Electrical power measuring equipment manufacturing · Colorado

Continental Control Systems, LLC

Longmont, CO · ~20 workers · 5 years of OSHA Injury Tracking Application data.

C
Average Safety Record
3.9
Avg TCR
3.3
Industry avg
0
Fatalities
Subscribe to safety-record updates (RSS)

The verdict

Continental Control Systems, LLC runs at 118% of its industry's injury rate - about level with the typical Electrical power measuring equipment manufacturing workplace, earning a grade C.

Continental Control Systems, LLC: 3.9 TCR = 118% of Electrical power measuring equipment manufacturing BLS 3.3 · 5y Form 300A (see methodology below)

Continental Control Systems, LLC safety composite

Continental Control Systems, LLC scores strongest on dart rate (safer than 68% of same-industry peers) and weakest on total case rate (tcr) (safer than 8%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).

D

40/100

Percentile-weighted across 3 of 3 measures

Total Case Rate (TCR)
F 3.88 per 100 workers

Safer than 8% of industry peers

DART rate
C 0 per 100 workers

Safer than 68% of industry peers

Fatalities
D 0

Safer than 50% of industry peers

Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).

TCR Δ

−6.8

2017→2021

Continental Control Systems, LLC injury rate improved

Continental Control Systems, LLC's TCR fell 6.8 from 6.8 in 2017 to 0.0 in 2021. Peak filing year was 2017 at 6.8 TCR. In 2021, DART was 0× this establishment's average TCR (severity share of cases).

2017=6.8 · 2018=0.0 · 2019=6.7 · 2020=5.9 · 2021=0.0

OSHA ITA Form 300A scorecard

Establishment book 334515 · Longmont, CO ABOVE-IND · SMALL

Grade C · TCR 3.9 · 118% of ind

  • DART 0.0 DART
  • RANK #5/5
  • PHOTO Teledyne Lecroy
  • BOOK 5y book
  • INJ 3 inj
  • SIZE ~20 FTE

Nearest TCR peer: Teledyne Lecroy (0.2 TCR gap)

Read with this employer → · Industry book → · Colorado employers → · Look up another →

Continental Control Systems, LLC in the TCR neighbourhood

Average Total Case Rate among this establishment and nearest same-industry peers

TCR

What this shows Continental Control Systems, LLC averages 3.9 TCR (118% of the Electrical power measuring equipment manufacturing BLS benchmark).

Source U.S. Department of Labor, OSHA Injury Tracking Application (Form 300A) As of 2026-08-25

Continental Control Systems, LLC TCR series: 2017=6.8 · 2018=0 · 2019=6.7 · 2020=5.9 · 2021=0 · BLS 3.3

Where Continental Control Systems, LLC falls in its industry

125 Electrical power measuring equ establishments

Safer than 8% of graded establishments in this industry, whose median TCR is 0.9.

More dangerous than peersSafer than peers

Narrower to Colorado alone (the establishments it most directly competes with for workers and contracts): ranked #5 safest of 5 Electrical power measuring equ employers in Colorado.

Continental Control Systems, LLC (20 employees, TCR 3.9) among 29 same-industry peers, split at the industry median of 86 employees and a TCR of 0.9 2×2 strategic matrix plotting 30 entities by Average employees (X) and Total Case Rate (Y), with a crosshair dividing the plot into four quadrants. Larger & higher-riskSmaller & higher-riskLarger & saferSmaller & safer than peers 05001,0001,5002,0002,500 05101520 Average employees Total Case Rate Continental Control Systems, LLC
Continental Control Systems, LLC (20 employees, TCR 3.9) among 29 same-industry peers, split at the industry median of 86 employees and a TCR of 0.9

Continental Control Systems, LLC has fewer employees than the Electrical power measuring equipment man median and a higher injury rate than the industry's median TCR of 0.9. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.

Year-by-Year Safety Data

Year TCR DART Injuries Illnesses Fatalities
2021 0.0 0.0 0 0 0
2020 5.9 5.9 1 0 0
2019 6.7 6.7 1 0 0
2018 0.0 0.0 0 0 0
2017 6.8 0.0 1 0 0

OSHA ITA peer cross-reference

Establishment peer ledger

334515 · CO · Longmont

125 Electrical power measuring equipment manufacturing employers nationwide with a credible TCR · 9,007 rated employers in Colorado with headcount on file · 182 employers in Longmont, CO · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.

Rel Establishment Metric
NAICS-TCR Teledyne Lecroy 4.0 TCR
NAICS-TCR HI-Honolulu 3.6 TCR
NAICS-TCR JEM America Corp. 3.4 TCR
NAICS-TCR Fluke Electronics- Evergreen Way 3.3 TCR
STATE-SIZE Trulieve - Monroe 20 FTE
STATE-SIZE Bledsoe Cattle Co. 20 FTE
STATE-SIZE Frederick 20 FTE
STATE-SIZE Ravenwood 20 FTE
CITY-NEAR Longmont, CO 1,167 FTE
CITY-NEAR Longmont United Hospital 638 FTE
CITY-NEAR 2643-05500001-055001 562 FTE
CITY-NEAR Longs Peak Hospital 537 FTE
NAT-TCR Kraemer North America - Minnesota All Other 3.9 TCR
NAT-TCR Tate Access Floors 3.9 TCR
NAT-TCR Harcourt Terrace Nursing and Rehabilitation 3.9 TCR
NAT-TCR Company Wide 3.9 TCR
NAT-SIZE Lester Feed & Grain 20 FTE
NAT-SIZE Tulare Warehouse - Langston Companies Inc. 20 FTE
NAT-SIZE Fragra*Matics 20 FTE
NAT-SIZE Azura Memory Care of Sheboygan 20 FTE

Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →

Data Source: OSHA Injury Tracking Application (ITA), mandatory establishment-level injury/illness reports. Grades compare employer Total Case Rate (TCR) to BLS IIF industry benchmarks. Data covers years reported by this establishment: 2021, 2020, 2019, 2018, 2017. This is publicly available government data - not a legal determination of workplace conditions.
Data sourced from official public datasets. See our methodology for details.