Electric power generation, nuclear · Illinois
Clinton Power Station
Clinton, IL · ~514 workers · 9 years of OSHA Injury Tracking Application data.
- A
- Excellent Safety Record
- 0.1
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Clinton Power Station runs at 12% of its industry's injury rate - far safer than the typical Electric power generation, nuclear workplace, earning a grade A.
Clinton Power Station: 0.1 TCR = 12% of Electric power generation, nuclear BLS 1.2 · 9y Form 300A (see methodology below)
Clinton Power Station safety composite
Clinton Power Station scores strongest on total case rate (tcr) (safer than 68% of same-industry peers) and weakest on fatalities (safer than 50%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
63/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- C 0.14 per 100 workers
Safer than 68% of industry peers
- DART rate
- C 0 per 100 workers
Safer than 66% of industry peers
- Fatalities
- D 0
Safer than 50% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Clinton Power Station held a steady TCR band
Clinton Power Station's TCR held near 0.2 from 0.2 in 2016 to 0.0 in 2024. Peak filing year was 2023 at 0.4 TCR. In 2024, DART was 0× this establishment's average TCR (severity share of cases).
2016=0.2 · 2017=0.0 · 2018=0.1 · 2019=0.0 · 2020=0.4 · 2021=0.0 · 2022=0.2 · 2023=0.4 · 2024=0.0
OSHA ITA Form 300A scorecard
Establishment book 221113 · Clinton, IL AT/BELOW-IND · MID
Grade A · TCR 0.1 · 12% of ind
- DART 0.0 DART
- RANK #4/12
- PHOTO Limerick Generating …
- BOOK 9y book
- INJ 3 inj
- SIZE ~514 FTE
Nearest TCR peer: Limerick Generating Station (0.0 TCR gap)
Read with this employer → · Industry book → · Illinois employers → · Look up another →
Clinton Power Station in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site 0.1
Clinton Power Station
0.1 TCR
- Limerick Gener 0.1
Limerick Generating Station
0.1 TCR
- Comanche Peak 0.1
Comanche Peak Nuclear Power Plant
0.1 TCR
- Robinson Nucle 0.1
Robinson Nuclear Plant
0.1 TCR
- Fitzpatrick Nu 0.1
Fitzpatrick Nuclear Power Plant
0.1 TCR
What this shows Clinton Power Station averages 0.1 TCR (12% of the Electric power generation, nuclear BLS benchmark).
Clinton Power Station TCR series: 2016=0.2 · 2017=0 · 2018=0.1 · 2019=0 · 2020=0.4 · 2021=0 · 2022=0.2 · 2023=0.4 · 2024=0 · BLS 1.2
Where Clinton Power Station falls in its industry
80 Electric power generation, nuc establishmentsSafer than 68% of graded establishments in this industry, whose median TCR is 0.2.
Narrower to Illinois alone (the establishments it most directly competes with for workers and contracts): ranked #4 safest of 12 Electric power generation, nuc employers in Illinois.
Clinton Power Station has fewer employees than the Electric power generation, nuclear median and a lower injury rate than the industry's median TCR of 0.2. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2023 | 0.4 | 0.1 | 2 | 1 | 0 |
| 2022 | 0.2 | 0.2 | 0 | 1 | 0 |
| 2021 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2020 | 0.4 | 0.3 | 0 | 3 | 0 |
| 2019 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2018 | 0.1 | 0.1 | 1 | 0 | 0 |
| 2017 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2016 | 0.2 | 0.2 | 0 | 1 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221113 · IL · Clinton
80 Electric power generation, nuclear employers nationwide with a credible TCR · 22,804 rated employers in Illinois with headcount on file · 27 employers in Clinton, IL · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Limerick Generating Station | 0.1 TCR |
| NAICS-TCR | Comanche Peak Nuclear Power Plant | 0.1 TCR |
| NAICS-TCR | Robinson Nuclear Plant | 0.1 TCR |
| NAICS-TCR | Fitzpatrick Nuclear Power Plant | 0.1 TCR |
| STATE-SIZE | Vee Pak - Countryside, IL | 514 FTE |
| STATE-SIZE | Central Steel & Wire - Chicago | 514 FTE |
| STATE-SIZE | WM 256 | 514 FTE |
| STATE-SIZE | 6795-99625B0499 | 514 FTE |
| CITY-NEAR | Custom-Pak Group A/Group B/PDC/Corp | 329 FTE |
| CITY-NEAR | Warner Hospital & Health Services | 145 FTE |
| CITY-NEAR | Liberty Village of Clinton | 138 FTE |
| CITY-NEAR | Altorfer Inc. - Clinton, IL - 9670 Tabor Road | 124 FTE |
| NAT-TCR | Limerick Generating Station | 0.1 TCR |
| NAT-TCR | Gilbane Building Company Jacksonville | 0.1 TCR |
| NAT-TCR | Selmer Lubes | 0.1 TCR |
| NAT-TCR | Dawn Food Products - Home Office | 0.1 TCR |
| NAT-SIZE | The Lincoln Electric Company - Mentor | 514 FTE |
| NAT-SIZE | Scottsville, DC | 514 FTE |
| NAT-SIZE | Red Onion State Prison | 514 FTE |
| NAT-SIZE | Physicians Regional Healthcare System -Collier | 514 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.