Nuclear Electric Power Generation · Kansas
Wolf Creek Generating Station
Burlington, KS · ~937 workers · 3 years of OSHA Injury Tracking Application data.
- A
- Excellent Safety Record
- 0.1
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Wolf Creek Generating Station runs at 6% of its industry's injury rate - far safer than the typical Nuclear Electric Power Generation workplace, earning a grade A.
Wolf Creek Generating Station: 0.1 TCR = 6% of Nuclear Electric Power Generation BLS 1.2 · 3y Form 300A (see methodology below)
Wolf Creek Generating Station safety composite
Wolf Creek Generating Station scores strongest on total case rate (tcr) (safer than 90% of same-industry peers) and weakest on fatalities (safer than 50%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
72/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- A 0.07 per 100 workers
Safer than 90% of industry peers
- DART rate
- C 0 per 100 workers
Safer than 66% of industry peers
- Fatalities
- D 0
Safer than 50% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Wolf Creek Generating Station held a steady TCR band
Wolf Creek Generating Station's TCR held near 0.2 from 0.2 in 2019 to 0.0 in 2024. Peak filing year was 2019 at 0.2 TCR. In 2024, DART was 0× this establishment's average TCR (severity share of cases).
2019=0.2 · 2023=0.0 · 2024=0.0
OSHA ITA Form 300A scorecard
Establishment book 221113 · Burlington, KS AT/BELOW-IND · MID
Grade A · TCR 0.1 · 6% of ind
- DART 0.0 DART
- RANK P90
- PHOTO Oconee Nuclear
- BOOK 3y book
- INJ 2 inj
- SIZE ~937 FTE
Nearest TCR peer: Oconee Nuclear (0.0 TCR gap)
Read with this employer → · Industry book → · Kansas employers → · Look up another →
Wolf Creek Generating Station in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site 0.1
Wolf Creek Generating Station
0.1 TCR
- Oconee Nuclear 0.1
Oconee Nuclear
0.1 TCR
- Davis Besse 0.1
Davis Besse
0.1 TCR
- South Texas Pr 0.1
South Texas Project Nuclear Operating Company
0.1 TCR
- Nextera Energy 0.1
Nextera Energy Point Beach Nuclear Plant
0.1 TCR
What this shows Wolf Creek Generating Station averages 0.1 TCR (6% of the Nuclear Electric Power Generation BLS benchmark).
Wolf Creek Generating Station TCR series: 2019=0.2 · 2023=0 · 2024=0 · BLS 1.2
Where Wolf Creek Generating Station falls in its industry
80 Nuclear Electric Power Generat establishmentsSafer than 90% of graded establishments in this industry, whose median TCR is 0.2.
Wolf Creek Generating Station has more employees than the Nuclear Electric Power Generation median and a lower injury rate than the industry's median TCR of 0.2. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2023 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2019 | 0.2 | 0.1 | 2 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221113 · KS · Burlington
80 Nuclear Electric Power Generation employers nationwide with a credible TCR · 5,228 rated employers in Kansas with headcount on file · 10 employers in Burlington, KS · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Oconee Nuclear | 0.1 TCR |
| NAICS-TCR | Davis Besse | 0.1 TCR |
| NAICS-TCR | South Texas Project Nuclear Operating Company | 0.1 TCR |
| NAICS-TCR | Nextera Energy Point Beach Nuclear Plant | 0.1 TCR |
| STATE-SIZE | NMC Health | 933 FTE |
| STATE-SIZE | Wilbert Funeral Services Inc | 950 FTE |
| STATE-SIZE | 3803 - Topeka DC | 922 FTE |
| STATE-SIZE | Menorah Medical Center | 922 FTE |
| CITY-NEAR | Wolf Creek Nuclear Operating Corporation. | 1,225 FTE |
| CITY-NEAR | Wolf Creek - Evergy | 1,085 FTE |
| CITY-NEAR | Burlington Medical Investors LLC dba Life Care Center of Burlington | 84 FTE |
| CITY-NEAR | Life Care Centers of Burlington | 73 FTE |
| NAT-TCR | Gaglk - 35 Glenlake Building | 0.1 TCR |
| NAT-TCR | Mdroa - Is Maryland | 0.1 TCR |
| NAT-TCR | Action Industries Inc. | 0.1 TCR |
| NAT-TCR | Baxter Aibonito | 0.1 TCR |
| NAT-SIZE | Echo Maintenance LLC | 937 FTE |
| NAT-SIZE | Exit 76 Corporation | 937 FTE |
| NAT-SIZE | St. Francis Regional | 937 FTE |
| NAT-SIZE | Pentair Sanford Hawkins Ave | 937 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.