Electric power generation, hydroelectric · Oregon
Eugene Water & Electric Board
Eugene, OR · ~495 workers · 2 years of OSHA Injury Tracking Application data.
- F
- Failing Safety Record
- 3.7
- Avg TCR
- 1.2
- Industry avg
- 0
- Fatalities
The verdict
Eugene Water & Electric Board runs at 309% of its industry's injury rate - far more dangerous than the typical Electric power generation, hydroelectric workplace, earning a grade F.
Eugene Water & Electric Board: 3.7 TCR = 309% of Electric power generation, hydroelectric BLS 1.2 · 2y Form 300A (see methodology below)
Eugene Water & Electric Board safety composite
Eugene Water & Electric Board scores strongest on fatalities (safer than 52% of same-industry peers) and weakest on dart rate (safer than 19%), blended into one 0-100 breakdown against same-industry peers. A missing measure drops out and redistributes its weight rather than deflating the score. This is a per-dimension breakdown, distinct from the single letter grade above it (which weights TCR alone against the BLS industry benchmark).
36/100
Percentile-weighted across 3 of 3 measures
- Total Case Rate (TCR)
- D 3.71 per 100 workers
Safer than 40% of industry peers
- DART rate
- F 3.56 per 100 workers
Safer than 19% of industry peers
- Fatalities
- D 0
Safer than 52% of industry peers
Benchmarked live against every credibly-rated employer in the same NAICS industry code in the current OSHA extract (a segment must have at least 8 rated peers to benchmark). Not a legal or compliance determination; PlainSafetyScore's own weighting (TCR 40%, DART 35%, fatalities 25%).
Rising injury rate
Eugene Water & Electric Board: 3.4 → 4.0 TCR
Peak year 2018 @ 4.0 TCR · DART/TCR 0.96× in 2018
Eugene Water & Electric Board's TCR rose 0.6 from 3.4 in 2016 to 4.0 in 2018. In 2018, DART was 0.96× this establishment's average TCR (severity share of cases).
OSHA ITA Form 300A scorecard
Establishment book 221111 · Eugene, OR ABOVE-IND · MID
Grade F · TCR 3.7 · 309% of ind
- DART 3.6 DART
- RANK #3/5
- PHOTO Brookfield Renewable…
- BOOK 2y book
- INJ 35 inj
- SIZE ~495 FTE
Nearest TCR peer: Brookfield Renewable - Hudson (0.0 TCR gap)
Read with this employer → · Industry book → · Oregon employers → · Look up another →
Eugene Water & Electric Board in the TCR neighbourhood
Average Total Case Rate among this establishment and nearest same-industry peers
- Grant County P
Grant County PUD#2 - Power Delivery
3.8 TCR
- Chelan County
Chelan County PUD (Overall Organization Totals)
3.8 TCR
- This site
Eugene Water & Electric Board
3.7 TCR
- Brookfield Ren
Brookfield Renewable - Hudson
3.7 TCR
- Site Bulk Mate
Site Bulk Material Handling
3.6 TCR
What this shows Eugene Water & Electric Board averages 3.7 TCR (309% of the Electric power generation, hydroelectric BLS benchmark).
Eugene Water & Electric Board TCR series: 2016=3.4 · 2018=4 · BLS 1.2
Where Eugene Water & Electric Board falls in its industry
129 Electric power generation, hyd establishmentsSafer than 40% of graded establishments in this industry, whose median TCR is 3.3.
Narrower to Oregon alone (the establishments it most directly competes with for workers and contracts): ranked #3 safest of 5 Electric power generation, hyd employers in Oregon.
Eugene Water & Electric Board has more employees than the Electric power generation, hydroelectric median and a higher injury rate than the industry's median TCR of 3.3. Workforce size and injury rate do not always move together within the same industry -- some of its smaller peers run higher rates than its larger ones, and vice versa.
Year-by-Year Safety Data
| Year | TCR | DART | Injuries | Illnesses | Fatalities |
|---|---|---|---|---|---|
| 2018 | 4.0 | 3.6 | 18 | 0 | 0 |
| 2016 | 3.4 | 2.6 | 17 | 0 | 0 |
OSHA ITA peer cross-reference
Establishment peer ledger
221111 · OR · Eugene
129 Electric power generation, hydroelectric employers nationwide with a credible TCR · 8,031 rated employers in Oregon with headcount on file · 466 employers in Eugene, OR · 4 cross-state NAT-TCR peers · 4 cross-state NAT-SIZE peers. Closest matches by relationship code are listed below.
| Rel | Establishment | Metric |
|---|---|---|
| NAICS-TCR | Brookfield Renewable - Hudson | 3.7 TCR |
| NAICS-TCR | Grant County PUD#2 - Power Delivery | 3.8 TCR |
| NAICS-TCR | Site Bulk Material Handling | 3.6 TCR |
| NAICS-TCR | Chelan County PUD (Overall Organization Totals) | 3.8 TCR |
| STATE-SIZE | St Charles Health System Redmond | 495 FTE |
| STATE-SIZE | Powin, LLC. | 494 FTE |
| STATE-SIZE | Eugene Water and Electric Board | 493 FTE |
| STATE-SIZE | PNW Veg Co LLC dba Norpac | 497 FTE |
| CITY-NEAR | MATT KNIGHT ARENA | 863 FTE |
| CITY-NEAR | Hult Center for the Performing Arts | 861 FTE |
| CITY-NEAR | PHMG PHOR Clinics | 848 FTE |
| CITY-NEAR | SHMC at University District | 564 FTE |
| NAT-TCR | PAM Specialty Hospital of Texarkana North | 3.7 TCR |
| NAT-TCR | 1601 Wise Plastics Technologies | 3.7 TCR |
| NAT-TCR | BMH-Union CO | 3.7 TCR |
| NAT-TCR | Infusion Partners - 1030 | 3.7 TCR |
| NAT-SIZE | Main Office | 495 FTE |
| NAT-SIZE | Navajo Generating Station | 495 FTE |
| NAT-SIZE | Middle Atlantic Products-Fairfield | 495 FTE |
| NAT-SIZE | Precision Dialogue | 495 FTE |
Rel codes: NAICS-TCR · STATE-SIZE · CITY-NEAR · NAT-TCR/NAT-SIZE cross-state. Read with this employer →
Read our methodology - how this data is sourced, computed, and verified.