P - Distribution Operating - Decatur | 45 FTE |
| STATE-SIZE | AMEREN ILLINOIS - Sparta | 45 FTE |
| CITY-NEAR | Indian Prairie School District 204 | 3,309 FTE |
| CITY-NEAR | Factor Aurora | 2,167 FTE |
| CITY-NEAR | Rush Copley Medical Center, Inc. | 2,163 FTE |
| CITY-NEAR | ANDY FRAIN SERVICES INC | 2,100 FTE |
| NAT-TCR | Clark Mechanical Services Inc. | 5.3 TCR |
| NAT-TCR | Careone at Valley | 5.3 TCR |
| NAT-TCR | Wepfer Marine of Greenville | 5.3 TCR |
| NAT-TCR | Pataskala | 5.3 TCR |
| NAT-SIZE | CCL Sleeve | 45 FTE |
| NAT-SIZE | Central Roofing | 45 FTE |
| NAT-SIZE | Roberds Converting Co, Inc. | 45 FTE |
| NAT-SIZE | New Jersey | 45 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.