Electric power generation, nuclear · Texas
Comanche Peak Nuclear Power Plant
Glen Rose, TX · ~672 workers · 8 years of OSHA Injury Tracking Application data.
- A
- Excellent Safety Record
- 0.1
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Comanche Peak Nuclear Power Plant runs at 12% of its industry's injury rate - far safer than the typical Electric power generation, nuclear workplace, earning a grade A.
Comanche Peak Nuclear Power Plant: 0.1 TCR = 12% of Electric power generation, nuclear BLS 1.2 · 8y Form 300A (see methodology below)
Comanche Peak Nuclear Power Plant safety composite
Comanche Peak Nuclear Power Plant scores strongest on total case rate (tcr) (safer than 68% of same-industry peers) and weakest on dart rate (safer than 20%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
47/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- C 0.14 per 100 workers
Safer than 68% of industry peers
- DART rate
- F 0.14 per 100 workers
Safer than 20% of industry peers
- Fatalities
- D 0
Safer than 50% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Comanche Peak Nuclear Power Plant held a steady TCR band
Comanche Peak Nuclear Power Plant's TCR held near 0.3 from 0.1 in 2016 to 0.4 in 2024. In 2024, DART was 1× this establishment's average TCR (severity share of cases).
2016=0.1 · 2017=0.0 · 2019=0.0 · 2020=0.3 · 2021=0.1 · 2022=0.1 · 2023=0.0 · 2024=0.4
OSHA ITA Form 300A scorecard
Establishment book 221113 · Glen Rose, TX AT/BELOW-IND · MID
Grade A · TCR 0.1 · 12% of ind
- DART 0.1 DART
- RANK P68
- PHOTO Clinton Power Station
- BOOK 8y book
- INJ 7 inj
- SIZE ~672 FTE
Nearest TCR peer: Clinton Power Station (0.0 TCR gap)
Read with this employer → · Industry book → · Texas employers → · Look up another →
Comanche Peak Nuclear Power Plant in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- This site 0.1
Comanche Peak Nuclear Power Plant
0.1 TCR
- Clinton Power 0.1
Clinton Power Station
0.1 TCR
- Limerick Gener 0.1
Limerick Generating Station
0.1 TCR
- Robinson Nucle 0.1
Robinson Nuclear Plant
0.1 TCR
- Fitzpatrick Nu 0.1
Fitzpatrick Nuclear Power Plant
0.1 TCR
What this shows Comanche Peak Nuclear Power Plant averages 0.1 TCR (12% of the Electric power generation, nuclear BLS benchmark).
Comanche Peak Nuclear Power Plant TCR series: 2016=0.1 · 2017=0 · 2019=0 · 2020=0.3 · 2021=0.1 · 2022=0.1 · 2023=0 · 2024=0.4 · BLS 1.2
Where Comanche Peak Nuclear Power Plant falls in its industry
80 Electric power generation, nuc establishmentsSafer than 68% of graded establishments in this industry, whose median TCR is 0.2.
Comanche Peak Nuclear Power Plant has more employees than the Electric power generation, nuclear median and a lower injury rate than the industry's median TCR of 0.2. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2024 | 0.4 | 0.1 | 3 | 0 | 0 |
| 2023 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2022 | 0.1 | 0.0 | 1 | 0 | 0 |
| 2021 | 0.1 | 0.0 | 1 | 0 | 0 |
| 2020 | 0.3 | 0.1 | 1 | 1 | 0 |
| 2019 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2017 | 0.0 | 0.0 | 0 | 0 | 0 |
| 2016 | 0.1 | 0.0 | 1 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221113 · TX · Glen Rose
80 Electric power generation, nuclear employers nationwide with a credible TCR · 38,394 rated employers in Texas with headcount on file · 11 employers in Glen Rose, TX · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Clinton Power Station | 0.1 TCR |
| NAICS-TCR | Limerick Generating Station | 0.1 TCR |
| NAICS-TCR | Robinson Nuclear Plant | 0.1 TCR |
| NAICS-TCR | Fitzpatrick Nuclear Power Plant | 0.1 TCR |
| STATE-SIZE | TX_San Antonio_10130 Highway 151_ TWCUSHWY | 672 FTE |
| STATE-SIZE | 2576-62 | 672 FTE |
| STATE-SIZE | San Antonio, DC | 671 FTE |
| STATE-SIZE | Baylor Medical Center at McKinney | 673 FTE |
| CITY-NEAR | Glen Rose Medical Center | 223 FTE |
| CITY-NEAR | Power Glen Rose Plant | 141 FTE |
| CITY-NEAR | Glen Rose Nursing and Rehab | 110 FTE |
| CITY-NEAR | Fossil Rim Wildlife Center | 96 FTE |
| NAT-TCR | Livermore, CA - 5699 Las Positas Road | 0.1 TCR |
| NAT-TCR | Dubak Electrical Maintenance Corporation | 0.1 TCR |
| NAT-TCR | Arkema, Inc. King of Prussia | 0.1 TCR |
| NAT-TCR | National Inspection Services, LLC | 0.1 TCR |
| NAT-SIZE | Moses Lake, WA | 672 FTE |
| NAT-SIZE | DEP001 - DEEP Central Office | 672 FTE |
| NAT-SIZE | NC_Charlotte_8336 Forest Point Blvd_NC017900 | 672 FTE |
| NAT-SIZE | Tulsa General Ofc | 672 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.