Fossil Fuel Electric Power Generation · Alabama
Gaston Steam Plant - APC
Wilsonville, AL · ~253 workers · 2 years of OSHA Injury Tracking Application data.
- B
- Good Safety Record
- 0.8
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Gaston Steam Plant - APC runs at 66% of its industry's injury rate - safer than the typical Fossil Fuel Electric Power Generation workplace, earning a grade B.
Gaston Steam Plant - APC: 0.8 TCR = 66% of Fossil Fuel Electric Power Generation BLS 1.2 · 2y Form 300A (see methodology below)
Gaston Steam Plant - APC safety composite
Gaston Steam Plant - APC scores strongest on total case rate (tcr) (safer than 75% of same-industry peers) and weakest on fatalities (safer than 51%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
68/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- B 0.79 per 100 workers
Safer than 75% of industry peers
- DART rate
- C 0 per 100 workers
Safer than 71% of industry peers
- Fatalities
- D 0
Safer than 51% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Gaston Steam Plant - APC held a steady TCR band
Gaston Steam Plant - APC's TCR held near 0.0 from 0.8 in 2023 to 0.8 in 2024. Peak filing year was 2023 at 0.8 TCR. In 2024, DART was 0× this establishment's average TCR (severity share of cases).
2023=0.8 · 2024=0.8
OSHA ITA Form 300A scorecard
Establishment book 221112 · Wilsonville, AL AT/BELOW-IND · MID
Grade B · TCR 0.8 · 66% of ind
- DART 0.0 DART
- RANK #4/28
- PHOTO Pastoria Energy Faci…
- BOOK 2y book
- INJ 4 inj
- SIZE ~253 FTE
Nearest TCR peer: Pastoria Energy Facility (0.0 TCR gap)
Read with this employer → · Industry book → · Alabama employers → · Look up another →
Gaston Steam Plant - APC in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site
Gaston Steam Plant - APC
0.8 TCR
- Pastoria Energ
Pastoria Energy Facility
0.8 TCR
- Eddystone
Eddystone
0.8 TCR
- JH Campbell 1&
JH Campbell 1&2
0.8 TCR
- Generation Fos
Generation Fossil Greene County Steam Plant
0.8 TCR
What this shows Gaston Steam Plant - APC averages 0.8 TCR (66% of the Fossil Fuel Electric Power Generation BLS benchmark).
Gaston Steam Plant - APC TCR series: 2023=0.8 · 2024=0.8 · BLS 1.2
Where Gaston Steam Plant - APC falls in its industry
846 Fossil Fuel Electric Power Gen establishmentsSafer than 75% of graded establishments in this industry, whose median TCR is 1.5.
Narrower to Alabama alone (the establishments it most directly competes with for workers and contracts): ranked #4 safest of 28 Fossil Fuel Electric Power Gen employers in Alabama.
Gaston Steam Plant - APC has more employees than the Fossil Fuel Electric Power Generation median and a lower injury rate than the industry's median TCR of 1.5. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 0.8 | 0.0 | 2 | 0 | 0 |
| 2023 | 0.8 | 0.8 | 2 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221112 · AL · Wilsonville
846 Fossil Fuel Electric Power Generation employers nationwide with a credible TCR · 7,418 rated employers in Alabama with headcount on file · 7 employers in Wilsonville, AL · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Pastoria Energy Facility | 0.8 TCR |
| NAICS-TCR | Eddystone | 0.8 TCR |
| NAICS-TCR | JH Campbell 1&2 | 0.8 TCR |
| NAICS-TCR | Generation Fossil Greene County Steam Plant | 0.8 TCR |
| STATE-SIZE | M & H Valve Company | 253 FTE |
| STATE-SIZE | Andalusia Health | 253 FTE |
| STATE-SIZE | Alabama Power Company - Miller Plant | 252 FTE |
| STATE-SIZE | Bolta US | 252 FTE |
| CITY-NEAR | Fossil Generation E.C. Gaston Steam Plant | 280 FTE |
| CITY-NEAR | Generation Fossil Gaston Steam Plant | 264 FTE |
| CITY-NEAR | Gaston Steam Plant | 251 FTE |
| CITY-NEAR | Gaston Fossil Plant | 217 FTE |
| NAT-TCR | Pensacola Mill | 0.8 TCR |
| NAT-TCR | JX Enterprises, Inc. | 0.8 TCR |
| NAT-TCR | Alltrista Plastics LLC | 0.8 TCR |
| NAT-TCR | Wichita Service Center | 0.8 TCR |
| NAT-SIZE | Colov - Loveland Co | 253 FTE |
| NAT-SIZE | Lecoq Cuisine | 253 FTE |
| NAT-SIZE | MALDEN-MA19 | 253 FTE |
| NAT-SIZE | 300000170855648 - IL-Edwardsville-Operating Center | 253 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.